UNT Libraries Government Documents Department - 870 Matching Results

Search Results

15.4% CuIn1-XGaXSe2-Based Photovoltaic Cells from Solution-Based Precursor Films
We have fabricated 15.4%- and 12.4%-efficient CuIn1-XGaXSe2 (CIGS)-based photovoltaic devices from solution-based electrodeposition (ED) and electroless-deposition (EL) precursors. As-deposited precursors are Cu-rich CIGS. Additional In, Ga, and Se are added to the ED and EL precursor films by physical vapor deposition (PVD) to adjust the final film composition to CuIn1-XGaXSe2. The ED and EL device parameters are compared with those of a recent world record, an 18.8%-efficient PVD device. The tools used for comparison are current voltage, capacitance voltage, and spectral response characteristics.
101-SY waste sample speed of sound/rheology testing for sonic probe program
One problem faced in the clean-up operation at Hanford is that a number of radioactive waste storage tanks are experiencing a periodic buildup and release of potentially explosive gases. The best known example is Tank 241-SY-101 (commonly referred to as 101-SY) in which hydrogen gas periodically built up within the waste to the point that increased buoyancy caused a roll-over event, in which the gas was suddenly released in potentially explosive concentrations (if an ignition source were present). The sonic probe concept is to generate acoustic vibrations in the 101-SY tank waste at nominally 100 Hz, with sufficient amplitude to cause the controlled release of hydrogen bubbles trapped in the waste. The sonic probe may provide a potentially cost-effective alternative to large mixer pumps now used for hydrogen mitigation purposes. Two important parameters needed to determine sonic probe effectiveness and design are the speed of sound and yield stress of the tank waste. Tests to determine these parameters in a 240 ml sample of 101-SY waste (obtained near the tank bottom) were performed, and the results are reported.
105-K east sandfilter backwash line sample analysis report. Second campaign
This project seeks to produce uranium (U) and plutonium (Pu) analyses of samples taken from the KE basin filter backwash line each time the sand filter is backwashed. K Basin operations will use the analytical results to determine additions of fissile materials to the backwash sludge pit and thereby maintain a running inventory of fissile elements in the pit. K Basin Operations must not exceed a certain total inventory in order to be within a criticality specification. The second campaign of this project consisted of three samples, numbered by the customer 208KEB, 209KEB, and 210KEB.
105-K east sandfilter backwash line sample analysis report: Third campaign
This project seeks to produce uranium (U) and plutonium (Pu) analyses of samples taken from the KE basin filter backwash line each time the sand filter is backwashed. K Basin operations will use the analytical results to determine additions of fissile materials to the backwash sludge pit and thereby maintain a running inventory of fissile elements in the pit. K Basin operations must not exceed a certain total inventory in order to be within a criticality specification. The third campaign of this project consisted of three samples, numbered by the customer 245KEB, 246KEB, and 247KEB. A revised letter of instruction controlled their processing.
200 area effluent treatment facility basic support systems operational test specification
This document identifies the test requirements for the 200 Area Effluent Treatment Facility Basic Support Systems
241-AN-A pit leak detection ANA-WT-LDSTA-331 acceptance test procedure
This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.
241-AN-A valve pit manifold valves and position indication acceptance test procedure
This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-A Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.
241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure
This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.
241-AN-B valve pit manifold valves and position indication acceptance test procedure
This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-B Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.
241-U-701 new compressor building and instrument air piping analyses
Building anchorage analysis is performed to qualify the design of the new compressor building foundation given in the ECN ``241-U-701 New Compressor Building.`` Recommendations for some changes in the ECN are made accordingly. Calculations show that the 6-in.-slab is capable of supporting the pipe supports, and that the building foundation, air compressor and dryer anchorage, and electric rack are adequate structurally. Analysis also shows that the instrument air piping and pipe supports for the compressed air system meet the applicable code requirements and are acceptable. The building is for the U-Farm instrument air systems.
242-A Campaign 99-1 process control plan
242-A Evaporator 99-1 will process approximately one million gallons of waste from tank 102-AW in June 1999. The process control Plan provides a general description of activities, which will occur during 242-A Evaporator Campaign 99-1 and to document analyses conducted to demonstrate that 102-AW waste is acceptable for processing. Predict is a registered trademark of Risk Decisions England Corporation, United Kingdom.
