UNT Libraries Government Documents Department - 1,007 Matching Results

Search Results

Primary view of D-0 End Calorimeter Warm Tube/TeV Dry Air Purge
Leibfritz, J. R.
August 14, 1991
Primary view of 45-Day safety screen results for single shell tank 241-AP-106, liquid grab samples, riser 1, 30{degrees} and 150{degrees} in conjunction with evaporator campaign 95-1
Miller, G. L.
December 14, 1994
Primary view of 105-KE basin pilot run relocation
Crystal, J. B.
October 14, 1994
Primary view of 105-KE Isolation Barrier Leak Rate Acceptance Test Report
McCracken, K. J.
June 14, 1995
Primary view of A 250-GHz CARM (Cyclotron Auto Resonance Maser) oscillator experiment driven by an induction linac
Caplan, M.; Kulke, B.; Bubp, D.G. (Lawrence Livermore National Lab., CA (USA)); McDermott, D. & Luhmann, N. (California Univ., Los Angeles, CA (USA))
September 14, 1990
Primary view of 300 Degree C GaN/AlGaN Heterojunction Bipolar Transistor
Abernathy, C. R.; Baca, A. G.; Cho, H.; Chow, P. P.; Han, J.; Hichman, R. A. et al.
October 14, 1998
Primary view of 105KE Basin Area Radiation Monitor System (ARMS) Acceptance Test Procedure
Kinkel, C. C.
December 14, 1999
Primary view of 2000 Census: Contingency Planning Needed to Address Risks That Pose a Threat to a Successful Census
United States. General Accounting Office.
December 14, 1999
Primary view of 2727-S Nonradioactive Dangerous Waste Storage Facility clean closure evaluation report
Luke, S. N.
July 14, 1994
Primary view of 3D visualization of port simulation.
Horsthemke, W. H.; Macal, C. M. & Nevins, M. R.
June 14, 1999
Primary view of 50x50 GeV Muon Collider Beam Collimation
Drozhdin, A. I.; Johnstone, C. J.; Mokhov, N. V.; Garen, A. A. & Biryukov, V. M.
April 14, 1999
Primary view of ABC Technology Development Program
unknown creator
October 14, 1994
Primary view of Abstracted model for ceramic coating
Farmer, J C & Stockman, C
November 14, 1998
Primary view of Acceptable Knowledge Summary Report for Waste Stream: SR-T001-221F-HET/Drums
Lunsford, G. F.
June 14, 1999
Primary view of Acceptance/operational test report for tank 241-AW-101 camera and camera purge control system
Harding, R.A., Westinghouse Hanford
August 14, 1996
Primary view of Acceptance test plan for the Waste Information Control System
Flynn, D. F.
September 14, 1994
Primary view of Acceptance test report for the ultra high pressure bore head for use in the self-installing liquid observation well
Hertelendy, N.A.
June 14, 1995
Primary view of Accounting Standards: Treatment of Asset-Backed Securities
United States. General Accounting Office.
April 14, 1999
Primary view of Acquisition Reform: Review of Selected Best-Value Contracts
United States. General Accounting Office.
April 14, 1999
Primary view of Addendum 6 to CSAR 79-038 out-of-hood plutonium storage (burial box)
Chiao, T.
June 14, 1995
Primary view of Additional information for impact response of the restart safety rods
Yau, W. W. F.
October 14, 1991
Primary view of Additional information for impact response of the restart safety rods
Yau, W.W.F.
October 14, 1991
Primary view of Additional Interface Corner Toughness Data for an Adhesively-Bonded Butt Joint
Guess, T.R. & Reedy, E.D.
April 14, 1999
Primary view of Adjustment of the (235)U Fission Spectrum
GRIFFIN,PATRICK J. & WILLIAMS,J.G.
September 14, 1999