UNT Libraries Government Documents Department - 8,426 Matching Results

Search Results

open access

1. 5 GeV/c multiturn shaving extraction and its transport line for the Brookhaven AGS

Description: A system for fast shaving extraction at 1.5 GeV/c is implemented to extract the circulating beam in five turns. A numerical simulation is first carried out to determine the emittance and the rf structure of the extracted beam. This is followed by several machine study sessions which establish the optimal extraction configuration, confirm the emittance, and modify the transport line for low energy beam. Finally, a one-week run for the Neutrino Oscillation experiment demonstrates that the system … more
Date: January 1, 1979
Creator: Weng, W. T.; Blumberg, L. N.; Gill, E.; Soukas, A.; Witkover, R. L.; Egleman, E. et al.
open access

1.5 megawatt dc chopper power supplies for plasma shape control on Doublet III

Description: The Doublet III device is designed to study noncircular plasmas, including doublet and dee-shaped cross-sections. The plasma shape is determined by a system of 24 field-shaping coils which surround the vacuum vessel. Control of the magnetic flux linking these coils allows the plasma shape to be varied and controlled. This paper describes the high-speed dc chopper which is a major component of the field-shaping coil power system. The high-speed dc choppers, with a frequency response of up to 5 k… more
Date: November 1979
Creator: Rock, P. J. & Wesley, J. C.
open access

1-GWh diurnal load-leveling Superconducting Magnetic Energy Storage system reference design

Description: A point reference design has been completed for a 1-GWh Superconducting Magnetic Energy Storage system. The system is for electric utility diurnal load-leveling but can also function to meet much faster power demands including dynamic stabilization. This study explores several concepts of design not previously considered in the same detail as treated here. Because the study is for a point design, optimization in all respects is not complete. This report examines aspects of the coil, the superco… more
Date: September 1, 1979
Creator: Rogers, J. D.; Hassenzahl, W. V. & Schermer, R. I. (comps.)
open access

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix A: energy storage coil and superconductor

Description: The technical aspects of a 1-GWh Superconducting Magnetic Energy Storage (SMES) coil for use as a diurnal load-leveling device in an electric utility system are presented. The superconductor for the coil is analyzed, and costs for the entire coil are developed.
Date: September 1, 1979
Creator: Schermer, R.I.
open access

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix B: cost study, high-purity aluminum production

Description: Cost information is supplied for aluminum with purities of 200, 2000, and 5000 residual resistivity ratio. Two production situations were used for each purity: (1) 1 x 10/sup 6/ kg/yr production rate with a 30-yr sustaining market and (2) 1 x 10/sup 6/ kg/yr production rate for 2 yrs only. These productions and purities are of interest for manufacturing devices for Superconducting Magnetic Energy Storage. The cost study results are presented as a range and include (1) the selling price of the a… more
Date: September 1, 1979
Creator: Cochran, C. N.; Dawless, R. K. & Whitchurch, J. B.
open access

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix C: dewar and structural support

Description: The mechanical aspects of the dewar to contain a 1-GWh superconducting coil in a 1.8 K helium bath and the means for supporting the coil and dewar against the rock of an underground excavation created for just that purpose are presented.
Date: September 1, 1979
Creator: Bennett, J. G. & Ju, F. D.
open access

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix D: superconductive magnetic energy storage cavern construction methods and costs

Description: The excavation and preparation of an underground cavern to contain a 1-GWh diurnal load-leveling Superconducting Magnetic Energy Storage (SMES) unit is examined. The cavern's principal function is to provide a rock structure for supporting the magnetic forces from the charged storage coil. Certain economic considerations indicate the refrigerator cold box for the helium system should also be underground. The study includes such a provision and considers, among other things, rock bolting, water … more
Date: September 1, 1979
open access