309 Building fire protection analysis and justification for deactivation of sprinkler system. Revision 1
Provide a `graded approach` fire evaluation in preparation for turnover to Environmental Restoration Contractor for D&D. Scope includes revising 309 Building book value and evaluating fire hazards, radiological and toxicological releases, and life safety issues.
324 Building radiochemical engineering cells, high-level vault, low-level vault, and associated areas closure plan
The Hanford Site, located adjacent to and north of Richland, Washington, is operated by the US Department of Energy, Richland Operations Office (RL). The 324 Building is located in the 300 Area of the Hanford Site. The 324 Building was constructed in the 1960s to support materials and chemical process research and development activities ranging from laboratory/bench-scale studies to full engineering-scale pilot plant demonstrations. In the mid-1990s, it was determined that dangerous waste and waste residues were being stored for greater than 90 days in the 324 Building Radiochemical Engineering Cells (REC) and in the High-Level Vault/Low-Level Vault (HLV/LLV) tanks. [These areas are not Resource Conservation and Recovery Act of 1976 (RCRA) permitted portions of the 324 Building.] Through the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-89, agreement was reached to close the nonpermitted RCRA unit in the 324 Building. This closure plan, managed under TPA Milestone M-20-55, addresses the identified building areas targeted by the Tri-Party Agreement and provides commitments to achieve the highest degree of compliance practicable, given the special technical difficulties of managing mixed waste that contains high-activity radioactive materials, and the physical limitations of working remotely in the areas within the subject closure unit. This closure plan is divided into nine chapters. Chapter 1.0 provides the introduction, historical perspective, 324 Building history and current mission, and the regulatory basis and strategy for managing the closure unit. Chapters 2.0, 3.0, 4.0, and 5.0 discuss the detailed facility description, process information, waste characteristics, and groundwater monitoring respectively. Chapter 6.0 deals with the closure strategy and performance standard, including the closure activities for the B-Cell, D-Cell, HLV, LLV; piping and miscellaneous associated building areas. Chapter 7.0 addresses the closure activities identified in Chapter 6.0, and also adds information on closure activities for the soil directly …
324 Facility special-case waste assessment in support of 324 closure (TPA milestone M-89-05)
Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05, requires US Department of Energy, Richland Operations Office to complete a 324 Facility Special-Case Waste Assessment in Support of 324 Closure. This document, HNF-1270, has been prepared with the intent of meeting this regulatory commitment. Alternatives for the special-case wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel.
340 Facility emergency preparedness hazards assessment
This document establishes the technical basis in support of Emergency Planning activities for the 340 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone, is demonstrated.
340 waste handling complex: Deactivation project management plan
This document provides an overview of the strategy for deactivating the 340 Waste Handling Complex within Hanford`s 300 Area. The plan covers the period from the pending September 30, 1998 cessation of voluntary radioactive liquid waste (RLW) transfers to the 340 Complex, until such time that those portions of the 340 Complex that remain active beyond September 30, 1998, specifically, the Retention Process Sewer (RPS), can also be shut down and deactivated. Specific activities are detailed and divided into two phases. Phase 1 ends in 2001 after the core RLW systems have been deactivated. Phase 2 covers the subsequent interim surveillance of deactivated and stand-by components during the period of continued RPS operation, through the final transfer of the entire 340 Complex to the Environmental Restoration Contractor. One of several possible scenarios was postulated and developed as a budget and schedule planning case.
1995 Annual wildlife survey report. Natural Resource Protection and Compliance Program
This report summarizes the results of wildlife surveys performed at Rocky Flats Environmental Technology Site (RFETS) from January through December of 1995 as compared with results from previous years. These surveys were performed as part of a long-term ecological monitoring program conducted under the Natural Resource Protection and Compliance Program (NRPCP). This program is essential in identifying and describing fluctuations of wildlife populations, wildlife habitat use, and changes in species using RFETS. The NRPCP provides support to the Department of Energy (DOE) in its role as Natural Resource Trustee, and provides data essential to accomplishing the goal of preserving the unique ecological values of RFETS in keeping with the Rocky Flats Vision presented in the Rocky Flats Cleanup Agreement Public Comment Draft. Wildlife population densities vary due to natural pressures and human influences, and only long-term monitoring can verify which factors influencing wildlife populations are the consequence of natural fluctuations, and which are due to human influences. The wildlife monitoring described in this report provides qualitative data that give an indication of the ecological health of RFETS. Monitoring numbers, habitat affinities, and apparent health of the wildlife populations makes it possible to evaluate the overall ecological health of the site. Monitoring and surveys such as those carried out by the NRPCP can indicate trends of this sort, and act as an {open_quotes}early warning system{close_quotes} for impending ecological problems.
