UNT Libraries Government Documents Department - 9,162 Matching Results

Search Results

$D^0 \bar{D}^0$ Mixing at BaBar

Description: This article reviews the recent measurement of D{sup 0}-{bar D}{sup 0} mixing with the D{sup 0} {yields} K{pi} decay channel from the BABAR experiment at the PEP-II B-Factory. Averages from the Heavy Flavor Averaging Group between this result and a previous result from BELLE are also presented.
Date: October 26, 2011
Creator: Coleman, Jonathon & /SLAC

1.3 GHz superconducting RF cavity program at Fermilab

Description: At Fermilab, 9-cell 1.3 GHz superconducting RF (SRF) cavities are prepared, qualified, and assembled into cryomodules (CMs) for Project X, an International Linear Collider (ILC), or other future projects. The 1.3 GHz SRF cavity program includes targeted R&D on 1-cell 1.3 GHz cavities for cavity performance improvement. Production cavity qualification includes cavity inspection, surface processing, clean assembly, and one or more cryogenic low-power CW qualification tests which typically include performance diagnostics. Qualified cavities are welded into helium vessels and are cryogenically tested with pulsed high-power. Well performing cavities are assembled into cryomodules for pulsed high-power testing in a cryomodule test facility, and possible installation into a beamline. The overall goals of the 1.3 GHz SRF cavity program, supporting facilities, and accomplishments are described.
Date: March 1, 2011
Creator: Ginsburg, C. M.; Arkan, T.; Barbanotti, S.; Carter, H.; Champion, M.; Cooley, L. et al.

3,4,3-LI(1,2-HOPO): In Vitro Formation of Highly Stable Lanthanide Complexes Translates into Efficacious In Vivo Europium Decorporation

Description: The spermine-based hydroxypyridonate octadentate chelator 3,4,3-LI(1,2-HOPO) was investigated for its ability to act as an antennae that sensitizes the emission of Sm{sup III}, Eu{sup III}, and Tb{sup III} in the Visible range (Φ{sub tot} = 0.2 - 7%) and the emission of Pr{sup III}, Nd{sup III}, Sm{sup III}, and Yb{sup III} in the Near Infra-Red range, with decay times varying from 1.78 μs to 805 μs at room temperature. The particular luminescence spectroscopic properties of these lanthanide complexes formed with 3,4,3-LI(1,2-HOPO) were used to characterize their respective solution thermodynamic stabilities as well as those of the corresponding La{sup III}, Gd{sup III}, Dy{sup III}, Ho{sup III}, Er{sup III}, Tm{sup III}, and Lu{sup III} complexes. The remarkably high affinity of 3,4,3-LI(1,2-HOPO) for lanthanide metal ions and the resulting high complex stabilities (pM values ranging from 17.2 for La{sup III} to 23.1 for Yb{sup III}) constitute a necessary but not sufficient criteria to consider this octadentate ligand an optimal candidate for in vivo metal decorporation. The in vivo lanthanide complex stability and decorporation capacity of the ligand were assessed, using the radioactive isotope {sup 152}Eu as a tracer in a rodent model, which provided a direct comparison with the in vitro thermodynamic results and demonstrated the great potential of 3,4,3-LI(1,2-HOPO) as a therapeutic metal chelating agent.
Date: July 13, 2011
Creator: Sturzbecher-Hoehne, Manuel; Ng Pak Leung, Clara; Daleo, Anthony; Kullgren, Birgitta; Prigent, Anne-Laure; Shuh, David K. et al.

N >= 4 Supergravity Amplitudes from Gauge Theory at One Loop

Description: We expose simple and practical relations between the integrated four- and five-point one-loop amplitudes of N {ge} 4 supergravity and the corresponding (super-)Yang-Mills amplitudes. The link between the amplitudes is simply understood using the recently uncovered duality between color and kinematics that leads to a double-copy structure for gravity. These examples provide additional direct confirmations of the duality and double-copy properties at loop level for a sample of different theories.
Date: August 19, 2011
Creator: Bern, Z.; /UCLA; Boucher-Veronneau, C.; /SLAC; Johansson, H. & /Saclay

