UNT Libraries Government Documents Department - 5,284 Matching Results

Search Results

open access

1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan

Description: Manage the Site Systems Engineering process to provide a traceable, integrated, requirements-driven, and technically defensible baseline., Through the Site Integration Group, Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering`s primary interfaces are with the Project Direction Office and with the projects, as well as with the Planning organization.
Date: October 3, 1997
Creator: Ferguson, J. E.
open access

(2,2-Bipyridyl)bis(eta5-1,2,3,4,5-pentamethylcyclopentadienyl)Strontium(II)

Description: In the title compound, the Sr-N distances are 2.624 (3) and 2.676 (3) Angstroms. The Sr-centroid distances are 2.571 and 2.561 Angstroms. The N-C-C-N torsion angle in the bipyridine ligand is 2.2 (4){sup o}. Interestingly, the bipyridine ligand is tilted. The angle between the plane defined by Sr1, N1 and N2 and the plane defined by the 12 atoms of the bipyridine ligand is 10.7{sup o}.
Date: July 3, 2008
Creator: Kazhdan, Daniel; Kazhdan, Daniel; Hu, Yung-Jin; Kokai, Akos; Levi, Zerubba & Rozenel, Sergio
open access

8(a) Program: The Importance of Effective Fraud Prevention Controls

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses the results of our prior investigation of the Small Business Administration's (SBA) 8(a) Business Development Program. SBA's 8(a) program, named for a section of the Small Business Act, is a development program created to help small, disadvantaged businesses compete in the American economy and access the federal procurement market. To participate in the program, a firm must be certified as meeting several criteria, including: be a small business as defined by SBA; be unconditionally owned and controlled by one or more socially and economically disadvantaged individuals who are of good character and citizens of the United States; and show potential for success. Upon certification, firms can obtain federal contracts without competing fully and openly for the work. For example, agencies are permitted to enter into sole-source contracts after soliciting and negotiating with only one 8(a) company. They also can participate in restricted competitions for federal contracts, known as set-asides, open to only 8(a) companies. In March 2010, GAO issued two companion reports on the 8(a) program, one focused on internal control procedures and processes that SBA has implemented to ensure that only eligible firms participate in the program and one focused on fraud prevention. This testimony is based on the latter report, and addresses three issues: (1) whether ineligible firms were participating in the 8(a) program, (2) the results of our proactive testing of the application process, and (3) strengths and weaknesses in SBA's fraud prevention system."
Date: March 3, 2011
Creator: United States. Government Accountability Office.
open access

9/11 Commission Report: Reorganization, Transformation, and Information Sharing

Description: Testimony issued by the Government Accountability Office with an abstract that begins "The sorrow, loss, anger, and resolve so evident immediately following the September 11, 2001, attacks have been combined in an effort to help assure that our country will never again be caught unprepared. As the 9/11 Commission notes, we are safer today but we are not safe, and much work remains. Although in today's world we can never be 100 percent secure, and we can never do everything everywhere, we concur with the Commission's conclusion that the American people should expect their government to do its very best. GAO's mission is to help the Congress improve the performance and ensure the accountability of the federal government for the benefit of the American people. GAO has been actively involved in improving government's performance in the critically important homeland security area both before and after the September 11 attacks. In its request, the House Committee on Government Reform have asked GAO to address two issues: the lack of effective information sharing and analysis and the need for executive branch reorganization in response to the 9/11 Commission recommendations. Further, the Committee has asked GAO to address how to remedy problems in information sharing and analysis by transforming the intelligence community from a system of "need to know" to one of a "need to share.""
Date: August 3, 2004
Creator: United States. Government Accountability Office.
open access

A 12 GHz RF Power Source for the CLIC Study

Description: The CLIC RF frequency has been changed in 2008 from the initial 30 GHz to the European X-band 11.9942 GHz permitting beam independent power production using klystrons for CLIC accelerating structure testing. A design and fabrication contract for five klystrons at that frequency has been signed by different parties with SLAC. France (IRFU, CEA Saclay) is contributing a solid state modulator purchased in industry and specific 12 GHz RF network components to the CLIC study. RF pulses over 120 MW peak at 230 ns length will be obtained by using a novel SLED-I type pulse compression scheme designed and fabricated by IAP, Nizhny Novgorod, Russia. The X-band power test stand is being installed in the CLIC Test Facility CTF3 for independent structure and component testing in a bunker, but allowing, in a later stage, for powering RF components in the CTF3 beam lines. The design of the facility, results from commissioning of the RF power source and the expected performance of the Test Facility are reported.
Date: July 3, 2012
Creator: Schirm, Karl; Curt, Stephane; Dobert, Steffen; McMonagle, Gerard; Rossat, Ghislain; Syratchev, Igor et al.
open access