1997 Gordon Research Conference on Plant Cell Walls. Final progress report
The Gordon Research Conference (GRC) on Plant Cell Walls was held at Tilton School, Tilton, New Hampshire, July 18-22, 1997. The conference was well attended with 106 participants. The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both US and foreign scientists, senior researchers, young investigators, and students. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. In addition to these formal interactions, free time was scheduled to allow informal discussions. Such discussions are fostering new collaborations and joint efforts in the field.
1998 Annual report on waste generation and waste minimization progress as required by DOE order 5400.1 Hanford Site
No Description Available.
1998 Gordon Research Conference on Mutagenesis. Final progress report.
This final progress report includes brief comments on the organization of the conference, the conference program, and a list of attendees.
1999 Inventions and Innovations Brochure
The U.S. Department of Energy DOE's Inventions and Innovation (I&I) Program can help if you are an individual inventor or small business planning to develop your energy-saving invention or innovation. The program provides financial assistance at two levels and also offers technical guidance and commercialization support to successful applicants.
1999 Report on Hanford Site land disposal restriction for mixed waste
This report was submitted to meet the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-26-011. This milestone requires the preparation of an annual report that covers characterization, treatment, storage, minimization, and other aspects of managing land-disposal-restricted mixed waste at the Hanford Facility.
ABCASH plotting program users guide
The Automated Bar Coding of Air Samples at Hanford (ABCASH) system provides an integrated data collection, sample tracking, and data reporting system for radioactive particulate air filter samples. The ABCASH plotting program provides a graphical trend report for ABCASH of the performance of air sample results. This document provides an operational guide for using the program. Based on sample location identifier and date range, a trend chart of the available data is generated. The trend chart shows radiological activity versus time. General indications of directional trend of the concentrations in air over time may be discerned. Comparison limit set point values are also shown as derived from the ABCASH data base.
Abrasion Resistant Coating and Method of making the same
An abrasion resistant coating is created by adding a ductile phase to a brittle matrix phase during spray coating where an Al-Cu-Fe quasicrystalline phase (brittle matrix) and an FeAl intermetallic (ductile phase) are combined. This composite coating produces a coating mostly of quasicrystal phase and an inter-splat layer of the FeAl phase to help reduce porosity and cracking within the coating. Coatings are prepared by plasma spraying unblended and blended quasicrystal and intermetallic powders. The blended powders contain 1, 5, 10 and 20 volume percent of the intermetallic powders. The unblended powders are either 100 volume percent quasicrystalline or 100 volume percent intermetallic; these unblended powders were studied for comparison to the others. Sufficient ductile phase should be added to the brittle matrix to transform abrasive wear mode from brittle fracture to plastic deformation, while at the same time the hardness of the composite should not be reduced below that of the original brittle phase material.
The AC Quadrupole in RHIC
The report is about the AC Quadrupole in RHIC
Acceptance test procedure, 241-SY-101 flexible receiver system, Phase II testing
No Description Available.
Acceptance test procedure for removal of CS1K circuit switcher block and trip schemes
This supporting document provides a detailed process to test the functions of the circuit switcher, protective relays, alarms, SCADA and 125VDC control logic of 115kV and 13.8kV systems at B3S4 substation following the removal of trip and blocking schemes to Transformer No.1 Circuit Switcher B594.
Acceptance test procedure for tank bottom thermocouples on Tank 241-SY-101. Revision 2
No Description Available.
