UNT Libraries Government Documents Department - 29 Matching Results

Search Results

Advanced Neutron Source (ANS) Project. Progress Report FY 1993

Description: This report covers the progress made in 1993 in the following sections: (1) project management; (2) research and development; (3) design and (4) safety. The section on research and development covers the following: (1) reactor core development; (2) fuel development; (3) corrosion loop tests and analysis; (4) thermal-hydraulic loop tests; (5) reactor control and shutdown concepts; (6) critical and subcritical experiments; (7) material data, structure tests, and analysis; (8) cold source development; (9) beam tube, guide, and instrument development; (10) neutron transport and shielding; (11) I and C research and development; and (12) facility concepts.
Date: January 1994
Creator: Campbell, J. H.; Selby, D. L.; Harrington, R. M. & Thompson, P. B.

AIDS Funding for Federal Government Programs: FY1981-FY1999

Description: This report provides a synopsis of the budget activity related to AIDS from the discovery of the disease in 1981 through FY1999. Funding for AIDS research, prevention and treatment programs within the Department of Health and Human Services (HHS) discretionary budget has increased from $200,000 in FY1981 to an estimated $3.85 billion in FY1999.
Date: March 31, 1998
Creator: Johnson, Judith A.

Defense Authorization and Appropriation Bills: FY1970-FY2006

Description: This report is a research aid, which lists the DOD authorization bills (Table 1) and appropriations bills (Table 2). This report includes all the pertinent information on the passage of these bills through the legislative process: bill numbers, report numbers, dates reported and passed, recorded vote numbers and vote tallies, dates of passage of the conference reports with their numbers and votes, vetoes, substitutions, dates of final passage, and public law numbers. Table 3 shows real growth or decline in national defense funding for FY1940-FY2009. Table 4 gives a more detailed picture of both regular and supplemental defense appropriations from the 103rd Congress to the present (FY1993-FY2005). Table 5 shows the President’s DOD appropriations budget requests for FY1950-FY2005 vs. final amount enacted.
Date: April 21, 2006
Creator: Coipuram, Thomas, Jr.

Defense Authorization and Appropriations Bills: FY1970-FY2006

Description: This report is a research aid, which lists the DOD authorization bills (Table 1) and appropriations bills (Table 2). This report includes all the pertinent information on the passage of these bills through the legislative process: bill numbers, report numbers, dates reported and passed, recorded vote numbers and vote tallies, dates of passage of the conference reports with their numbers and votes, vetoes, substitutions, dates of final passage, and public law numbers. Table 3 shows real growth or decline in national defense funding for FY1940-FY2009. Table 4 gives a more detailed picture of both regular and supplemental defense appropriations from the 103rd Congress to the present (FY1993-FY2005). Table 5 shows the President’s DOD appropriations budget requests for FY1950-FY2005 vs. final amount enacted.
Date: June 13, 2006
Creator: Coipuram, Thomas, Jr.

Defense Authorization and Appropriations Bills: FY1970-FY2006

Description: This report is a research aid, which lists the DOD authorization bills (Table 1) and appropriations bills (Table 2). This report includes all the pertinent information on the passage of these bills through the legislative process: bill numbers, report numbers, dates reported and passed, recorded vote numbers and vote tallies, dates of passage of the conference reports with their numbers and votes, vetoes, substitutions, dates of final passage, and public law numbers. Table 3 shows real growth or decline in national defense funding for FY1940-FY2009. Table 4 gives a more detailed picture of both regular and supplemental defense appropriations from the 103rd Congress to the present (FY1993-FY2005). Table 5 shows the President’s DOD appropriations budget requests for FY1950-FY2005 vs. final amount enacted.
Date: June 13, 2006
Creator: Coipuram, Thomas, Jr.

Defense Authorization and Appropriations Bills: FY1970-FY2017

Description: This report is a research aid that lists the Department of Defense (DOD) authorization bills (Table 1) and appropriations bills (Table 2) for FY1970-FY2017. This report includes all the pertinent information on the passage of these bills through the legislative process: bill numbers, report numbers, dates reported and passed, recorded vote numbers and vote tallies, dates of passage of the conference reports with their numbers and votes, vetoes, substitutions, dates of final passage, and public law numbers.
Date: January 18, 2017
Creator: DeBruyne, Nese F.

Functional design criteria for FY 1993-2000 groundwater monitoring wells

Description: The purpose of this revision is to update the Line Item Project, 93-L-GFW-152 Functional Design Criteria (FDC) to reflect changes approved in change control M-24-91-6, Engineering Change Notices (ECNs), and expand the scope to include subsurface investigations along with the borehole drilling. This revision improves the ability and effectiveness of maintaining RCRA and Operational groundwater compliance by combining borehole and well drilling with subsurface data gathering objectives. The total projected number of wells to be installed under this project has decreased from 200 and the scope has been broadened to include additional subsurface investigation activities that usually occur simultaneously with most traditional borehole drilling and monitoring well installations. This includes borehole hydrogeologic characterization activities, and vadose monitoring. These activities are required under RCRA 40 CFR 264 and 265 and WAC 173-303 for site characterization, groundwater and vadose assessment and well placement.
Date: January 1, 1996
Creator: Williams, B.A.