8(a) Program: The Importance of Effective Fraud Prevention Controls

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses the results of our prior investigation of the Small Business Administration's (SBA) 8(a) Business Development Program. SBA's 8(a) program, named for a section of the Small Business Act, is a development program created to help small, disadvantaged businesses compete in the American economy and access the federal procurement market. To participate in the program, a firm must be certified as meeting several criteria, including: be a small business as defined by SBA; be unconditionally owned and controlled by one or more socially and economically disadvantaged individuals who are of good character and citizens of the United States; and show potential for success. Upon certification, firms can obtain federal contracts without competing fully and openly for the work. For example, agencies are permitted to enter into sole-source contracts after soliciting and negotiating with only one 8(a) company. They also can participate in restricted competitions for federal contracts, known as set-asides, open to only 8(a) companies. In March 2010, GAO issued two companion reports on the 8(a) program, one focused on internal control procedures and processes that SBA has implemented to ensure that only eligible firms participate in the program and one focused on fraud prevention. This testimony is based on the latter report, and addresses three issues: (1) whether ineligible firms were participating in the 8(a) program, (2) the results of our proactive testing of the application process, and (3) strengths and weaknesses in SBA's fraud prevention system."
Date: March 3, 2011
Creator: United States. Government Accountability Office.

08-ERD-071 Final Report: New Molecular Probes and Catalysts for Bioenergy Research

Description: A major thrust in bioenergy research is to develop innovative methods for deconstructing plant cell wall polymers, such as cellulose and lignin, into simple monomers that can be biologically converted to ethanol and other fuels. Current techniques for monitoring a broad array of cell wall materials and specific degradation products are expensive and time consuming. To monitor various polymers and assay their breakdown products, molecular probes for detecting specific carbohydrates and lignins are urgently needed. These new probes would extend the limited biochemical techniques available, and enable realtime imaging of ultrastructural changes in plant cells. Furthermore, degradation of plant biomass could be greatly accelerated by the development of catalysts that can hydrolyze key cell wall polysaccharides and lignin. The objective of this project was to develop cheap and efficient DNA reagents (aptamers) used to detect and quantify polysaccharides, lignin, and relevant products of their breakdown. A practical goal of the research was to develop electrochemical aptamer biosensors, which could be integrated into microfluidic devices and used for high-throughput screening of enzymes or biological systems that degrade biomass. Several important model plant cell wall polymers and compounds were targeted for specific binding and purification of aptamers, which were then tested by microscopic imaging, circular dichroism, surface plasmon resonance, fluorescence anisotropy, and electrochemical biosensors. Using this approach, it was anticiated that we could provide a basis for more efficient and economically viable biofuels, and the technologies established could be used to design molecular tools that recognize targets sought in medicine or chemical and biological defense projects.
Date: March 7, 2011
Creator: Thelen, M P; Rowe, A A; Siebers, A K & Jiao, Y

A 10,000 groove/mm multilayer coated grating for EUV spectroscopy

Description: Ultra-high spectral resolution in the EUV and soft x-ray energy ranges requires the use of very high line density gratings with optimal design resulting in use of a Blazed Multilayer Grating (BMG) structure. Here we demonstrate the production of near-atomically perfect Si blazed substrates with an ultra-high groove density (10,000 l/mm) together with the measured and theoretical performance of an Al/Zr multilayer coating on the grating. A 1st order absolute efficiency of 13percent and 24.6percent was achieved at incidence angles of 11o and 36o respectively. Cross-sectional TEM shows the effect of smoothing caused by the surface mobility of deposited atoms and we correlate this effect with a reduction in peak diffraction efficiency. This work shows the high performance that can be achieved with BMGs based on small-period anisotropic etched Si substrates, but also the constraints imposed by the surface mobility of deposited species.
Date: February 7, 2011
Creator: Voronov, Dmytro; Anderson, Erik; Cambie, Rossana; Cabrini, Stefano; Dhuey, Scott; Goray, Leonid et al.

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

Description: The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion ...
Date: May 1, 2011
Creator: Duckwitz, Noel

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

Description: The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety ...
Date: May 1, 2011
Creator: Duckwitz, Noel

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Description: Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. ...
Date: May 1, 2011
Creator: Duckwtiz, Noel

A 12 GHZ 50 MW Klystron for Support of Accelerator Research

Description: A 12 GHz 50MW X-band klystron is under development at the SLAC National Accelerator Laboratory Klystron Department. The klystron will be fabricated to support programs currently underway at three European Labs; CERN, PSI, and INFN Trieste. The choice of frequency selection was due to the CLIC RF frequency changing from 30 GHz to the European X-band frequency of 11.99 GHz in 2008. Since the Klystron Department currently builds 50MW klystrons at 11.424 GHz known collectively as the XL4 klystrons, it was deemed cost-effective to utilize many XL4 components by leaving the gun, electron beam transport, solenoid magnet and collector unchanged. To realize the rf parameters required, the rf cavities and rf output hardware were necessarily altered. Some improvements to the rf design have been made to reduce operating gradients and increase reliability. Changes in the multi-cell output structure, waveguide components, and the window will be discussed along with testing of the devices. Five klystrons known as XL5 klystrons are scheduled for production over the next two years.
Date: May 31, 2011
Creator: Sprehn, Daryl; /SLAC; Haase, Andrew; /SLAC; Jensen, Aaron; /SLAC et al.