Acceptance Test Report for the high pressure water jet system canister cleaning fixture
This Acceptance Test confirmed the test results and recommendations, documented in WHC-SD-SNF-DTR-001, Rev. 0 Development Test Report for the High Pressure Water Jet System Nozzles, for decontaminating empty fuel canisters in KE-Basin. Optimum water pressure, water flow rate, nozzle size and overall configuration were tested
Acceptance testing report of Eductor System to be installed in the 105 K Basins
The Spent Nuclear Fuel (SNF) Project Engineering Support group cold-tested the Eductor System a 15 horsepower multi-stage centrifugal pump manufactured by the Grunfos Corporation with the housing manufactured and sold with the pump by the Tri-Nuclear Corporation and a 3-inch diameter water jet eductor manufactured by the Fox Valve Corporation. The Eductor System was tested to gather and document information to optimize sludge retrieval operations for use in the 105 K Basins. The cold-testing took place during February 12 through February 29, 1996 in the 305 Cold Test Facility basin located in the 300 area. The pump, utilized in conjunction with the eductor, makes up the core of the Eductor System. The pumping unit consists of a 15 hp stainless steel multi-stage centrifugal Grunfos pump which is seated in a stainless steel fabricated housing. Two baskets or filter elements make up part of the housing on the suction side of the pump. The pump can be used independent of the housing but the housing has two identified purposes. The first use is to stabilize the centrifugal pump and give the pneumatic valves and pump discharge piping a solid platform so the Eductor System can be more easily mobilized within the basin as one unit. The second use for the housing presents the option to utilize the suction-side filters for capturing larger fuel pieces after the smaller fines have been removed.
Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report
On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board`s investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63).
Acoustic resonance spectroscopy (ARS): ARS300 operations manual, software version 2.01
Acoustic Resonance Spectroscopy (ARS) is a nondestructive evaluation technology developed at the Los Alamos National Laboratory. The ARS technique is a fast, safe, and nonintrusive technique that is particularly useful when a large number of objects need to be tested. Any physical object, whether solid, hollow, or fluid filled, has many modes of vibration. These modes of vibration, commonly referred to as the natural resonant modes or resonant frequencies, are determined by the object`s shape, size, and physical properties, such as elastic moduli, speed of sound, and density. If the object is mechanically excited at frequencies corresponding to its characteristic natural vibrational modes, a resonance effect can be observed when small excitation energies produce large amplitude vibrations in the object. At other excitation frequencies, i.e., vibrational response of the object is minimal.
Adaptive Remote-Sensing Techniques Implementing Swarms of Mobile Agents
In many situations, stand-off remote-sensing and hazard-interdiction techniques over realistic operational areas are often impractical "and difficult to characterize. An alternative approach is to implement an adap- tively deployable array of sensitive agent-specific devices. Our group has been studying the collective be- havior of an autonomous, multi-agent system applied to chedbio detection and related emerging threat applications, The current physics-based models we are using coordinate a sensor array for mukivanate sig- nal optimization and coverage as re,alized by a swarm of robots or mobile vehicles. These intelligent control systems integrate'glob"ally operating decision-making systems and locally cooperative learning neural net- works to enhance re+-timp operational responses to dynarnical environments examples of which include obstacle avoidance, res~onding to prevailing wind patterns, and overcoming other natural obscurants or in- terferences. Collectively',tkensor nefirons with simple properties, interacting according to basic community rules, can accomplish complex interconnecting functions such as generalization, error correction, pattern recognition, sensor fusion, and localization. Neural nets provide a greater degree of robusmess and fault tolerance than conventional systems in that minor variations or imperfections do not impair performance. The robotic platforms would be equipped with sensor devices that perform opticaI detection of biologicais in combination with multivariate chemical analysis tools based on genetic and neural network algorithms, laser-diode LIDAR analysis, ultra-wideband short-pulsed transmitting and receiving antennas, thermal im- a:ing sensors, and optical Communication technology providing robust data throughput pathways. Mission scenarios under consideration include ground penetrating radar (GPR) for detection of underground struc- tures, airborne systems, and plume migration and mitigation. We will describe our research in these areas anti give a status report on our progress.
Additional critical experiments for computer code validation base
This paper describes the validation, in accordance with ANSI/ANS-8.1-1983(R1988), of KENO V.a using the 27-group ENDF/B-IV cross section library for some neutronic systems containing highly-enriched uranium, carbon, and hydrogen. This constituent combination is present in many packaging applications for the safe transportation of fissile and fissionable materials. The validation has been performed for two separate computational platforms: an IBM 3090 mainframe and an HP 9000 Series 700 workstation, both using the Oak Ridge Y-12 Plant Nuclear Criticality Safety Software (NCSS) code package. Critical experiments performed at the Oak Ridge Critical Experiments Facility in support of the Rover reactor program were identified as having the constitutents desired for this validation as well as sufficient experimental detail to allow accurate construction of KENO V.a calculational models. Calculated values of k{sub eff} for the Rover experiments, which contain uranium, carbon, and hydrogen, are between 1.0012 {+-} 0.0026 and 1.0245 {+-} 0.0023. These experiments can now be added to KENO V.a and other computer code critical experiment data bases which are used for validation and to establish upper limits on calculated values of k{sub eff} for specific applications.
