UNT Libraries Government Documents Department - 4,992 Matching Results

Search Results

4-inch sample recovery canisters, Test Model D series. Final report, September 1969--May 1970

Description: Six tests were conducted on 4-Inch Test Model D Closures to develop an improved closure for the redesigned Sandia Recovery Canister (SRC). The first three closures tested used variations of the high explosive (HE) design used on the previous Model B (Second) Series (P64283). The last three units tested used variations of the HE design used in the Midi Mist Event SRC.
Date: 1970
Creator: Goode, P. L. & Neff, G. W.

200-GeV proton-proton elastic scattering at high transverse momentum

Description: This is a proposal to study p-p elastic scattering at the highest possible P{sub {perpendicular}}{sup 2} at NAL, using a CH{sub 2} or H{sub 2} target placed directly in the extracted beam and a double arm spectrometer. We expect to be able to set an upper limit at the level d{sigma}/dt/d{sigma}/dt{sub t=0} {approx} 10{sup -14}. This would be sufficient to determine if there are exactly three regions in the p-p interaction with considerable precision.
Date: June 1, 1970
Creator: Ratner, L.G.; /Argonne; Krisch, A.D.; Roberts, J.B.; Terwilliger, K.M. & U., /Michigan

325-B FACILITY

Description: Due to the continuing high air sample results over the past six months, a thorough review of conditions and procedures was felt necessary for 325-B facility. A complete survey of the facility was made, looking for possible or definite problems. A discussion about procedures and conditions was held with all Radiation Monitoring personnel involved with the facility. The following items we felt needed attention to improve the working environment for the personnel in the facility. 1. Recommend glovebox be decontaminated and gloves changed to reduce dose rates. 2. Repair fume hood for proper airflow. 3. Move slurp jug inside fume hood and provide lead shielding. 4. Change storage of samples outside of cells to reduce dose rates. 5. Recommend contaminated waste from cells be bagged when removed through transfer tray. 6. Recommend fume hoods be installed at cell transfer trays. During a recent house cleaning, personnel in 325-B took action to correct items number 1 through 5, which leaves item number 6 to be considered. The need for fume hoods is based on high air sample results. These fume hoods would be very helpful in the unpackaging of contaminated samples. The removal of samples from the cell requires good air flow due to contamination levels.
Date: February 1, 1971