Search Results

open access

1: Mass asymmetric fission barriers for {sup 98}Mo; 2: Synthesis and characterization of actinide-specific chelating agents

Description: Excitation functions have been measured for complex fragment emission from the compound nucleus {sup 98}Mo, produced by the reaction of {sup 86}Kr with {sup 12}C. Mass asymmetric fission barriers have been obtained by fitting the excitation functions with a transition state formalism. The extracted barriers are {approximately} 5.7 MeV higher, on average, than the calculations of the Rotating Finite Range Model (RFRM). These data clearly show an isospin dependence of the conditional barriers when compared with the extracted barriers from {sup 90}Mo and {sup 94}Mo. Eleven different liquid/liquid extractants were synthesized based upon the chelating moieties 3,2-HOPO and 3,4-HOPO; additionally, two liquid/liquid extractants based upon the 1,2-HOPO chelating moiety were obtained for extraction studies. The Pu(IV) extractions, quite surprisingly, yielded results that were very different from the Fe(III) extractions. The first trend remained the same: the 1,2-HOPOs were the best extractants, followed closely by the 3,2-HOPOs, followed by the 3,4-HOPOs; but in these Pu(IV) extractions the 3,4-HOPOs performed much better than in the Fe(III) extractions. 129 refs.
Date: August 1, 1996
Creator: Veeck, A. C.
Partner: UNT Libraries Government Documents Department
open access

THE (5-PHENYL-2-OXAZOLYL)PYRIDINES AS FLUORESCENT pH INDICATORS. AN APPLICATION TO CHEMICAL RADIATION DOSIMETRY

Description: The three isomeric (5-phenyl-2-oxazolyl)pyridines have been shown to be sensitive fluorescent pH indicators which show a pronounced change to increased visible fluorescence as the pH is lowered. Absorption and fluorescence spectral data and pK values are given. Selective excitation of fluorescence from the conjugate acid in the presence of the free base was found possible. The sensitivity of the 4-isomer was demonstrated to be adequate for determining the small amounts of acid produced in certain chemical dosimeter systems. (auth)
Date: August 1, 1958
Creator: Ott, D.G.
Partner: UNT Libraries Government Documents Department
open access

6-D weak-strong beam-beam simulation study of proton lifetime in presence of head-on beam-beam compensation in the RHIC

Description: In this note we summarize the calculated particle loss of a proton bunch in the presence of head-on beam-beam compensation in the Relativistic Heavy Ion Collider (RHIC). To compensate the head-on beam-beam effect in the RHIC 250 GeV polarized proton run, we are introducing a DC electron beam with the same transverse profile as the proton beam to collide with the proton beam. Such a device is called an electron lens (e-lens). In this note we first present the optics and beam parameters and the tracking setup. Then we calculate and compare the particle loss of a proton bunch with head-on beam-beam compensation, phase advance of k{pi} between IP8 and the center of the e-lens and second order chromaticity correction. We scanned the proton beam's linear chromaticity, working point and bunch intensity. We also scanned the electron beam's intensity, transverse beam size. The effect of the electron-proton transverse offset in the e-lens was studied. In the study 6-D weak-strong beam-beam interaction model a la Hirata is used for proton collisions at IP6 and IP8. The e-lens is modeled as 8 slices. Each slice is modeled with as drift - (4D beam-beam kick) - drift.
Date: August 1, 2010
Creator: Luo, Y. & Fischer, W.
Partner: UNT Libraries Government Documents Department
open access

10 kW SOFC POWER SYSTEM COMMERCIALIZATION

Description: The program is organized into three developmental periods. In Phase 1 the team will develop and demonstrate a proof-of-concept prototype design and develop a manufacturing plan to substantiate potential producibility at a target cost level of $800/kW factory manufacturing cost. Phase 2 will further develop the design and reduce the manufacturing cost to a level of $600 kW. Depending on an assessment of the maturity of the technology at the end of Phase 1, Phase 2 may be structured and supplemented to provide a limited production capability. Finally, in Phase 3, a full Value Package Introduction (VPI) Program will be integrated into the SECA program to develop a mass-producible design at a factory cost of $400/kW with full cross-functional support for unrestricted commercial sales. The path to market for new technology products in the Cummins system involves two processes. The first is called Product Preceding Technology, or PPT. The PPT process provides a methodology for exploring potentially attractive technologies and developing them to the point that they can be reliably scheduled into a new product development program with a manageable risk to the product introduction schedule or product quality. Once a technology has passed the PPT gate, it is available to be incorporated into a Value Package Introduction (VPI) Program. VPI is the process that coordinates the cross-functional development of a fully supported product. The VPI Program is designed to synchronize efforts in engineering, supply, manufacturing, marketing, finance, and product support areas in such a way that the product, when introduced to the market, represents the maximum value to the customer.
Date: August 1, 2003
Creator: Norrick, Dan; Palmer, Brad; Romine, Todd; Vesely, Charles; Barringer, Eric; DeBellis, Cris et al.
Partner: UNT Libraries Government Documents Department
open access

10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual

Description: Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repair description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)
Date: August 1, 1979
Partner: UNT Libraries Government Documents Department
open access