S-1 project. Volume I. Architecture. 1979 annual report

Description: The US Navy is one of the world's largest users of digital computing equipment having a procurement cost of at least $50,000, and is the single largest such computer customer in the Department of Defense. Its projected acquisition plan for embedded computer systems during the first half of the 80s contemplates the installation of over 10,000 such systems at an estimated cost of several billions of dollars. This expenditure, though large, is dwarfed by the 85 billion dollars which DOD is project… more
Date: January 1, 1979
open access

S-1 project. Volume II. Hardware. 1979 annual report

Description: This volume includes highlights of the design of the Mark IIA uniprocessor (SMI-2), and the SCALD II user's manual. SCALD (structured computer-aided logic design system) cuts the cost and time required to design logic by letting the logic designer express ideas as naturally as possible, and by eliminating as many errors as possible - through consistency checking, simulation, and timing verification - before the hardware is built. (GHT)
Date: January 1, 1979
open access

1 to 12 GeV/c beam transport for transverse or longitudinally polarized protons

Description: A two-stage beam transport for polarized protons has been constructed and operated at the Argonne ZGS. The first stage delivers vertically polarized protons (N-type) to an elastic scattering polarimeter consisting of a 10 cm long LH/sub 2/ target and two moveable sets of forward and recoil scintillation counters. The unscattered protons transported through the beam's second stage are focused onto the polarized proton target PPT-III; this target utilizes a 2.5 T R and A magnet to produce target … more
Date: January 1, 1979
Creator: Colton, E. P.
open access

2 meg-ampere prototype levitated coil for multipole fusion

Description: The coils major diameter is 1.0 meter and it occupies a cross-section which is about 0.2 meter minor in diameter. The prototype coil will carry four times the current of the largest such magnet built to date. As a result, the peak induction in the coil is about 8 T and the stored magnetic energy will be around 3 MJ. The paper describes the proposed Nb/sub 3/SN superconductor, the quench protection system which is based on the LBL shorted secondary concept, the isochroic refrigeration storage sy… more
Date: November 1, 1979
Creator: Green, M. A. & Glueck, R.
open access

10. 6. mu. m damage threshold measurements on sub-one-hundred-ps pyroelectric detectors

Description: Sub-one-hundred-ps response time pyroelectric detectors are being developed at Los Alamos Scientific Laboratory (LASL) to be compatible with the 5-GHz oscilloscope direst-access mode of operation without damage. Strontium barium niobate, lithium tantalate, lanthanum-doped lead zirconate, and lithium niobate are being evaluated for use in the edge and coplanar configurations. Devices designed at LASL are compared with commercially available detectors. Test results of a less than 15-ps risetime, … more
Date: January 1, 1979
Creator: Stotlar, S. C.; McLellan, E. J.; Gibbs, A. J. & Webb, J.
open access

10-MWe solar-thermal central-receiver pilot plant: collector subsystem foundation construction. Revision No. 1

Description: Bid documents are provided for the construction of the collector subsystem foundation of the Barstow Solar Pilot Plant, including invitation to bid, bid form, representations and certifications, construction contract, and labor standards provisions of the Davis-Bacon Act. Instructions to bidders, general provisions and general conditions are included. Technical specifications are provided for the construction. (LEW)
Date: December 18, 1979
open access

10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual

Description: Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparab… more
Date: August 1, 1979
open access

10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning

Description: The various considerations related to the Phase II schedules, material control and personnel training required to effectively implement the program are presented. The flow charts and schedules required to accomplish fabrication, installation, checkout, and personnel training to support the Pilot Plant schedule are identified. The planning addresses receiving, storage and shipment of raw materials, subassemblies, component, subsystems, and complete assemblies. The vendor activities and the major… more
Date: August 1, 1979
open access