"25" Critically Consultation with J. W. Morfitt : April 3, 1950

Description: Summary: "Criticality was considered impossible in any contingency encountered in practice under either of the following conditions which include no safety factor: (a) In any isolated cylinder not more than 5 in. in disruptor, if the total amount of U235 present does not exceed 7.5 Eg. (b) In an isolated vessel of any shape and size, if the total amount of U235 present does not exceed 880 g. An "isolated" vessel is one which does not "see" more than 0.1 [...] other vessels containing fissionable material."
Date: April 3, 1950
Creator: Merrill, E. T. & Sege, G.
open access

45-Day safety screen results for tank 241-C-105, push mode, cores 72 and 76

Description: This document is a report of the analytical results for samples collected between March 14 and March 22, 1995 from the radioactive wastes in Tank 241-C-105 at the Hanford Reservation. Core samples were collected from the solid wastes in the tank and underwent safety screening analyses including differential scanning calorimetry, thermogravimetric analysis, and total alpha analysis.
Date: May 3, 1995
Creator: Sasaki, L.M.
open access

100 Areas technical activities report - physics, July 1951

Description: This is the monthly 100 areas technical activities report for the physics group for the month of July 1951. This group was concerned with pile related studies. Work discussed includes neutron attenuation measurements in pile shielding test facilities, studies of physical properties of shielding materials (concrete), work on a xenon generator and separation facility, further development and shielding work for a neutron spectrometer, continued work on a magnetic spectrometer, and counting equipment. Studies of neutron fluxes from exponential piles, and criticality studies are also discussed.
Date: August 3, 1951
open access

200-BP-1 Prototype Hanford Barrier Annual Monitoring Report for Fiscal Year 2004

Description: In FY 2004, monitoring of the prototype Hanford barrier focused on barrier stability, vegetative cover, evidence of plant and animal intrusion, and the main components of the water balance. Monitored water-balance components included precipitation, runoff, storage, drainage, and deep percolation. Precipitation in FY 2004 was 26 percent less than in FY 2003 but was still higher than normal. The seasonal distribution in precipitation was also different from the previous year with a 43 percent reduction in spring precipitation and a 46 percent increase in summer precipitation. The cumulative amount of water received from October 1994, through September 2004, was 2,559.58 mm on the northern half of the barrier, which is the formerly irrigated treatment, and 1,886.71 mm on the southern non-irrigated treatments. Water storage continued to show a cyclic pattern, increasing in the winter and declining in the spring and summer to a lower limit of about 100 mm in response to evapotranspiration. The 600-mm design storage has never been exceeded. Total drainage from the soil-covered plots range from 2.9E-4 mm to 0.22 mm or 0.003 6 0.004 percent of precipitation. Side-slope drainage was much higher at 20.9 6 2.3 percent of precipitation from the gravel and 18.6 6 5.1 percent from the riprap. There was no runoff from the barrier, but runoff from the BY tank farm following a thunderstorm in May eroded a 45-inch-deep channel into the structural fill at the toe of the riprap slope. Above-asphalt and below-asphalt moisture measurements show no evidence of deep percolation of water. Topographic surveys were conducted on the barrier surface, including the two settlement gauges and 12 creep gauges on the riprap slope using aerial photogrammetry (AP) and a global positioning system (GPS). Comparing the aerial photogrammetry (AP) and global positioning system (GPS) surveys with the traditional survey shows the barrier …
Date: January 3, 2005
Creator: Ward, Andy L.; Linville, Jenifer K.; Keller, Jason M. & Seedahmed, Gamal H.
open access

241-SX tank farm waste storage

Description: Salt wastes from the Redox solvent extraction process have been routed to the 241-SX tank farm for storage since May 21, 1954. Tanks in this farm contain wastes from three types of irradiated uranium processing: (1) low (approximately 250 MWD/T) and (2) high (approximately 600 MWD/T) natural uranium; and (3) E-metal. It is estimated that approximately 1.6 Kgs of Am-Cm, 17 Kgs of Np-237, 20 Kgs of Pu and 8 tons of uranium are present in the sludges from wastes generated through 4-30-64. A total of 12.1 Kgs of the 29.1 Kgs of Np-237 estimated has been recovered or is present in the Redox Np-237 accumulation cycle as of 4-30-64. Because of the potential for unmeasured losses (such as Pu or U precipitates) the total plutonium and uranium may exceed the quantities stated herein. A breakdown of the estimates by tanks is provided.
Date: September 3, 1964
Creator: Hanson, G. L.
open access

