UNT Libraries Government Documents Department - 6 Matching Results

Search Results

Homogeneous Reactor Project Quarterly Progress Report: May-July 1957
Report issued by the Oak Ridge National Laboratory discussing quarterly progress made by the Homogeneous Reactor Program. Descriptions of progress and studies conducted are presented. This report includes tables, illustrations, and photographs.
Health Physics Division Annual Progress Report, July 31, 1958
Report documenting research and developments made by the Health Physics Division of the Oak Ridge National Laboratory.
Physics Division Annual Progress Report, March 10, 1959
Report containing reports from the Physics Division of the Oak Ridge National Laboratory that cover a wide variety of subjects.
A Solvent Extraction Method for Neptunium (237) Analysis
Technical report describing a rapid and quantitative radiochemical method for the analysis of neptunium (237). This method is based on the extraction of neptunium (IV) with thenoyl-trifluoracetone in xylene. Neptunium (237) is separated free from other alpha emitters and from non-radioactive interferences, and the method may be readily adapted to remote control. [From Abstract]
Chemistry Division Quarterly Progress Report for Period Ending March 31, 1951
Quarterly technical report including reports on chemistry of source, fissionable, and structural elements, nuclear chemistry, radio-organic chemistry, chemistry of separations processes, chemical physics, radiation chemistry, and instrumentation. [From Abstract]
Homogeneous Reactor Project Quarterly Progress Report [for] Period Ending May 15, 1951
Technical report outlining the reconstitution of the Homogeneous Reactor Experiment Project (HRE) as the Homogeneous Reactor Project. Report covers the need for a broader developmental program to establish the feasibility of obtaining the potential advantages of homogeneous reactors for the production of fissionable materials and power. Details the ultimate objective of the ORNL program to provide the technical information required to determine the feasibility of a full scale plutonium power producing homogeneous reactor. [From Summary]