10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning

Description: The various considerations related to the Phase II schedules, material control and personnel training required to effectively implement the program are presented. The flow charts and schedules required to accomplish fabrication, installation, checkout, and personnel training to support the Pilot Plant schedule are identified. The planning addresses receiving, storage and shipment of raw materials, subassemblies, component, subsystems, and complete assemblies. The vendor activities and the major Martin Marietta facilities are included. These are the Mirror Assembly activities at Pueblo, Colorado and the heliostat assembly and installation activities at the Barstow-Daggett Airport and the solar plant. (LEW)
Date: August 1, 1979
Partner: UNT Libraries Government Documents Department
open access

The 12-GeV/c beam transfer and absorber lines for the Superconducting Super Collider

Description: The beam optics of the 12-GeV/c proton beam transfer line between the Low Energy Booster (LEB) and the Medium Energy Booster (MEB) at the Superconducting Super Collider is presented. The beam is extracted from the LEB vertically and is injected into the MEB through a vertical Lambertson magnet and a horizontal kicker. The beamline has high flexibility for amplitude and dispersion function matching. Effects of various errors in the transfer line are studied, and a beam position correction scheme is proposed. The beam optics of the 12-GeV/c absorber line transporting the beam from the LEB to an absorber during the LEB commissioning is also presented.
Date: August 1, 1994
Creator: Mao, N.; McGill, J.; Gerig, R. & Brown, K.
Partner: UNT Libraries Government Documents Department
open access

13-Watt Curium-Fueled Thermoelectric Generator for Hard Lunar Impact Mission. Final Report-Subtask 5.8

Description: Results of a conceptual design study for a curium powered thermoelectric generator of minimum size and weight which is capable of sustaining hard impact is presented. The generator produces a minimum of 13 watts of d-c power at 3 volts, and weighs 6.2 pounds excluding shielding. (J.R.D.)
Date: August 1, 1960
Creator: Bloom, J. L.
Partner: UNT Libraries Government Documents Department
open access

24-CHANNEL GEOPHONE ARRAY FOR HORIZONTAL OR VERTICAL BOREHOLES

Description: This report describes the technical progress on a project to design and construct a multi-channel geophone array that improves tomographic imaging capabilities in both surface and underground mines. Especially important in the design of the array is sensor placement. One issue related to sensor placement is addressed in this report: the method for clamping the sensor once it is emplaced in the borehole. If the sensors (geophones) are not adequately coupled to the surrounding rock mass, the resulting data will be of very poor quality. Improved imaging capabilities will produce energy, environmental, and economic benefits by increasing exploration accuracy and reducing operating costs.
Date: August 1, 2002
Creator: Westman, Erik C.
Partner: UNT Libraries Government Documents Department
open access

24-CHANNEL GEOPHONE ARRAY FOR HORIZONTAL OR VERTICAL BOREHOLES

Description: This report describes the technical progress on a project to design and construct a multi-channel geophone array that improves tomographic imaging capabilities in both surface and underground mines. Especially important in the design of the array is sensor placement. One issue related to sensor placement is addressed in this report: the method for clamping the sensor once it is emplaced in the borehole. If the sensors (geophones) are not adequately coupled to the surrounding rock mass, the resulting data will be of very poor quality. Improved imaging capabilities will produce energy, environmental, and economic benefits by increasing exploration accuracy and reducing operating costs.
Date: August 1, 2002
Creator: Westman, Erik C.
Partner: UNT Libraries Government Documents Department
open access

24 M Meteorological Tower Data Report Period: January--December, 1994

Description: This report was prepared by the Desert Research Institute (DRI) for the U.S. Department of Energy (DOE). It summarizes meteorological data collected at the 24 meter tower at the Nevada Test Site Hazardous Material Spill Center (HAZMAT) located at Frenchman Flat near Mercury, Nevada, approximately 75 miles northwest of Las Vegas, Nevada. The tower was originally installed in July, 1993 to characterize baseline conditions for an EPA sponsored experimental research program at the HAZMAT.
Date: August 1, 1997
Creator: Freeman, D.; Bowen, J. & Egami, R.
Partner: UNT Libraries Government Documents Department
open access

25. anniversary of the 1973 oil embargo: Energy trends since the first major U.S. energy crisis

Description: The purpose of this publication is not to assess the causes of the 1973 energy crisis or the measures that were adopted to resolve it. The intent is to present some data on which such analyses can be based. Many of the trends presented here fall into two distinct periods. From 1973 to the mid-1980`s, prices continued at very high levels, in part because of a second oil shock in 1979--80. During this period, rapid progress was made in raising American oil production, reducing dependence on oil imports, and improving end-use efficiency. After the oil price collapse of the mid-1980`s, however, prices retreated to more moderate levels, the pace of efficiency gains slowed, American oil production fell, and the share of imports rose. 30 figs.
Date: August 1, 1998
Partner: UNT Libraries Government Documents Department
open access

AN 80 MEGAWATT AQUEOUS HOMOGENEOUS BURNER REACTOR. Reactor Design and Feasibility Problem

Description: An 80 Mw aqueous homogeneous burner reactor suitable for producing 20 Mw of electricity at a remote location is described. The reactor fuel consists of a light water uranyl sulfate solution which acts as its own moderator and coolant. The uranium is highly enriched (93% U/sup 235/). The primary considerstions for the design were simplicity and reliability of the components, automatic demand control and safe for any load change, full xenon override not required, possibility of construction within the immediate future, and economic operation not the cortrolling factor. Reasonably complete studies are presented for the reactor physics, safety, stability, chemistry, hent transfer, and operation of the system. (auth)
Date: August 1, 1957
Creator: Chapman, R.H.; Collins, H.L.; Dollard, W.J.; Fieno, D.; Hernandez- Fragoso, J.; Miller, J.W. et al.
Partner: UNT Libraries Government Documents Department
open access

94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

Description: This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997.
Date: August 1, 1997
Creator: Rink, N.A.
Partner: UNT Libraries Government Documents Department
open access

100 Area Excavation Treatability Test Plan. Revision 1

Description: This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992f). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications. The most recent applications are excavation of the 618-9 burial ground and partial remediation of the 316-5 process trenches (DOE-RL 1992a, 1992b). Both projects included excavation of soil and dust control (using water sprays). Excavation is a well-developed technology and equipment is readily available; however, certain aspects of the excavation process require testing before use in full-scale operations. These include the following: Measurement and control of excavation-generated dust and airborne contamination; verification of field analytical system capabilities; demonstration of soil removal techniques specific to the 100 Area waste site types and configurations. The execution of this treatability test may produce up to 500 yd{sub 3} of contaminated soil, which will be used for future treatability tests. These tests may include soil washing with vitrification of the soil washing residuals. Other tests will be conducted if soil washing is not a viable alternative.
Date: August 1, 1993
Partner: UNT Libraries Government Documents Department
open access

100 Hour Test of the Pressurized Woodchip-Fired Gravel Bed Combustor

Description: Combustion of wood chips in a packed bed combustor for a gas turbine cogeneration system is described. A discussion on flue gas emissions and mass balances is included.
Date: August 1, 1994
Creator: Ragland, Kenneth W. & Aerts, Danny J.
Partner: UNT Libraries Government Documents Department
open access

100-N Area underground storage tank closures

Description: This report describes the removal/characterization actions concerning underground storage tanks (UST) at the 100-N Area. Included are 105-N-LFT, 182-N-1-DT, 182-N-2-DT, 182-N-3-DT, 100-N-SS-27, and 100-N-SS-28. The text of this report gives a summary of remedial activities. In addition, correspondence relating to UST closures can be found in Appendix B. Appendix C contains copies of Unusual Occurrence Reports, and validated sampling data results comprise Appendix D.
Date: August 1, 1993
Creator: Rowley, C. A.
Partner: UNT Libraries Government Documents Department
open access

118-B-1 excavation treatability test procedures

Description: This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel.
Date: August 1, 1994
Creator: Frain, J. M.
Partner: UNT Libraries Government Documents Department
open access

200 Sand Steamflood Demonstration Project. Sixth annual report, June 1981-June 1982

Description: This demonstration project was initiated in the 200 Sand Pool in the Midway-Sunset Field, California Sand Pool to demonstrate the operational, recovery, and economic aspects of steamflooding a typical heavy oil reservoir which had unfavorable response to cyclic stimulation. The scope of the project involves 5 phases: (1) pilot site monitoring and evaluation; (2) pilot area expansion; (3) site selection for expansion to full-scale project; (4) expansion to full-scale steamflood; and (5) production monitoring. After expansion and steam injection for one year, the wells are averaging 8 B/D oil and 29 B/D water per well. This rate is above the 5 BOPD for cyclic stimulation. Most of the producing wells are steam stimulated about twice a year to enhance steam breakthrough from the continuous steam. The total area has averaged 319 B/D oil and 1233 B/D water the last year. 7 figures, 1 table.
Date: August 1, 1983
Creator: Alford, W.O.
Partner: UNT Libraries Government Documents Department
open access

300,000-KWE SGR Nuclear Power Plant of Current Technology

Description: Abstract: This report describes a 300,000-kwe, sodium-cooled, graphite-moderated nuclear power plant based on existing technical information.
Date: August 1, 1960
Creator: Renard, J.; Peckinpaugh, C. L. & Aronstein, R. E.
Partner: UNT Libraries Government Documents Department
open access

340 waste handling facility deactivation plan

Description: This document provides an overview of both the present status of the 340 Complex (within Hanford`s 300 Area), and of tasks associated with the deactivation of those segments dealing with radioactive, mixed liquid waste receipt, storage, and shipping.The plan also outlines actions needed to de-couple portions of the 340 Complex that will remain in service, including a replacement facility for required functions now fulfilled by systems proposed for deactivation. Task descriptions are presented, along with a detailed schedule for fiscal years 1997 through 2001, a companion preliminary budget (focused more on the near term), and a list of key assumptions.
Date: August 1, 1996
Creator: Stordeur, R.T. & Berneski, L.D., Westinghouse Hanford
Partner: UNT Libraries Government Documents Department
Back to Top of Screen