300 Area Building Retention Evaluation Mitigation Plan

Description: Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.
Date: July 3, 2007
Creator: McBride, D. J.
open access

305 Building Cold Test Facility Management Plan

Description: This document provides direction for the conduct of business in Building 305 for cold testing tools and equipment. The Cold Test Facility represents a small portion of the overall building, and as such, the work instructions already implemented in the 305 Building will be utilized. Specific to the Cold Test there are three phases for the tools and equipment as follows: 1. Development and feature tests of sludge/fuel characterization equipment, fuel containerization equipment, and sludge containerization equipment to be used in K-Basin. 2. Functional and acceptance tests of all like equipment to be installed and operated in K-Basin. 3. Training and qualification of K-Basin Operators on equipment to be installed and operated in the Basin.
Date: October 3, 1994
Creator: Whitehurst, R.
open access

500 MW X-Band RF System of a 0.25 GeV Electron LINAC for Advanced Compton Scattering Source Application

Description: A Mono-Energetic Gamma-Ray (MEGa-Ray) Compton scattering light source is being developed at LLNL in collaboration with the SLAC National Accelerator Laboratory. The electron beam for the Compton scattering interaction will be generated by a X-band RF gun and a X-band LINAC at the frequency of 11.424 GHz. High power RF in excess of 500 MW is needed to accelerate the electrons to energy of 250 MeV or greater for the interaction. Two high power klystron amplifiers, each capable of generating 50 MW, 1.5 msec pulses, will be the main high power RF sources for the system. These klystrons will be powered by state of the art solid-state high voltage modulators. A RF pulse compressor, similar to the SLED II pulse compressor, will compress the klystron output pulse with a power gain factor of five. For compactness consideration, we are looking at a folded waveguide setup. This will give us 500 MW at output of the compressor. The compressed pulse will then be distributed to the RF gun and to six traveling wave accelerator sections. Phase and amplitude control are located at the RF gun input and additional control points along the LINAC to allow for parameter control during operation. This high power RF system is being designed and constructed. In this paper, we will present the design, layout, and status of this RF system.
Date: July 3, 2012
Creator: Chu, Tak Sum; Anderson, Scott; Barty, Christopher; Gibson, David; Hartemann, Fred; Marsh, Roark et al.
open access

An 805 MHz disk and washer structure for the Fermilab Linac Upgrade

Description: The Linac Upgrade program, a portion of the Tevatron Upgrade, calls for increasing the energy of the existing 200 MeV, 201.25 MHz linac to 400 MeV in order to reduce beam emittance degradation in the Booster. This is to be accomplished by replacing the last four Alvarez linac tanks with more efficient, higher gradient 805 MHz linac structure. One of the linac structures currently under study in a collaboration between Fermilab and SAIC is the Disk-and-Washer accelerating structure with bi-periodic tee supports, four per washer pair. This structure has a stop-band for the TM/sub 11/ mode (a problem in other designs) centered near the ..pi.. TM/sub 02/ accelerating mode frequency. A novel heat shrinking technique is used in the construction of a ten-cell one-meter long vacuum prototype structure. Description of the structure, testing techniques and test results are presented. 9 refs., 4 figs., 1 tab.
Date: October 3, 1988
Creator: Moretti, A.; Young, D.; Lee, G.; Mills, F.E.; Zhou, P.; Swenson, D.A. et al.
open access

T-1020 NaI crystal test for DM-Ice

Description: This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and the experiments of the NaI Crystal Test for DM-Ice from the University of Wisconsin who have committed to participate in detector tests to be carried out during the 2011-2012 Fermilab Neutrino program. The memorandum is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this memorandum to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. The DM-Ice collaboration is designing a sodium-iodide (NaI) based detector for a direct dark matter search. The detectors should have low readout noise and background levels to carry out a sensitive search. A 17-kg version of the experiment is running at the South Pole, 2500 m deep in the Antarctic ice, and a large scale experiment is currently being designed. One of the keys to the success of the experiment is to have a good understanding of the background levels intrinsic in the NaI detectors. To measure the background level, the detectors have to be shielded against cosmic rays. The lead shielding used for DAMIC in the Minos Underground Areas is a well-suited location for this test since it offers enough overburden to shield against cosmic rays, lead shielding, and experimental infrastructure. The goal of the test is to assess the background levels in the detector and to assess the characteristics of phosphorescence induced by muons and 100 keV-3 MeV gamma rays.
Date: November 3, 2011
Creator: Maruyama, Reina; Heeger, Karsten; Pierpoint, Zachary; Pettus, Walter; Broerman, Benjamin; Hilgenberg, Chris et al.
Back to Top of Screen