Adult Education and Family Literacy Act, Title II of the Workforce Investment Act of 1998, P.L. 105-220
This report is concerned with the federal adult education and literacy programs authorized by the Adult Education and Family Literacy Act (AEFLA). The report covers funding and spending in the program and how it is budgeted. The report also discusses the consequences of the AEFLA repealing the Adult Education Act (AEA) but continuing some of the programs that were under it.
AN ADVANCED CONTROL SYSTEM FOR FINE COAL FLOTATION
A model-based flotation control scheme is being implemented to achieve optimal performance in the handling and treatment of fine coal. The control scheme monitors flotation performance through on-line analysis of tailings ash content. Then, based on an on-line estimate of incremental ash, the pulp level is adjusted using a model-based control algorithm to compensate for feed variations and other process disturbances. Recent developments in sensor technology are being applied for on-line determination of slurry ash content. During the tenth quarter of this project, Task 6 (Equipment Procurement and Installation) was completed through the efforts of J.A. Herbst and Associates, Virginia Tech, Pittston Coal Company, and FGR Automation. As a result of this work, a model-based control system is now in place which can predict incremental ash based on tailings ash content and general plant data, and adjust pulp level accordingly to maintain a target incremental ash. Testing of this control system is expected to be carried out during the next quarter, and the results of this testing will be reported in the Eleventh Quarterly report. In addition, calibration of the video-based ash analyzer was continued and an extensive set of calibration data were obtained showing that the plant is running remarkably well under manual control. This may be a result of increased attention being paid to froth flotation as a result of this project.
An Advanced Control System For Fine Coal Flotation
A model-based flotation control scheme is being implemented to achieve optimal performance in the handling and treatment of fine coal. The control scheme monitors flotation performance through on-line analysis of ash content. Then, based on the economic and metallurgical performance of the circuit, variables such as collector dosage, frother dosage, and pulp level are adjusted using model-based control algorithms to compensate for feed variations and other process disturbances. Recent developments in sensor technology are being applied for on-line determination of slurry ash content. During the ninth quarter of this project, Task 3 (Model Building and Computer Simulation) and Task 4 (Sensor Testing) were nearly completed, and Task 6 (Equipment Procurement and Installation) was initiated. Previously, data collected from the plant sampling campaign (Task 2) were used to construct a population balance model to describe the steady-state and dynamic behavior of the flotation circuit. The details of this model were presented in the Eighth Quarterly Technical Progress Report. During the past quarter, a flotation circuit simulator was designed and used to evaluate control strategies. As a result of this work, a model-based control strategy has been conceived which will allow manipulated variables to be adjusted in response to disturbances to achieve a target incremental ash value in the last cell of the bank. This will, in effect, maximize yield at an acceptable product quality. During this same period, a video-based ash analyzer was installed on the flotation tailings stream at the Moss No. 3 preparation plant. A preliminary calibration curve was established, and data are continuing to be collected in order to improve the calibration of the analyzer.
Advanced Lightning Location Interferometer: Final Report
In January, 1994, New Mexico Institute for Mining and Technology (NM Tech) was commissioned by Los Alamos National Laboratories (LANL) to develop a three-axis interferometric lightning mapping system to be used in determining the source of certain frequency-dispersed pulse pairs which had been detected by spaceborne sensors. The existing NM Tech VHF Lightning Interferometer was a two axis system operating at 274 MHz with 6 MHz bandwidth. The third axis was to be added to refine estimates of the elevation angle to distant RF sources in that band. The system was to be initially deployed in support of an Air Force Technical Applications Center (AFTAC) effort planned for the Kennedy Space Center/Cape Canaveral AFS area in June-July of 1994. The project was, however, postponed until September of 1994. The interferometer was set up and operated at KSC near the Lightning Detection and Ranging (LDAR) central station. The initial setup was in two-axis configuration, and the third (vertical) axis was added at about mid-project. Though the storms were reduced in frequency and severity over what one would expect in mid-summer, several good data sets were obtained and delivered to AFTAC.
