UNT Libraries Government Documents Department - 13 Matching Results

Search Results

FY 2008 Miniature Spherical Retroreflectors – Final Report
Through the duration of the NNSA Office of Nuclear Nonproliferation Research and Development (NA-22) Miniature Spherical Retroreflectors lifecycle project, our research team focused on developing solutions to the fabrication bottleneck that has inhibited development and deployment of wide-angle optically interrogated chemical and radiological remote sensing technology. Our team advanced the concept of step-index clad retroreflectors to approximate an optimized, but yet unrealized spherical gradient index design. An intensive numerical simulation effort was undertaken that resulted in optimized step-index optical designs for mid-infrared applications. Geometric optics ray trace modeling was performed to better understand the geometrical dependencies of the miniature spherical retroreflector application. We adopted and advanced the concept of optical cross section, a metric that provides relative performance comparisons between different retroreflector designs and our cross-section analysis demonstrated that our step-index design provided 90% of the range capacity of the ideal spherical index design.
Intelligence Authorization Legislation: Status and Challenges
This report assesses the effects of the absence of intelligence authorization legislation since FY2005. Since FY2005, no annual intelligence authorization bill has been enacted. Although the National Security Act requires intelligence activities to be specifically authorized, this requirement has been satisfied in recent years by one-sentence catch-all provisions in defense appropriations acts authorizing intelligence activities.
Intelligence Authorization Legislation: Status and Challenges
This report assesses the effects of the absence of intelligence authorization legislation since FY2005. Since FY2005, no annual intelligence authorization bill has been enacted. Although the National Security Act requires intelligence activities to be specifically authorized, this requirement has been satisfied in recent years by one-sentence catch-all provisions in defense appropriations acts authorizing intelligence activities.
Hood River Production Program Monitoring and Evaluation (M&E) - Confederated Tribes of Warm Springs : Annual Report For Fiscal Year, October 2007 – September 2008.
This progress report describes work performed by the Confederated Tribes of Warm Springs (CTWSRO) portion of the Hood River Production Program Monitoring and Evaluation Project (HRPP) during the 2008 fiscal year. A total of 64,736 hatchery winter steelhead, 12,108 hatchery summer steelhead, and 68,426 hatchery spring Chinook salmon smolts were acclimated and released in the Hood River basin during the spring. The HRPP exceeded program goals for a release of and 50,000 winter steelhead but fell short of the steelhead release goals of 30,000 summer steelhead and 75,000 spring Chinook in 2008. Passive Integrated Transponders (PIT) tags were implanted in 6,652 hatchery winter steelhead, and 1,196 hatchery summer steelhead, to compare migratory attributes and survival rates of hatchery fish released into the Hood River. Water temperatures were recorded at six locations within the Hood River subbasin to monitor for compliance with Oregon Department of Environmental Quality water quality standards. A preseason spring Chinook salmon adult run forecast was generated, which predicted an abundant return adequate to meet escapement goal and brood stock needs. As a result the tribal and sport fisheries were opened. A tribal creel was conducted from May 22 to July 18 during which an estimated 172 spring Chinook were harvested. One hundred sixteen Spring Chinook salmon redds were observed and 72 carcasses were inspected on 19.4 miles of spawning grounds throughout the Hood River Basin during 2008. Annual salvage operations were completed in two irrigation canals resulting in the liberation of 1,641 fish back to the Hood River.
WASTE SOLIDIFICATION BUILDING BENCH SCALE HIGH ACTIVITY WASTE SIMULANT VARIABILITY STUDY FY2008
The primary objective of this task was to perform a variability study of the high activity waste (HAW) acidic feed to determine the impact of feed variability on the quality of the final grout and on the mixability of the salt solution into the dry powders. The HAW acidic feeds were processed through the neutralization/pH process, targeting a final pH of 12. These fluids were then blended with the dry materials to make the final waste forms. A secondary objective was to determine if elemental substitution for cost prohibitive or toxic elements in the simulant affects the mixing response, thus providing a more economical simulant for use in full scale tests. Though not an objective, the HAW simulant used in the full scale tests was also tested and compared to the results from this task. A statistically designed test matrix was developed based on the maximum molarity inputs used to make the acidic solutions. The maximum molarity inputs were: 7.39 HNO{sub 3}, 0.11618 gallium, 0.5423 silver, and 1.1032 'other' metals based on their NO{sub 3}{sup -} contribution. Substitution of the elements aluminum for gallium and copper for silver was also considered in this test matrix, resulting in a total of 40 tests. During the NaOH addition, the neutralization/pH adjustment process was controlled to a maximum temperature of 60 C. The neutralized/pH adjusted simulants were blended with Portland cement and zircon flour at a water to cement mass ratio of 0.30. The mass ratio of zircon flour to Portland cement was 1/12. The grout was made using a Hobart N-50 mixer running at low speed for two minutes to incorporate and properly wet the dry solids with liquid and at medium speed for five minutes for mixing. The resulting fresh grout was measured for three consecutive yield stress measurements. The cured ...
