Continuous Solvent Recovery Process Using Pulse Contacting Column

Description: From abstract: "This report presents the progress in the laboratory development of a continuous solvent recovery process for the tributyl phosphate-diluent mixture used in the Purex Process. Investigations were made with 1/2" diameter pulse columns, using a nine foot sodium carbonate contacting column and a four foot water wash column."
Date: April 1, 1952
Creator: Ellison, C. V. & Land, J. F.
Partner: UNT Libraries Government Documents Department
open access

Homogeneous Reactor Project Quarterly Progress Report: November 15, 1951

Description: From summary: "Construction of the HRE facility was essentially complete on November 15, 1951 except for minor revisions and final testing. A program of engineering and nuclear tests of the system hasbeen drawn up, and the tests will be started early in the next quarter. The only major HRE items for which design is not complete are the samplers for the fuel, [gas], and reflector systems. These will be completed in time to be installed before critical experiments begin; meanwhile, temporary samp… more
Date: April 1, 1952
Creator: Swartout, J. A.; Secoy, C. H.; Welton, T. A.; Winters, C. E. & Thompson, W. E.
Partner: UNT Libraries Government Documents Department
open access

Summary of Operating Experience with Decelerating Ion Receivers

Description: From abstract: "The following report presents a summary of operating experience with decelerating receivers for ion beam reception. Sample calculations for design of such a receiver for the isotopes of lithium are presented. Estimates of maximum production and requirements to attain such production are given. The maximum ion beam envisioned is 17 amperes obtained from extrapolation of experimental results."
Date: April 1, 1952
Creator: Wilkinson, P. E. & Keim, C. P.
Partner: UNT Libraries Government Documents Department