Introduction: The scope of work for the contract stated that General Atomic was to undertake a preliminary design study and related exploratory development program for a 1000-Mw(e), advanced, gas-cooled reactor.
From introduction: This report contains D2O spectral investigations, measurements of scattering angular distributions, BeO spectral measurements, studies of space dependent problems, theoretical studies, and preliminary studies of fast neutron shielding.
The present study was undertaken for the purpose of determining the feasibility, establishing the required development program, and estimating the cost of a turbocirculator to provide the pumping power for a 1000-Mw(e) high-temperature gas-cooled reactor power plant as part of the TARGET program. This necessitated preliminary design of the turbocirculator in conjunction with the reactor power plant as well as the investigation of methods for the optimization of the turbocirculator and for its development. This study was carried out in sufficient detail to fix the methods required to resolve the problems that would be encountered during the course of a prototype program resulting in a turbocirculator for the TARGET power plant.
This dialog allows you to filter your current search.
Each of the Serial/Series Titles listed note their name and the number of records that will be limited down to if you choose that option.
This dialog allows you to filter your current search.
Each of the Months listed note their name and the number of records that will be limited down to if you choose that option.
This dialog allows you to filter your current search.
Each of the Days listed note their name and the number of records that will be limited down to if you choose that option.