FY 93 Thermal Loading Systems Study Final Report

Description: The objective of the Mined Geologic Disposal System (MGDS) Thermal Loading Systems Study being conducted by the is to identify a thermal strategy that will meet the performance requirements for waste isolation and will be safe and licensable. Specifically, both postclosure and preclosure performance standards must be met by the thermal loading strategy ultimately selected. In addition cost and schedule constraints must be considered. The Systems Engineering approach requires structured, detailed analyses that will ultimately provide the technical basis for the development, integration, and evaluation of the overall system, not just a subelement of that system. It is also necessary that the systems study construct options from within the range that are allowed within the current legislative and programmatic framework. For example the total amount of fuel that can legally be emplaced is no more than 70,000 metric tons of uranium (MTU) which is composed of 63,000 MTU spent fuel and 7,000 MTU of defense high level waste. It is the intent of this study to begin the structured development of the basis for a thermal loading decision. However, it is recognized that to be able to make a final decision on thermal loading will require underground data on the effects of heating as well as a suite of ''validated'' models. It will be some time before these data and models are available to the program. Developing a final, thermal loading decision will, therefore, be an iterative process. In the interim, the objective of the thermal loading systems study has been to utilize the information available to assess the impact of thermal loading. Where technical justification exists, recommendations to narrow the range of thermal loading options can be made. Additionally, recommendations as to the type of testing and accuracy of the testing needed to establish the requisite information will be ...
Date: August 29, 1994
Creator: Saterlie, S.F.

FY 93 Thermal Loading Systems Study Final Report: Volume 1. Revision 1

Description: The ability to meet the overall performance requirements for the proposed Mined Geology Disposal System at Yucca Mountain, Nevada requires the two major subsystem (natural barriers and engineered barriers) to positively contribute to containment and radionuclide isolation. In addition to the postclosure performance the proposed repository must meet preclosure requirements of safety, retrievability, and operability. Cost and schedule were also considered. The thermal loading strategy chosen may significantly affect both the postclosure and preclosure performance of the proposed repository. Although the current Site Characterization Plan reference case is 57 kilowatts (kW)/acre, other thermal loading strategies (different areal mass loadings) have been proposed which possess both advantages and disadvantages. The objectives of the FY 1993 Thermal Loading Study were to (1) place bounds on the thermal loading which would establish the loading regime that is ``too hot`` and the loading regime that is ``too cold``, to (2) ``grade`` or evaluate the performance, as a function of thermal loading, of the repository to contain high level wastes against performance criteria and to (3) evaluate the performance of the various options with respect to cost, safety, and operability. Additionally, the effort was to (4) identify important uncertainties that need to be resolved by tests and/or analyses in order to complete a performance assessment on the effects of thermal loading. The FY 1993 Thermal Loading Study was conducted from December 1, 1992 to December 30, 1993 and this final report provides the findings of the study. Volume 1 contains the Introduction; Performance requirements; Input and assumptions; Near-field thermal analysis; Far-field thermal analysis; Cost analysis; Other considerations; System analysis; Additional thermal analysis; and Conclusions and recommendations. 71 refs., 54 figs.
Date: August 29, 1994
Creator: Saterlie, S. F. & Thomson, B. H.

FY 93 Thermal Loading Systems Study Final Report: Volume 2. Revision 1

Description: The ability to meet the overall performance requirements for the proposed Mined Geology Disposal System at Yucca Mountain, Nevada requires the two major subsystem (natural barriers and engineered barriers) to positively contribute to containment and radionuclide isolation. In addition to the postclosure performance the proposed repository must meet preclosure requirements of safety, retrievability, and operability. Cost and schedule were also considered. The thermal loading strategy chosen may significantly affect both the postclosure and preclosure performance of the proposed repository. Although the current Site Characterization Plan reference case is 57 kilowatts (kW)/acre, other thermal loading strategies (different areal mass loadings) have been proposed which possess both advantages and disadvantages. The objectives of the FY 1993 Thermal Loading Study were to (1) place bounds on the thermal loading which would establish the loading regime that is ``too hot`` and the loading regime that is ``too cold``, to (2) ``grade`` or evaluate the performance, as a function of thermal loading, of the repository to contain high level wastes against performance criteria and to (3) evaluate the performance of the various options with respect to cost, safety, and operability. Additionally, the effort was to (4) identify important uncertainties that need to be resolved by tests and/or analyses in order to complete a performance assessment on the effects of thermal loading. The FY 1993 Thermal Loading Study was conducted from December 1, 1992 to December 30, 1993 and this final report provides the findings of the study. Volume 2 consists of 10 appendices which contain the following: Waste Stream Analysis; Waste Package Design Inputs; Subsurface Design Inputs; Thermal-Hydrologic Model Inputs; Near-Field Calculations; Far-Field; Reliability of Electronics as a Function of Temperature; Cost Analysis Details; Geochemistry; and Areas of Uncertainty in Thermal Loading.
Date: August 29, 1994

FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project

Description: The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to individuals and populations. The primary objective of work to be performed in FY 1993 is to complete the source term estimates and dose estimates for key radionuclides for the air and river pathways. At the end of FY 1993, the capability will be in place to estimate doses for individuals in the extended (32-county) study area, 1944--1991. Native American research will continue to provide input for tribal dose estimates. In FY 1993, the Technical Steering Panel (TSP) will decide whether demographic and river pathways data collection should be extended beyond FY 1993 levels. The FY 1993 work scopes and milestones in this document are based on the work plan discussed at the TSP Budget/Fiscal Subcommittee meeting on August 19--20, 1991. Table 1 shows the FY 1993 milestones; Table 2 shows estimated costs. The subsequent work scope descriptions are based on the milestones. This document and the FY 1992 task plans will form the basis for a contract with Battelle and the Centers for Disease Control (CDC). The 2-year dose reconstruction contract is expected to begin in February 1992. This contract will replace the current arrangement, whereby the US Department of Energy directly funds the Pacific Northwest Laboratory to conduct dose reconstruction work. In late FY 1992, the FY 1993 task plans will be more fully developed with detailed technical approaches, data quality objectives, and budgeted labor hours. The task plans will be updated again in July 1993 to reflect any scope, milestone, or cost changes directed during the year by the TSP. 2 tabs.
Date: October 1, 1991
Creator: Shipler, D. B.

Geothermal Division Multiyear Plan FY 1992-1996

Description: This administrative report of the Department of Energy is dated December 21, 1990. It is marked ''DRAFT'' as were many of this type of report, most of which were never made ''Final''. It provides contextual elements for program planning, and covers research on Hydrothermal, Geopressured Geothermal, Hot Dry Rock, and Magma Energy systems. (DJE 2005)
Date: December 21, 1990

Geothermal Energy R&D Program Annual Progress Report Fiscal Year 1993

Description: In this report, the DOE Geothermal Program activities were split between Core Research and Industrial Development. The technical areas covered are: Exploration Technology, Drilling Technology, Reservoir Technology (including Hot Dry Rock Research and The Geyser Cooperation), and Conversion Technology (power plants, materials, and direct use/direct heat). Work to design the Lake County effluent pipeline to help recharge The Geysers shows up here for the first time. This Progress Report is another of the documents that are reasonable starting points in understanding many of the details of the DOE Geothermal Program. (DJE 2005)
Date: April 1, 1994

Ion Replacement Program Annual Report: 1993

Description: Annual report of the Ion Replacement Electrorefining Program at Aronne National Laboratory describing their research and activities. There are three key accomplishments highlighted for the year: (1) identification of a suitable sodium(beta){double_prime}-alumina/molten salt electrolyte system that functions reproducibly at 723 K, (2) actual separation of dysprosium and lanthanum in experiments, and (3) the identification of a metal alloy, Li{sub x}Sb, as an alternative ion replacement electrode.
Date: July 1993
Creator: Tomczuk, Z.

The Mid-Session Review of the President's Budget: Timing Issues

Description: This report provides information on the timing of submission of the mid-session review for FY1980-FY2009, a 30-year period that covers all or part of the administrations of five Presidents, applying to the last two years of the Carter Administration, and the full terms of the Reagan, George H. W. Bush, Clinton, and George W. Bush Administrations.
Date: August 19, 2008
Creator: Keith, Robert

Northeast Waste Management Alliance (NEWMA). Annual report FY 1993

Description: Funding was provided to Brookhaven National Laboratory in the fourth quarter of FY93 to establish a regional alliance as defined by Dr. Clyde Frank during his visit to BNL on March 7, 1993. In collaboration with the Long Island Research Institute (LIRI), BNL developed a business plan for the Northeast Waste Management Alliance (NEWMA). Concurrently, informal discussions were initiated with representatives of the waste management industry, and meetings were held with local and state regulatory and governmental personnel to obtain their enthusiasm and involvement. A subcontract to LIRI was written to enable it to formalize interactions with companies offering new waste management technologies selected for their dual value to the DOE and local governments in the Northeast. LIRI was founded to develop and coordinate economic growth via introduction of new technologies. As a not-for-profit institution it is in an ideal position to manage the development of NEWMA through ready access to venture capital and strong interactions with the business community, universities, and BNL. Another subcontract was written with a professor at SUNY/Stony Brook to perform an evaluation of new pyrolitic processes, some of which may be appropriate for development by NEWMA. Independent endorsement of the business plan recently by another organization, GETF, with broad knowledge of DOE/EM-50 objectives, provides a further incentive for moving rapidly to implement the NEWMA strategy. This report describes progress made during the last quarter of FY93.
Date: November 1993
Creator: Goland, A. N. & Kaplan, E.