Search Results

Primary view of 3-D woven, mullite matrix, composite filter
Lane, J. E.; Painter, C. J.; Radford, K. C. & LeCostaouec, J. F.
December 1, 1995
Primary view of 105 K east ion exchange and cartridge filter restart computer software configuration management plan
Schermerhorn, D.S.
December 1, 1995
Primary view of 305 Building 2 ton bridge crane and monorail assembly analysis
Axup, M. D.
December 1, 1995
Primary view of 324 Building REC and HLV Tank Closure Plan
Becker-Khaleel, B & Schlick, K.
December 1, 1995
Primary view of 1994 Fernald field characterization demonstration program data report
Rautman, C. A.; Cromer, M. V.; Newman, G. C. & Beiso, D. A.
December 1, 1995
Primary view of 1995 Federal Research and Development Program in Materials Science and Technology
unknown creator
December 1, 1995
Primary view of 1995 Pacific Northwest Loads and Resources Study.
United States. Bonneville Power Administration.
December 1, 1995
Primary view of 1995 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 1.
United States. Bonneville Power Administration.
December 1995
Primary view of Acceptable standard format and content for the fundamental nuclear material control (FNMC) plan required for low-enriched uranium facilities. Revision 2
Joy, D. R.
December 1995
Primary view of Acceptance test procedure for Project W-430, SY-tank farm cathodic protection upgrade, Rectifier {number_sign}36
Neely, J. A.
December 1, 1995
Primary view of Accounting for uncertainty in systematic bias in exposure estimates used in relative risk regression
Gilbert, E. S.
December 1, 1995
Primary view of Activities of the INEL Sample Management Office: Resulting in efficiency at the INEL
Watkins, C. S. & Hoiland, S. A.
December 1, 1995
Primary view of Addendum 4 to CSAR 81-001, Installation of an Official Critical Drain on the Plexiglass Contamination Barrier in HC-227T Hood
Chiao, T.
December 1, 1995
Primary view of Advance concepts for conversion of syngas to liquids. Quarterly report No. 3, April 29, 1995--July 28, 1995
Szostak, R.; Abotsi, G. & Mitchell, M.
December 1, 1995
Primary view of Advanced drilling systems
Pierce, K. G.; Finger, J. T. & Livesay, B. J.
December 1995
Primary view of Advanced fuel gas desulfurization (AFGD) demonstration project. Technical progress report No. 19, July 1, 1994--September 30, 1994
unknown creator
December 1, 1995
Primary view of Advanced integrated safeguards using front-end-triggering devices
Howell, J. A. & Whitty, W. J.
December 1, 1995
Primary view of Advanced manufacturing: Technology diffusion
Tesar, A.
December 1, 1995
Primary view of Advanced power assessment for Czech lignite task 3.6. Topical report
Sondreal, E. A.; Mann, M. D.; Weber, G. W. & Young, B. C.
December 1995
Primary view of Advanced power assessment for Czech lignite. Task 3.6, Volume 1
Sondreal, E. A.; Mann, M. D.; Weber, G. W. & Young, B. C.
December 1, 1995
Primary view of Advanced Turbine Systems (ATS) program conceptual design and product development. Quarterly report, December 1, 1994--February 28, 1995
unknown creator
December 1995
Primary view of Advanced turbine systems-research and development thermal barrier coatings technology: 1st bimonthly report, December 1995
unknown creator
December 1, 1995
Primary view of Alabama DOE/EPSCoR traineeship program. Final report, September 28, 1991--September 28, 1995
Pruitt, K.M. & April, G.C.
December 1, 1995
Primary view of Alzeta porous radiant burner. CRADA final report
unknown creator
December 1, 1995
Back to Top of Screen