Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program. Bi-monthly progress report, 1 July--31 August 1975

Description: Significant events, activities and achievements on the MHW LES 8/9 and MJS Programs for the reporting period are reported. Topics discussed include safety systems, isotope heat source, converter, product assurance, hardware fabrication, acceptance testing, and ground support equipment. (TFD)
Date: Autumn 1975
open access

Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program. Bi-monthly progress report, 1 May--30 June 1975

Description: Significant events, activities and achievements on the MHW LES 8/9 and MJS Programs for the reporting period are reported. Topics discussed include programmatic, safety, systems, isotope heat source, converter, product assurance, hardware fabrication, acceptance testing, and ground support equipment. (TFD)
Date: Summer 1975
open access

Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program, Bi-monthly progress report, 1 November--31 December 1975

Description: Significant events, activities and achievements on the MHW LES 8/9 and MJS Programs for the reporting period are reported. Topics discussed include safety systems, isotope heat source, converter, product assurance, hardware fabrication, acceptance testing, and ground support equipment. (TFD)
Date: 1976-01~
open access

Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program. Bi-monthly progress report, 1 September--31 October 1974

Description: Significant events, activities and achievements on the MHW LES 8/9 and MJS Programs for the reporting period are reported. Topics discussed include programmatic, safety, systems, isotope heat source, converter, product assurance, acceptance testing, and converter fabrication. (TFD)
Date: Winter 1974
open access

Multi-hundred watt radioisotope thermoelectric generator program, LES 8/9 program, MJS program. Period from 1 September--31 October 1975

Description: Significant activities performed or monitored by the General Electric Company on the MHW-RTG Program during Sept. and Oct. 1975 are reported. The work included safety, design, development, integration with ERDA and associate contractors, product assurance, hardware fabrication, and acceptance testing. (TFD)
Date: Winter 1975