Advanced microinstrumentation for rapid DNA sequencing and large DNA fragment separation
Our efforts to develop novel technology for a rapid DNA sequencer and large fragment analysis system based upon gel electrophoresis are described. We are using microfabrication technology to build dense arrays of high speed micro electrophoresis lanes that will ultimately increase the sequencing rate of DNA by at least 100 times the rate of current sequencers. We have demonstrated high resolution DNA fragment separation needed for sequencing in polyacrylamide microgels formed in glass microchannels. We have built prototype arrays of microchannels having up to 48 channels. Significant progress has also been made in developing a sensitive fluorescence detection system based upon a confocal microscope design that will enable the diagnostics and detection of DNA fragments in ultrathin microchannel gels. Development of a rapid DNA sequencer and fragment analysis system will have a major impact on future DNA instrumentation used in clinical, molecular and forensic analysis of DNA fragments.
Advanced nuclear reactor public opinion project
This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.
Advanced nuclear reactor public opinion project. Interim report
This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.
Advanced Reactors Transition program fiscal year 1998 multi-year work plan
The mission of the Advanced Reactors Transition program is two-fold. First, the program is to maintain the Fast Flux Test Facility (FFTF) and the Fuels and Materials Examination Facility (FMEF) in Standby to support a possible future role in the tritium production strategy. Secondly, the program is to continue deactivation activities which do not conflict with the Standby directive. On-going deactivation activities include the processing of non-usable, irradiated, FFTF components for storage or disposal; deactivation of Nuclear Energy legacy test facilities; and deactivation of the Plutonium Recycle Test Reactor (PRTR) facility, 309 Building.
Advanced Reservoir Characterization in the Antelope Shale to Establish the Viability of C02 Enhanced Oil Recovery in California's Monterey Formation Siliceous Shales
The primary objective of this research is to conduct advanced reservoir characterization and modeling studies in the Antelope Shale reservoir. Characterization studies will be used to determine the technical feasibility of implementing a CO2 enhanced oil recovery project in the Antelope Shale in Buena Vista Hills Field. The Buena Vista Hills pilot CO2 project will demonstrate the economic viability and widespread applicability of CO2 flooding in fractured siliceous shale reservoirs of the San Joaquin Valley. The research consists of four primary work processes: Reservoir Matrix and Fluid Characterization; Fracture Characterization; Reservoir Modeling and Simulation; and CO2 Pilot Flood and Evaluation. Work done in these areas is subdivided into two phases or budget periods. The first phase of the project will focus on the application of a variety of advanced reservoir characterization techniques to determine the production characteristics of the Antelope Shale reservoir. Reservoir models based on the results of the characterization work will be used to evaluate how the reservoir will respond to secondary recovery and EOR processes. The second phase of the project will include the implementation and evaluation of an advanced enhanced oil recovery (EOR) pilot in the West Dome of the Buena Vista Hills Field.
Advanced Reservoir Characterization in the Antelope Shale to Establish the Viability of CO(2) Enhanced Oil Recovery in California`s Monterey formation Siliceous Shales. Progress report, April 1-June 30, 1997
The primary objective of this research is to conduct advanced reservoir characterization and modeling studies in the Antelope Shale reservoir. Characterization studies will be used to determine the technical feasibility of implementing a C0{sub 2} enhanced oil recovery project in the Antelope Shale in Buena Vista Hills Field. The Buena Vista Hills Pilot C0{sub 2} project will demonstrate the economic viability and widespread applicability of C0{sub 2} flooding in fractured siliceous shale reservoirs of the San Joaquin Valley. The research consists of four primary work processes: Reservoir Matrix and Fluid Characterization; Fracture Characterization; Reservoir Modeling and Simulation; and C0{sub 2} Pilot Flood and Evaluation. Work done in these areas is subdivided into two phases or budget periods. The first phase of the project will focus on the application of a variety of advanced reservoir characterization techniques to determine the production characteristics of the Antelope Shale reservoir. Reservoir models based on the results of the characterization work will be used to evaluate how the reservoir will respond to secondary recovery and EOR processes. The second phase of the project will include the implementation and evaluation of an advanced enhanced oil recovery (EOR) pilot in the United Anticline (West Dome) of the Buena Vista Hills Field.