Earmarks Disclosed by Congress: FY2008 and FY2009 Regular Appropriations Bills
This report provides information on the earmarks disclosed by the House and Senate for the 12 regular, annual appropriations bills for each of FY2008 and FY2009. The report directly analyzes the data in the earmark disclosure lists, without additions or deletions.
Calibration of an interfacial force microscope for MEMS metrology : FY08-09 activities.
Progress in MEMS fabrication has enabled a wide variety of force and displacement sensing devices to be constructed. One device under intense development at Sandia is a passive shock switch, described elsewhere (Mitchell 2008). A goal of all MEMS devices, including the shock switch, is to achieve a high degree of reliability. This, in turn, requires systematic methods for validating device performance during each iteration of design. Once a design is finalized, suitable tools are needed to provide quality assurance for manufactured devices. To ensure device performance, measurements on these devices must be traceable to NIST standards. In addition, accurate metrology of MEMS components is needed to validate mechanical models that are used to design devices to accelerate development and meet emerging needs. Progress towards a NIST-traceable calibration method is described for a next-generation, 2D Interfacial Force Microscope (IFM) for applications in MEMS metrology and qualification. Discussed are the results of screening several suitable calibration methods and the known sources of uncertainty in each method.
FY08 Annual Report: Amorphous Semiconductors for Gamma Radiation Detection (ASGRAD)
This is the annual report for an old project funded by NA22. The purpose of the project was to develop amorphous semiconductors for use as radiation detectors. The annual report contains information about the progress made in synthesizing, characterizing, and radiation response testing of these new materials.
Recruiting and Retention: An Overview of FY2008 and FY2009 Results for Active and Reserve Component Enlisted Personnel
This report provides a brief overview of the recruiting and retention rates for Active and Reserve Component enlisted personnel during FY2008 and FY2009.
FY08 LDRD Final Report LOCAL: Locality-Optimizing Caching Algorithms and Layouts
This project investigated layout and compression techniques for large, unstructured simulation data to reduce bandwidth requirements and latency in simulation I/O and subsequent post-processing, e.g. data analysis and visualization. The main goal was to eliminate the data-transfer bottleneck - for example, from disk to memory and from central processing unit to graphics processing unit - through coherent data access and by trading underutilized compute power for effective bandwidth and storage. This was accomplished by (1) designing algorithms that both enforce and exploit compactness and locality in unstructured data, and (2) adapting offline computations to a novel stream processing framework that supports pipelining and low-latency sequential access to compressed data. This report summarizes the techniques developed and results achieved, and includes references to publications that elaborate on the technical details of these methods.
Design Study for a Low-Enriched Uranium Core for the High Flux Isotope Reactor, Annual Report for FY 2008
This report documents progress made during FY 2008 in studies of converting the High Flux Isotope Reactor (HFIR) from highly enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. Conversion from HEU to LEU will require a change in fuel form from uranium oxide to a uranium-molybdenum alloy. With axial and radial grading of the fuel foil and an increase in reactor power to 100 MW, calculations indicate that the HFIR can be operated with LEU fuel with no degradation in reactor performance from the current level. Results of selected benchmark studies imply that calculations of LEU performance are accurate. Scoping experiments with various manufacturing methods for forming the LEU alloy profile are presented.
Building Partnerships to Control Tuberculosis, Report to Congress: 2008
Report summarizing the USAID's efforts in preventing and controlling tuberculosis worldwide.
300 Area D4 Project Fiscal Year 2008 Building Completion Report
This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of eighteen buildings in the 300 Area of the Hanford Site that were demolished in Fiscal Year 2008. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate.