Final report on Production Test No. 105-1-MR -- Poison column control during reactor operation
Description:
The lack of control rod capacity in the reactors with nine rods is causing significant production losses. The present control system, which functioned satisfactorily at a 300 MW equilibrium power level, is unable to counteract the larger startup reactivity transient effects at the current high power levels. This lack of strength causes the power level to be restricted during startup. The control system is also not flexible enough to prevent outages for the discharge of temporary poison. (1) A m…
more
Date:
July 24, 1952
Creator:
Schilling, R. D. & Hess, K. W.
Partner: