UNT Libraries Government Documents Department - 790 Matching Results

Search Results

Primary view of 45-Day safety screen results for Tank 241-C-101, auger sample 95-AUG-019
Sasaki, L.M.
May 11, 1995
Primary view of 97-ERD-022 final report: Supernova on Nova
Remington, B. A.
March 11, 1999
Primary view of 100-D Ponds groundwater quality assessment
Hartman, M. J.
April 11, 1996
Primary view of 105-DR Large Sodium Fire Facility closure activities evaluation report
Adler, J. G.
April 11, 1996
Primary view of 105 K east ion exchange and cartridge filter restart computer software design description
Schermerhorn, D.S.
December 11, 1995
Primary view of 105 K east ion exchange and cartridge filter restart computer software requirements specification
Schermerhorn, D.S.
December 11, 1995
Primary view of 105 K east ion exchange and cartridge filter restart computer software user documentation
Schermerhorn, D.S.
December 11, 1995
Primary view of 241-SY-101 air lance removal lessons learned
Moore, T. L. & Titzler, P. A.
October 11, 1994
Primary view of 241-SY-101 data acquisition and control system (DACS) operator interface upgrade operational test report
Ermi, A. M.
May 11, 1999
Primary view of 300 Area treated effluent disposal facility sampling schedule
Loll, C. M.
October 11, 1994
Primary view of 2D deterministic radiation transport with the discontinuous finite element method
Kershaw, D. & Harte, J.
November 11, 1993
Primary view of Accelerated alpha radiation damage in a ceramic waste form, interim results
Frank, S. M.; Johnson, S. G.; Moschetti, T. L.; O'Holleran, T. P.; Sinkler, W.; Esh, D. et al.
November 11, 1999
Primary view of Acceleration of compact toruses and fusion applications
Hartman, C. W.; Eddleman, J. L.; Hammer, J. H.; Logan, B. G.; McLean, H. S. & Molvik, A. W.
October 11, 1990
Primary view of Acceptance test procedure for K basins dose reduction project clean and coat equipment
Creed, R.F.
March 11, 1996
Primary view of Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L
Koch, M. R.
October 11, 1999
Primary view of Acceptance Test Report for AMS-4 Continuous Air Monitors (CAM) at 241AN Exhausters
SCAIEF, C.C.
November 11, 1999
Primary view of Acceptance test report, inlet air filter and control station pressure decay leak test
Tuck, J.A., Fluor Daniel Hanford
February 11, 1997
Primary view of Accounting of test specimens for the long-term corrosion testing
Gdowski, G.
October 11, 1995
Primary view of Active voltammetric microsensors with neural signal processing.
Vogt, M. C.
December 11, 1998
Primary view of An adaptive optics package designed for astronomical use with a laser guide star tuned to an absorption line of atomic sodium
Salmon, J. T.; Avicola, K. & Brase, J. M.
April 11, 1994
Primary view of AN ADVANCED CONTROL SYSTEM FOR FINE COAL FLOTATION
Luttrell, G. H. & Adel, G. T.
January 11, 1999
Primary view of Advanced thermal barrier coating system development: Technical progress report
unknown creator
December 11, 1996
Primary view of Advanced thermal barrier coating system development. Technical progress report, September 1, 1996--November 30, 1996
unknown creator
December 11, 1996
Primary view of ADVANCED TURBINE SYSTEM CONCEPTUAL DESIGN AND PRODUCT DEVELOPMENT
Mayer, Albrecht H.
May 11, 1998
Back to Top of Screen