This system will be undergoing maintenance April 18th between 9:00AM and 12:00PM CDT.

Search Results

Appendix A. Design and Test Conduct
Report summarizing the design of Power Burst Facility (PBF) test rods, test train hardware, the individual rod assembly instrumentation, and test conduct.
Appendix B. Pretest Fuel Rod Charactization Data
Report presenting the pretest fuel rod characterization data for four rods used in Test RIA 1-2.
Postimpoundment Survey of Water-Quality Characteristics of Raystown Lake, Huntingdon and Bedford Counties, Pennsylvania
This report presents the water-quality data of Raystown Lake, Pennsylvania, discussing its physical, biological, and chemical properties. This report also includes several tables and figures.
Back to Top of Screen