50 MW X-BAND RF SYSTEM FOR A PHOTOINJECTOR TEST STATION AT LLNL

Description: In support of X-band photoinjector development efforts at LLNL, a 50 MW test station is being constructed to investigate structure and photocathode optimization for future upgrades. A SLAC XL-4 klystron capable of generating 50 MW, 1.5 microsecond pulses will be the high power RF source for the system. Timing of the laser pulse on the photocathode with the applied RF field places very stringent requirements on phase jitter and drift. To achieve these requirements, the klystron will be powered by a state of the art, solid-state, high voltage modulator. The 50 MW will be divided between the photoinjector and a traveling wave accelerator section. A high power phase shifter is located between the photoinjector and accelerator section to adjust the phasing of the electron bunches with respect to the accelerating field. A variable attenuator is included on the input of the photoinjector. The distribution system including the various x-band components is being designed and constructed. In this paper, we will present the design, layout, and status of the RF system.
Date: March 11, 2011
Creator: Marsh, R A; Anderson, S G; Barty, C J; Beer, G K; Cross, R R; Ebbers, C A et al.

100-BC-5 Operable Unit, Batch Leach Analyses and Report for Sediments at RI/FS Wells C7508, C7783, C7784, C7785, and C7787

Description: This is an analytical data report for sediment samples from the 100 BC Operable unit. This report contains the updated dates for samples associated with Hexavalent Chromium/Soil analysis. Between August 24, 2010 and March 3, 2011 sediment samples were received from 100-BC Decision Unit Soil for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.
Date: April 2011
Creator: Lindberg, Michael J.

100% DD Energy Model Update

Description: The Miami Science Museum energy model has been used during DD to test the building’s potential for energy savings as measured by ASHRAE 90.1-2007 Appendix G. This standard compares the designed building’s yearly energy cost with that of a code-compliant building. The building is currently on track show 20% or better improvement over the ASHRAE 90.1-2007 Appendix G baseline; this performance would ensure minimum compliance with both LEED 2.2 and current Florida Energy Code, which both reference a less strict version of ASHRAE 90.1. In addition to being an exercise in energy code compliance, the energy model has been used as a design tool to show the relative performance benefit of individual energy conservation measures (ECMs). These ECMs are areas where the design team has improved upon code-minimum design paths to improve the energy performance of the building. By adding ECMs one a time to a code-compliant baseline building, the current analysis identifies which ECMs are most effective in helping the building meet its energy performance goals.
Date: June 30, 2011

100-NR-2 Apatite Treatability Test: Fall 2010 Tracer Infiltration Test (White Paper)

Description: The primary objectives of the tracer infiltration test were to 1) determine whether field-scale hydraulic properties for the compacted roadbed materials and underlying Hanford fm. sediments comprising the zone of water table fluctuation beneath the site are consistent with estimates based laboratory-scale measurements on core samples and 2) characterize wetting front advancement and distribution of soil moisture achieved for the selected application rate. These primary objectives were met. The test successfully demonstrated that 1) the remaining 2 to 3 ft of compacted roadbed material below the infiltration gallery does not limit infiltration rates to levels that would be expected to eliminate near surface application as a viable amendment delivery approach and 2) the combined aqueous and geophysical monitoring approaches employed at this site, with some operational adjustments based on lessons learned, provides an effective means of assessing wetting front advancement and the distribution of soil moisture achieved for a given solution application. Reasonably good agreement between predicted and observed tracer and moisture front advancement rates was observed. During the first tracer infiltration test, which used a solution application rate of 0.7 cm/hr, tracer arrivals were observed at the water table (10 to 12 ft below the bottom of the infiltration gallery) after approximately 5 days, for an advancement rate of approximately 2 ft/day. This advancement rate is generally consistent with pre-test modeling results that predicted tracer arrival at the water table after approximately 5 days (see Figure 8, bottom left panel). This agreement indicates that hydraulic property values specified in the model for the compacted roadbed materials and underlying Hanford formation sediments, which were based on laboratory-scale measurements, are reasonable estimates of actual field-scale conditions. Additional work is needed to develop a working relationship between resistivity change and the associated change in moisture content so that 4D images of moisture ...
Date: April 14, 2011
Creator: Vermeul, Vincent R.; Fritz, Brad G.; Fruchter, Jonathan S.; Greenwood, William J.; Johnson, Timothy C.; Horner, Jacob A. et al.

