UNT Libraries Government Documents Department - Browse

ABOUT BROWSE FEED

20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission

Description: Introduction: In September of 156, Gilbert Associates, Inc., entered into a contract with the United States of America, acting through the United States Atomic Energy Commission, for the study and preliminary design of a nuclear power plant being considered for integration into a central station power system at an overseas site.
Date: July 7, 1957
Creator: Gilbert Associates, Inc.
Item Type: Report

Accidental Radiation Excursion at the Y-12 Plant, June 16, 1958: Final Report

Description: This report describes the circumstances leading to the accident, attempts to reconstruct the nuclear reactivity conditions, and reviews the dosimetric means and results which were used to help determine the exposure of affected employees.
Date: September 12, 1958
Creator: Patton, F. S.; Bailey, J. C.; Callihan, A. D.; Googin, J. M.; Jasny, G. R.; McAlduff, H. J. et al.
Item Type: Report

AEC Hot Cells and Related Facilities

Description: Foreward: The primary purpose of this report is to present as an accumulation of basic information on the hot cells constructed to date by the United States Atomic Energy Commission.
Date: May 1958
Creator: Fosdick, Ellery R.
Item Type: Report

Airborne Reconnaissance in Southwestern Arkansas

Description: Introduction: Reconnaissance for uranium in central and southwestern Arkansas was carried out as a joint project of the U.S. Atomic energy Commission and the U.S. Geological Survey during March and May 1954. The project was planned as an investigation of several areas of known abnormal radioactivity, and as a search for others, by airborne and ground radiometric reconnaissance.
Date: December 13, 1954
Creator: Malan, R. C. & Nash, A. L.
Item Type: Report

Airborne Reconnaissance Project, Green River Basin, Wyoming

Description: Abstract: A part of the Green River Basin airborne reconnaissance project, re: memo to Phillip L. Merritt, March 12, 1954, Proposed Airborne Reconnaissance Project, Green River Basin, Wyoming, was completed during the months from July though October 1954. No uranium mineralization of commercial value was found.
Date: January 1955
Creator: Magleby, Dan N. & Meehan, R. J.
Item Type: Report

Annual Progress Report, USAEC Study Agreement: 1954-1955

Description: Introduction: This report is intended to cover the activities of the Nuclear Power Section during the period from 30 September 1954 to 30 September 1955 under the terms of the USAEC Agreement.
Date: September 30, 1955
Creator: Bethlehem Steel Company. Nuclear Power Section.
Item Type: Report

Appendix to Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission Idaho Operations Office Contract No. AT(10-1)-925

Description: Report containing outlines of operating procedures, costs, construction, safety analysis, studies, and design specifications of a 30,000 kilowatt prototype partially enriched uranium nuclear power plant.
Date: March 1959
Creator: Kaiser Engineers
Item Type: Report

Appendix to Preliminary Design 55,000 KW Prototype Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office

Description: Report containing documentation of projects undertaken by the multiple branches of the Health and Safety Division of the Idaho Operations Office at the Nuclear Reactor Testing Station (NRTS).
Date: March 1958
Creator: U.S. Atomic Energy Commission. Idaho Operations Office.
Item Type: Report