3-D computer simulations of EM field sin the APS vacuum chamber. Part 2: Time-domain analysis

Description: Our simulations suggest that the strong peak around 4 GHz in the narrow gap observed in the measurements is generated by TE modes. Therefore, one should not worry about this peak insofar as the coupling impedance is concerned. On the other hand, some discrepancies between our simulations and the measurements are noticed and remain to be resolved.
Date: January 20, 1989
Creator: Chou, W.
open access

A 12-MW-scale pilot study of in-duct scrubbing (IDS) using a rotary atomizer

Description: A low-cost, moderate-removal efficiency, flue gas desulfurization (FGD) technology was selected by the US Department of Energy for pilot demonstration in its Acid Rain Precursor Control Technology Initiative. The process, identified as In-Duct Scrubbing (IDS), applies rotary atomizer techniques developed for lime-based spray dryer FGD while utilizing existing flue gas ductwork and particulate collectors. IDS technology is anticipated to result in a dry desulfurization process with a moderate removal efficiency (50% or greater) for high-sulfur coal-fired boilers. The critical elements for successful application are: (1) adequate mixing of sorbent droplets with flue gas for efficient reaction contact, (2) sufficient residence time to produce a non-wetting product, and (3) appropriate ductwork cross-sectional area to prevent deposition of wet reaction products before particle drying is comple. The ductwork in many older plants, previously modified to meet 1970 Clean Air Act requirements for particulate control, usually meet these criteria. A 12 MW-scale IDS pilot plant was constructed at the Muskingum River Plant of the American Electric Power System. The pilot plant, which operates from a slipstrem attached to the air-preheater outlet duct from the Unit 5 boiler at the Muskingum River Plant (which burns about 4% sulfur coal), is equipped with three atomizer stations to test the IDS concept in vertical and horizontal configurations. In addition, the pilot plant is equipped to test the effect of injecting IDS off- product upstream of the atomizer, on SO{sub 2}and NO{sub x} removals.
Date: November 1, 1989
Creator: Samuel, E. A.; Murphy, K. R. & Demian, A.
open access

A 12-MW-scale pilot study of in-duct scrubbing (IDS) using a rotary atomizer

Description: A low-cost, moderate-removal efficiency, flue gas desulfurization (FGD) technology was selected by the US Department of Energy for pilot demonstration in its Acid Rain Precursor Control Technology Initiative. The process, identified as In-Duct Scrubbing (IDS), applies rotary atomizer techniques developed for lime-based spray dryer FGD while utilizing existing flue gas ductwork and particulate collectors. IDS technology is anticipated to result in a dry desulfurization process with a moderate removal efficiency (50% or greater) for high-sulfur coal-fired boilers. The critical elements for successful application are: (1) adequate mixing of sorbent droplets with flue gas for efficient reaction contact, (2) sufficient residence time to produce a non-wetting product, and (3) appropriate ductwork cross-sectional area to prevent deposition of wet reaction products before particle drying is comple. The ductwork in many older plants, previously modified to meet 1970 Clean Air Act requirements for particulate control, usually meet these criteria. A 12 MW-scale IDS pilot plant was constructed at the Muskingum River Plant of the American Electric Power System. The pilot plant, which operates from a slipstrem attached to the air-preheater outlet duct from the Unit 5 boiler at the Muskingum River Plant (which burns about 4% sulfur coal), is equipped with three atomizer stations to test the IDS concept in vertical and horizontal configurations. In addition, the pilot plant is equipped to test the effect of injecting IDS off- product upstream of the atomizer, on SO{sub 2}and NO{sub x} removals.
Date: November 1, 1989
Creator: Samuel, E. A.; Murphy, K. R. & Demian, A.
open access

40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond

Description: This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs.
Date: March 1, 1989
Creator: Chamness, M.A.; Luttrell, S.P. & Dudziak, S.
open access

40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

Description: This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.
Date: March 1, 1989
Creator: Bjornstad, B.N. & Dudziak, S.
open access

324 and 325 Building Hot Cell Cleanout Program: Air lock cover block refurbishment

Description: The high-density concrete cover blocks shielding the pipe trench in the hot-cell air lock of the 324 Building Radiochemical Engineering Cells had accumulated fixed radioactivity ranging from 1100 to 22, 000 mrad/hr. A corresponding increase in the radiation exposure to personnel entering the air lock, together with ALARA concerns, led to the removal of the contaminated concrete surface with a hydraulic spaller and the emplacement of a stainless steel covering over a layer of grout. The resultant saving in radiation exposure is estimated to be 7200 mrad for personnel completing burial box runs for the 324 and 325 Building Hot Cell Cleanout Program. Radiation exposure to all staff members entering the air lock is now at least 50% lower. 3 refs., 22 figs., 1 tab.
Date: May 1, 1989
Creator: Katayama, Y.B.; Holton, L.K. Jr. & Gale, R.M.
open access