Advanced reservoir characterization in the Antelope Shale to establish the viability of CO{sub 2} enhanced oil recovery in California`s Monterey formation siliceous shales. Quarterly report, April 1, 1997--June 30, 1997
The primary objective of this research is to conduct advanced reservoir characterization and modeling studies in the Antelope Shale reservoir. Characterization studies will be used to determine the technical feasibility of implementing a CO{sub 2} enhanced oil recovery project in the Antelope Shale in Buena Vista Hills Field. The Buena Vista Hills pilot CO{sub 2} project will demonstrate the economic viability and widespread applicability of CO{sub 2} flooding in fractured siliceous shale reservoirs of the San Joaquin Valley. The research consists of four primary work processes: Reservoir Matrix and Fluid Characterization; Fracture Characterization; Reservoir Modeling and Simulation; and CO{sub 2} Pilot Flood and Evaluation. Work done in these areas is subdivided into two phases or budget periods. The first phase of the project will focus on the application of a variety of advanced reservoir characterization techniques to determine the production characteristics of the Antelope Shale reservoir. Reservoir models based on the results of the characterization work will be used to evaluate how the reservoir will respond to secondary recovery and EOR processes. The second phase of the project will include the implementation and evaluation of an advanced enhanced oil recovery (EOR) pilot in the United Anticline (West Dome) of the Buena Vista Hills Field.
Aerial oxidation of tetraethyl silicate and effect on ammonia catalyzed hydrolysis
Colloidal suspensions of Si0{sub 2} in ethanol prepared by the ammonia catalyzed hydrolysis of tetraethyl silicate (TEOS) in ethanol have been routinely used for over 10 years to prepare antireflective (AR) coatings on the fused silica transmissive optical components of high power fusion lasers. Very high purity coatings are required to avoid laser damage and these are obtained when the TEOS is fractionally distilled under N{sub 2} prior to use. Recently we found that products from aerial oxidation of distilled TEOS, had a significant effect on the particle size of our coating suspensions to the detriment of the optical performance. We require particle sizes less than 20 nm to avoid light loss due to scatter and contaminated TEOS gave suspensions with much higher particle sizes. Oxidation products were identified by GC mass spectroscopy and included acetaldehyde, acetic acid, silicon acetates and reaction products of these compounds with ethanol. Acetic acid and silicon acetates were found to be the major cause of large particle formation. These could be removed by careful redistillation preferably in the presence of a small quantity of magnesium ethoxide. Storage in sealed containers over N{sub 2} avoided further problems.
Aerogels for microelectronic applications: Fast, inexpensive, and light as air
Silica aerogel consists of bonded silicon and oxygen joined into log strands, which are randomly linked together with pockets of air between them. Discovered in the 1930s, the material was thought to have little use outside of theoretical science. However, with the advent of greatly improved processing techniques, such as those developed at Lawrence Livermore National Laboratory, aerogels are on the verge of commercialization. This document describes the need for aerogels in the high-speed microelectronics industry, and state of the art processing techniques. Collaboration is welcomed in the endeavor.
Aging and Radiation Effects in Stockpile Electronics
It is likely that aging is affecting the radiation hardness of stockpile electronics, and we have seen apparent examples of aging that affects the electronic radiation hardness. It is also possible that low-level intrinsic radiation that is inherent during stockpile life will damage or in a sense age electronic components. Both aging and low level radiation effects on radiation hardness and stockpile reliability need to be further investigated by using both test and modeling strategies that include appropriate testing of electronic components withdrawn from the stockpile.
Agreed-Upon Procedures: Airport and Airway Trust Fund Excise Taxes
Correspondence issued by the General Accounting Office with an abstract that begins "Pursuant to a legislative requirement, GAO reviewed whether the net excise tax revenue distributed to the Airport and Airway Trust Fund (AATF) for the fiscal year (FY) ended September 30, 1998, is supported by the underlying records."
Agreed-Upon Procedures: Black Lung Disability Trust Fund Excise Taxes
Correspondence issued by the General Accounting Office with an abstract that begins "Pursuant to a legislative requirement, GAO reviewed whether the net excise tax revenue distributed to the Black Lung Disability Trust Fund (BLDTF) for the fiscal year (FY) ended September 30, 1998, is supported by the underlying records."
Back to Top of Screen