12. 5 MHz heavy ion linac for ion beam fusion

Description: Argonne National Laboratory (ANL) is currently developing the injector of a heavy ion beam driver for the inertial confinement fusion program. The first phase of the program is to accelerate about 20 mA of Xe/sup +1/ from a 1.5 MV preaccelerator 11.4 MeV in a low-beta RF linac. The first section of the linac utilizes a single harmonic buncher and independently-phased short linac resonators with a FODO magnetic quadrupole focusing lattice. These are followed by two double-stub Wideroee linacs. A… more
Date: 1979
Creator: Moretti, A.; Watson, J. M.; Moenich, J. S.; Foss, M. H.; Khoe, T. K.; Colton, E. P. et al.
open access

24-MW neutral-beam injector of 400-keV H/sup 0/

Description: The negative and positive ion systems have both common goals and common problems. In fact, we have identified five items that must be developed before any large, neutral-beam injector, operating continuously or almost so, can be engineered. The five items are: (1) a continuous or almost continuous ion source, with 1A designating a source of positive ions and 1B a direct extraction source of negatives, (2) a recirculating metal-vapor cell, (3) a computer code with which to calculate beam traject… more
Date: November 1, 1979
Creator: Fink, J.H.; Hamilton, G.W. & Erickson, J.L.
open access

30. mu. A beam toroid

Description: A standard commercial toroid modified to operate in the zero flux mode has been applied to the monitoring of the 750 keV polarized proton beam at the Zero Gradient Synchrotron (ZGS). The beam parameters are: rise time - 3 ms, pulse width - 15 ms, current - 30 ..mu..A. This beam produces a free space flux of H = 8.2 x 10/sup -7/ oersted at the toroidal core radius. The device has a threshold of 10 ..mu..A as determined by system noise and operates with a bandpass of 10 Hz to 2.5 kHz. Ambient ele… more
Date: January 1, 1979
Creator: Sanders, R.A. & Konecny, R.S.
open access

33-GVA interrupter test facility

Description: The use of commercial ac circuit breakers for dc switching operations requires that they be evaluated to determine their dc limitations. Two 2.4-GVA facilities have been constructed and used for this purpose at LASL during the last several years. In response to the increased demand on switching technology, a 33-GVA facility has been constructed. Novel features incorporated into this facility include (1) separate capacitive and cryogenic inductive energy storage systems, (2) fiber-optic controls… more
Date: January 1, 1979
Creator: Parsons, W. M.; Honig, E. M. & Warren, R. W.
open access

42-inch diameter producer stream gas clean-up system mathematical model

Description: The purpose of this work is to develop a computer simulation program that will expedite the development and aid in the optimization and scale-up of the Morgantown Energy Technology Center (METC) low-Btu coal gasifier system. The gasifier system includes the METC low-Btu fixed-bed gasifier and the producer gas clean-up system. The producer Gas Clean-Up System Simulation Program, the subject of this report, develops the mathematical models and computational procedures for the material balance cal… more
Date: March 1, 1979
open access

50,000 mile methanol/gasoline blend fleet study: a progress report

Description: Seven current production automobiles are being used in a fleet study to obtain operational experience in using 10% methanol/90% gasoline blends as an automotive fuel. Data from chassis dynamometer tests (run according to the 1975--1978 Federal test procedure) have been obtained, showing fuel economy and exhaust emissions of carbon monoxide, oxides of nitrogen, unburned fuel, methanol, and aldehydes. These data are shown for each of the vehicles when operated on the 10% methanol blend, and on un… more
Date: January 1, 1979
Creator: Stamper, K. R.
open access

50 kW on-site concentrating solar photovoltaic power system. Phase I: design. Final report, 1 June 1978-28 February 1979

Description: This contract is part of a three phase program to design, fabricate, and operate a solar photovoltaic electric power system with concentrating optics. The system will be located beside a Local Operating Headquarters of the Georgia Power Company in Atlanta, Georgia and will provide part of the power for the on-site load. Fresnel lens concentrators will be used in 2-axis tracking arrays to focus solar energy onto silicon solar cells producing a peak power output of 56 kW. The present contract cov… more
Date: March 30, 1979
Creator: Pittman, P. F.
Back to Top of Screen