Explore Results

open access

Proposed R.F. Buncher for A-12

Description: A buncher and pre-accelerator for A-12 is described that has 360 degree acceptance and could handle a current of one ampere from a low voltage source.
Date: June 25, 1952
Creator: Colgate, S. A.
Partner: UNT Libraries Government Documents Department
open access

The Spectrophotometric Determination of Boron in Plutonium Using an Oxalate Separation

Description: An improved method for the determination of boron in plutonium is reported. Precipitation of plutonium (III) acid oxalate prior to color development with curcumin results in increased precision, greater speed, and lower costs. Results are presented of a statistical study involving all variables.
Date: June 25, 1953
Creator: Newell, Donald M.
Partner: UNT Libraries Government Documents Department
open access

Spectrographic Analysis of Plutonium by the Thenoyltrifloroacetone Extraction Method

Description: Impurities are separated from plutonium solutions by means of TTA (thenoyltrifluoracetone) extractions. Plutonium in hydrochloric acid solution is reduced to the trivalent state with hydroxylamine, and some impurities are extracted into hezone or a solution of TTA in hezone. The organic phase is removed, and the plutonium in the aqueous phase is oxidized to the tetravalent state with nitric acid. Investigations of several variables which affect the extraction are described..
Date: June 29, 1953
Creator: Van Tuyl, H. H.
Partner: UNT Libraries Government Documents Department
open access

Removal of Graphite from Aluminum Surfaces

Description: The first of two general methods are discussed based on the removal of the thin layer of aluminum to which graphite adheres. Two electro-polishing techniques, an electrolytic etch, an anodization-deanodication cycle and two chemical etches are described.
Date: June 30, 1953
Creator: Dillon, R. L. & Hodgson, W. H.
Partner: UNT Libraries Government Documents Department
open access

Semi Works Studies for the Reduction of Corrosion-Product Impurities in UR-Plant UO3

Description: This report describes the work carried out in 321 Building semiworks equipment, to define the factors contributing to high corrosion-product contamination and presents recommendations for reducing the impurity level to meet current specifications (maximum of 200 parts total metals per million parts U).
Date: June 14, 1960
Creator: Amos, L. C.; Kirkendall, B. E. & Adler, K. L.
Partner: UNT Libraries Government Documents Department
open access

Mid-Year Summary Report October 1, 1960-March 31, 1961 Army Pwr Support and Development Program

Description: Abstract: A cyclic stress analysis of the SM-1 primary system was carried out. Problems encountered in the fabrication of PM-2A Core II and SM-lA Core II are described, and the results of an examination of damaged SM-lA Core I stationary fuel elements reported. A preliminary study of the radiation damage to SM-1 reactor vessel was made and the possibility of annealing the vessel discussed. Performance analyses are presented for five cores: SM-1 Core, SM-1 Core 1 rearranged and spiked, SM-1 Core… more
Date: June 2, 1961
Creator: Hoover, H. L.
Partner: UNT Libraries Government Documents Department
open access

Investigation of Local Boiling of SM-1

Description: Abstract; SM-1 Reactor Core I Rearranged and Spiked, and Core II with Special Components were analyzed under various off-design conditions to induce nucleate boiling. The steady state code, STDY-3, written for the thermal analysis of pressurized water cores, was employed for the analysis. The code performs a complete steady state parallel channel thermal analysis for both nominal and hot channels. Thermal characteristics of individual elements were investigated while changing the parameters of… more
Date: June 20, 1961
Creator: Bradley, P. L.
Partner: UNT Libraries Government Documents Department
open access

Extended SM-2 Critical Experiments : CE-2

Description: Abstract: This technical report contains a description and results of a second series of critical experiments performed on the SM-2 core mock-up, as additional to the first series of experiments reported in APAE No. 54. The SM-2 core mock-up contains 36.4 kg U-235 and and estimated 67.9 gm B-10. The equivalent diameter and the active height are about 22 in.; the metal-to-water volume ration is 0.344. Data is presented on activation, reactivity, and stuck rod measurements. All measurements were … more
Date: June 30, 1961
Creator: McCool, W. J.; Robinson, R. A.; Weiss, S. H.; Raby, T. M.; Schrader, E. W. & Walthousen, L. D.
Partner: UNT Libraries Government Documents Department
open access

Silver - Cadmium - Indium Absorber Development

Description: Abstract: This technical report covers development of an AG-Cd-In alternate absorber section for Army Type SM reactors. It describes the absorber material composition and the geometric configuration. It gives the nuclear and thermal analyses supporting this configuration and a detailed description of the manufacturing practice employed in fabricating the final design component.
Date: June 13, 1962
Creator: Shaw, R. A. & Harris, R. L.
Partner: UNT Libraries Government Documents Department
open access

SM-1 Shielding Analyses

Description: Abstract: This technical report analyzes gamma dose rate and neutron measurements in their relation to the SM-1 shield design and is a continuation of previous shielding measurements and analyses reported in APAE-35 and APAE-35 Supplement 2. The data reported herein are spent fuel element and rod drive pit gamma dose rates. An analysis of gamma dose rates off the core midplane is presented and compared with test data.
Date: June 20, 1962
Creator: Stephenson, L. D.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for PM-2A Core II

Description: Abstract: This technical report describes the changes incurred in the PM-2A by the planned insertion of PM-2A Core II and the replacement of the startup and check sources. PM-2A Core II components were fabricated to specifications very nearly identical to those of PM-2A Core I. The essential difference in the cores is the boron loading which permits PM-2A Core II to meet a "one-stuck rod criteria" at beginning of life. This core has been subjected to a zero power experiment and loading procedur… more
Date: June 21, 1962
Creator: Coombe, John R. & Stephenson, L. D.
Partner: UNT Libraries Government Documents Department
open access

Thermal Analysis of SM-1 Core III

Description: Abstract This technical report covers the thermal analysis performed on the SM-1 Core III for both steady state and transient conditions is reported. SM-1 Core III will be used as a test for Type 3 elements in a PM-2A Core. The steady state analysis indicated minimum departure from nucleate boiling ratios (DNBR) for both design and scram conditions above the minimum criteria of 1.5. Local nucleate boiling was noted in the hot internal channels and lattice passage at scram power conditions. Loss… more
Date: June 29, 1962
Creator: Davidson, S. L.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen