Hazards Evaluation of the SM-1 Penetrated Gasket
Description:
Abstract: This technical report describes the as-constructed SM-1 penetrated gasket designed for SM-1 Core and Flow Instrumentation (Task XIV). This report supplements APAE No. 79, The Summary Hazards Report for Task XIV, and evaluates the effects of a postulated failure of this gasket. The effects of failure on the Maximum Credible Accident are determined and conclusions and recommendations for the use of this gasket are made.
Date:
September 8, 1961
Creator:
Coombe, J. R.; Gebhardt, F. G. & James, B.
Partner:
UNT Libraries Government Documents Department