200-BP-1 Prototype Hanford Barrier -- 15 Years of Performance Monitoring

Description: Monitoring is an essential component of engineered barrier system design and operation. A composite capacitive cover, including a capillary break and an evapotranspiration (ET) barrier at the Hanford Site, is generating data that can be used to help resolve these issues. The prototype Hanford barrier was constructed over the 216-B-57 Crib in 1994 to evaluate surface-barrier constructability, construction costs, and physical and hydrologic performance at the field scale. The barrier has been routinely monitored between November 1994 and September 1998 as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200 BP 1 Operable Unit. Since FY 1998, monitoring has focused on a more limited set of key water balance, stability, and biotic parameters. In FY 2009, data collection was focused on: (1) water-balance monitoring, consisting of precipitation, runoff, soil moisture storage, and drainage measurements with evapotranspiration calculated by difference; (2) stability monitoring, consisting of asphalt-layer-settlement, basalt-side-slope-stability, and surface-elevation measurements; (3) vegetation dynamics; and (4) animal use. September 2009 marked 15 years since the start of monitoring and the collection of performance data. This report describes the results of monitoring activities during the period October 1, 2008, through September 30, 2009, and summarizes the 15 years of performance data collected from September 1994 through September 2009.
Date: September 30, 2011
Creator: Ward, Anderson L.; Draper, Kathryn E.; Link, Steven O. & Clayton, Ray E.

200-DV-1OU Sediment and Pore Water Analysis and Report for Samples at Borehole C8096

Description: This is an analytical data report for sediment samples received at 200-DV-1 OU. On August 30, 2011 sediment samples were received from 200-DV-1 OU Borehole C8096 for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.
Date: October 1, 2011
Creator: Lindberg, Michael J.

A 200 MHz 35 MW Multiple Beam Klystron for Accelerator Applications Final Report

Description: Calabazas Creek Research, Inc. (CCR) performed initial development of a compact and reliable 35 MW, multiple beam klystron (MBK) at 200 MHz with a pulse length of 0.125 ms and a 30 Hz repetition rate. The device was targeted for acceleration and ionization cooling of a muon collider, but there are several other potential applications in this frequency range. The klystron uses multiple beams propagating in individual beam tunnels to reduce space charge and allow reduction in the accelerating voltage. This allows a significant reduction in length over a single beam source. More importantly this allows more efficient and less expensive power supplies. At 200 MHz, the interaction circuit for a single beam klystron would be more than six meters long to obtain 50% efficiency and 50 dB gain. This would require a beam voltage of approximately 400 kV and current of 251 A for a microperveance of 1.0. For an eight beam MBK with the same beam perveance, a three meter long interaction circuit achieves the same power and gain. Each beam operates at 142 kV and 70A. The Phase I demonstrated that this device could be fabricated with funding available in a Phase II program and could achieve the program specifications.
Date: November 28, 2011
Creator: Ives, R. Lawrence; Read, Michael; Ferguson, Patrick & Marsden, David

401(K) Plans: Certain Investment Options and Practices That May Restrict Withdrawals Not Widely Understood

Description: A letter report issued by the Government Accountability Office with an abstract that begins "401(k) plan sponsors are responsible for offering an array of appropriate investment options, and participants are responsible for directing their investments among those options. While participants expect to be able to switch investment options or withdraw money from their accounts, during the recent economic downturn, some 401(k) plan sponsors and participants found that they were restricted from doing so. GAO was asked to (1) identify some of the specific investments and practices that prevented plan sponsors and participants from accessing their 401(k) plan assets and (2) determine any changes the Department of Labor (Labor) could make to assist sponsors in understanding the challenges posed by the investments and practices that restricted withdrawals. To do this, GAO reviewed relevant federal laws and regulations and consulted with experts, federal officials, service providers, and plan sponsors."
Date: March 10, 2011
Creator: United States. Government Accountability Office.

401(K) Plans: Improved Regulation Could Better Protect Participants from Conflicts of Interest

Description: A letter report issued by the Government Accountability Office with an abstract that begins "Recent volatility in financial markets highlights the need for prudent investment decisions if 401(k) plans are to provide an adequate source of retirement income. While plan sponsors and participants may receive help in assessing their investment choices, concerns have been raised about the impartiality of the advice provided. GAO was asked to describe circumstances where service providers may have conflicts of interest in providing assistance related to the selection of investment options for (1) plan sponsors and (2) plan participants, and (3) steps the Department of Labor (Labor) has taken to address conflicts of interest related to the selection of investment options."
Date: January 28, 2011
Creator: United States. Government Accountability Office.