324 and 325 Building hot cell cleanout program: Decontamination of C-Cell

Description: During FY 1989 the decontamination of C-Cell of Hanford's 324 Building was completed as part of the 324 and 325 Building Hot Cell Cleanout Program sponsored by the DOE Nuclear Energy's Surplus Facilities Management Program. The decontamination effort was completed using a series of remote and contact decontamination techniques. Initial radiation readings in C-Cell averaged 50 rad/hr and were reduced remotely to less than 200 mrad/hr using an alkaline foam cleaner followed by a 5000-psi water flush. Contact decontamination was then permissible using ultra high-pressure water, at 36,000 psi, further reducing the average radiation level in the cell to less than 86 mrem/hr. The approach used in decontaminating C-Cell resulted in a savings in radiation exposure of 87% and a cost savings of 39% compared to a hands-on procedure used in A-Cell, 324 Building in 1987. The radiation dose and the costs to achieve a 244-fold reduction in radiation contamination were 1.65 mrem per ft{sup 2} and $96 per ft{sup 2} of cell surface area. 14 figs., 4 tabs.
Date: October 1, 1989
Creator: Katayama, Y.B. & Holton, L.K. Jr.
open access

1986 wet deposition temporal and spatial patterns in North America

Description: The focus of this report is on North American wet deposition temporal patterns from 1979 to 1986 and spatial patterns for 1986. The report provides statistical distribution summaries of annual precipitation-weighted average concentration and annual deposition for nine ion species: hydrogen, sulfate, nitrate, ammonium, calcium, chloride, sodium, potassium, and magnesium. The data in the report are from the Acid Depositing System (ADS) for the statistical reporting of North American deposition data. Isopleth maps, based on surface estimation using kriging, display concentration and deposition spatial patterns of pH, hydrogen, sulfate, nitrate, ammonium, and calcium ion species for 1986 annual, winter, and summer periods. The temporal pattern analyses use a subset of 30 sites over an 8-year (1979-1986) period and an expanded subset of 137 sites with greater spatial coverage over a 5-year (1982-1986) period. The 8-year period represents the longest period with wet deposition monitoring data unavailable that has a sufficient number of sites with data of known quality to allow a descriptive summary of annual temporal patterns. 19 refs., 105 figs., 29 tabs.
Date: July 1, 1989
Creator: Olsen, A.R.
open access

1987 calibration of the TFTR neutron spectrometers

Description: The {sup 3}He neutron spectrometer used for measuring ion temperatures and the NE213 proton recoil spectrometer used for triton burnup measurements were absolutely calibrated with DT and DD neutron generators placed inside the TFTR vacuum vessel. The details of the detector response and calibration are presented. Comparisons are made to the neutron source strengths measured from other calibrated systems. 23 refs., 19 figs., 6 tabs.
Date: December 1, 1989
Creator: Barnes, C.W.; Strachan, J.D. (Los Alamos National Lab., NM (USA) & Princeton Univ., NJ (USA). Plasma Physics Lab.)
open access

The 1987 Federal field exercise: The DOE experience

Description: The second full-scale field exercise of the Federal Radiological Emergency Response Plan (FRERP) was held at the Zion Nuclear Power Station, Zion, Illinois, in June 1987. The exercise incorporated the annual compliance exercise for the Zion plant and involved the operating utility, Commonwealth Edison Company, the states of Illinois and Wisconsin, local governments, volunteer groups, and representatives from 12 federal agencies. The 3-day exercise was played from many locations in the Zion area; Springfield, Illinois; Madison, Wisconsin; and Washington, DC. Approximately 1000 people participated in the exercise, which used a scenario in which an accident at the plant resulted in the release of radioactive material outside the plant boundary. The US Department of Energy (DOE) had major responsibilities during the planning, playing, and critiquing of the exercise; these functions are outlined in the report. This document describes the DOE participation in the planning and response during the exercise. During a radiological emergency, the FRERP gives DOE the responsibility for coordinating the federal radiological monitoring and assessment activities in support of the states and the cognizant federal agency. At Zion, a self-sufficient Federal Radiological Monitoring and Assessment Center was established by DOE at a nearby fairground in which over 200 people from DOE, the two states, and other federal agencies participated. Before the field exercise, a tabletop exercise and a dry run were held for training purposes. 5 refs., 6 figs.
Date: June 1, 1989
Creator: Adler, M.V. & Gant, K.S.
open access

1987 Neutron and gamma personnel dosimeter intercomparison study using a D₂O-moderated /sup 252/Cf source

Description: The thirteenth Personnel Dosimetry Intercomparison Study (i.e., PDIS 13) was conducted during April 1987 as a joint effort by Oak Ridge National Laboratory's (ORNL) Dosimetry Applications Research Group and the Southwest Radiation Calibration Center at the University of Arkansas. A total of 48 organizations (34 from the US and 14 from abroad) participated in PDIS 13. Participants submitted a total of 1,113 neutron and gamma dosimeters for this mixed field study. The dosimeters were transferred by mail and were handled by experimental personnel at ORNL and the University of Arkansas. The type of neutron dosimeter and the percentage of participants submitting that type are as follows: TLD-albedo (49%), direct interaction TLD (31%), CR-39 (17%), film (3%). The type of gamma dosimeter and the percentage of participants submitting that type are as follows: Li/sub 2/B/sub 4/O/sub 7/, alone or in combination with CaSO/sub 4/, (69%), /sup 7/LiF (28%), natural LiF (3%). Radiation exposures in PDIS 13 were limited to 0.5 and 1.5 mSv from /sup 252/Cf moderated by 15-cm of D/sub 2/O. Traditional exposures using the Health Physics Research Reactor (HPRR) were not possible due to the fact that all reactors at ORNL, including the HPRR, were shutdown by order of the Department of Energy at the time the intercomparison was performed. Planned exposures using a /sup 238/PuBe source were negated by a faulty timing mechanism. Based on accuracy and precision, direct interaction TLD dosimeters exhibited the best performance in PDIS 13 neutron measurements. They were followed, in order of best performance, by CR-39, TLD albedo, and film. The Li/sub 2/B/sub 4/O/sub 7/ type TLD dosimeters exhibited the best performance in PDIS 13 gamma measurements. They were followed by natural LiF, /sup 7/LiF, and film. 12 refs., 1 fig., 5 tabs.
Date: May 1, 1989
Creator: Swaja, R. E.; West, L. E.; Sims, C. S. & Welty, T. J.
open access

1988 Bulletin compilation and index

Description: This document is published to provide current information about the national program for managing spent fuel and high-level radioactive waste. This document is a compilation of issues from the 1988 calendar year. A table of contents and one index have been provided to assist in finding information.
Date: February 1989
open access

The A0 abort system for the Tevatron upgrade

Description: The installation of electrostatic separator modules at B48 and C17 in the Tevatron necessitates changes to the Tevatron abort system. There will no longer be room for either the proton or antiproton kicker magnets used in the present system. The kickers at C17 will be permanently removed. The kickers at B48 will be temporarily removed for collider operation and will be replaced for fixed target operation. The existing proton abort system will remain unchanged during fixed target operation. This note describes a proposed abort system for operation in the collider mode for 22 on 22 bunches and provides details of specifications for the required components. In certain cases, for example in the case of the pulsers for the magnets and the absorber assembly, system components are designed with the option of upgrading to 44 on 44 bunch operation in mind. 8 refs., 14 figs.
Date: March 1, 1989
Creator: Crawford, Curtis
open access

Abstracted publications related to the Hanford environment, 1980 to 1988

Description: This abstracted bibliography provides a reference to the diverse environmental activities conducted on the Hanford Site from 1980 through 1988. It includes 500 reports and articles that were prepared largely by onsite contractors and the Department of Energy. Documents contained here were separated into eight subject areas: air and atmosphere, aquatic ecology, effluents and wastes, geology and hydrology, Hanford Site, radioactivity, terrestrial ecology, and socioeconomics. These areas form the basis of a key word index, which is intended to help the reader locate subjects of interest. An author index is also included.
Date: May 1, 1989
Creator: Becker, C.D. & Gray, R.H.
open access

AC-DC Difference Calibrations

Description: Abstract: This publication collects and summarizes the specialized information needed to operate the ac-dc difference laboratory and calibration service at NIST (Gaithersburg). It also serves as a convenient reference source for the users of this calibration service and other interested people by documenting the service and its underlying background in considerable detail. It contains the following: an annotated table of contents, a topical index, and a glossary of common ac-dc acronyms; an overview of the service; selected published papers; instructions for the operation of the comparator systems; a schedule for the recalibration and periodic checks of the NIST thermal converters; and a sample report of calibration.
Date: May 1989
Creator: Kinard, J. R.; Hastings, J. R.; Lipe, T. E. & Childers, C. B.
open access

Accelerating polarized beams in Tevatron

Description: In this paper, we will examine the totality of equipment, manpower and cost necessary to obtain a polarized proton beam in the Tevatron. We will not, however, be concerned with the acquisition and acceleration of polarized /bar p/ beams. Furthermore we will consider only a planar main ring without overpass, although it is expected that Siberian snake schemes could be made to apply equally well to non-planar machines. In addition to not wanting to tackle here the task of reformulating the theory for a non-planar closed orbit, we also anticipate that as part of the Tevatron upgrade the main ring will in the not too distant future, be replaced by a planar main injector situated in a separate tunnel. 4 refs., 11 figs., 1 tab.
Date: February 1, 1989
Creator: Teng, L.C.
open access

Action Description Memorandum for the FY 1989 Line Item: Environmental, Safety and Health Upgrades, Phase 2

Description: This ADM documents the evaluation of the potential environmental impact hazards from the Environmental, Safety and Health Upgrades, Phase 2, project. Environmental, Safety and Health Upgrades, Phase 2, project is a $6,500,000 Line Item project for FY 1989. ES and H Phase 2, is a portion of a continuing effort to protect the environment, neighbors and employees from any adverse effects caused by the development and production missions of EG and G Mound Applied Technologies. The three parts of ES and H Phase 2 include: (A) new piping to separate potable water from domestic and process water; (B) improvements in explosive storage facilities; and (C) upgrades of the fuel oil storage systems, including a new tank, the containment basin, and dike.
Date: March 1, 1989
Creator: Adams, Frank S.; Hunter, Michael R. & Anderson, Carol R.