UNT Libraries Government Documents Department - Browse

ABOUT BROWSE FEED
Primary view of 1.1-meter bore, 8-Tesla test facility
Nelson, R.; Cornish, D.; Zbasnik, J.; Sackett, S. & Taylor, C.
November 19, 1975
Primary view of 1.06 μm 150 psec laser damage study of diamond turned, diamond turned/ polished and polished metal mirrors
Saito, T. T.; Milam, D.; Baker, P. & Murphy, G.
July 24, 1975
Primary view of 4-inch sample recovery canisters, Test Model D series. Final report, September 1969--May 1970
Goode, P. L. & Neff, G. W.
1970
Primary view of 4$pi$ detector for correlation experiments
Thorndike, A. M.
June 12, 1975
Primary view of 5 kWe reactor power distributions
Bost, D.S.
June 26, 1972
Primary view of 5 kWe reactor T/E unmanned system test
Beoletto, J.A.
September 19, 1972
Primary view of 5 kWe reactor TE reflector sector drive actuator design summary
Donelan, L.E.
October 1, 1972
Primary view of 14'' x 17'' film recorder for computer-enhanced scans
Morris, A. C., Jr.; Barclay, T. R.; Akin, T. E.; Hansard, M. C.; Gibbs, W. D. & Modzelewski, C. U.
January 1, 1976
Primary view of 15-foot bubble chamber characteristics
Huson, F. R.
September 15, 1975
Primary view of 15 MeV neutron damage in Cu and Nb
Roberto, J. B.; Narayan, J. & Saltmarsh, M. J.
January 1, 1975
Primary view of 19 mm ballistic range: a potpourri of techniques and recipes
Carpluk, G.T.
September 23, 1975
Primary view of 40-MW(E) PROTOTYPE HIGH-TEMPERATURE GAS-COOLED REACTOR POSTCONSTRUCTION RESEARCH AND DEVELOPMENT PROGRAM. Quarterly Progress Report for the Period Ending April 30, 1970.
unknown creator
January 1, 1970
Primary view of 40-MW(e) PROTOTYPE HIGH-TEMPERATURE GAS-COOLED REACTOR POSTCONSTRUCTION RESEARCH AND DEVELOPMENT PROGRAM. Quarterly Progress Report for the Period Ending July 31, 1970.
unknown creator
January 1, 1970
Primary view of 40-MW(E) PROTOTYPE HIGH-TEMPERATURE GAS-COOLED REACTOR POSTCONSTRUCTION RESEARCH AND DEVELOPMENT PROGRAM. Quarterly Progress Report for the Period Ending October 31, 1970.
unknown creator
January 1, 1970
Primary view of 100 mg $sup 251$Cf activation analysis facility at the Savannah River Laboratory
MacMurdo, K.W. & Bowman, W.W.
January 1, 1975
Primary view of 100-MHz power amplifier design and control for a heavy-ion accelerator
Lunsford, J. S.; Shipley, J. P. & Sutton, J.
July 1975
Primary view of 120 kA pulsed dc power system with computerized thyristor triggering
Mosko, S.W.; Bates, D.D.; Bigelow, R.R.; Cottongim, E.K.; Pipes, E.W. & Sueker, K.
January 1, 1975
Primary view of 150 MeV proton medical cyclotron design study
Burleigh, R. J.; Clark, D. J. & Flood, W. S.
August 1975
Primary view of 200-GeV proton-proton elastic scattering at high transverse momentum
Ratner, L.G.; /Argonne; Krisch, A.D.; Roberts, J.B.; Terwilliger, K.M. & U., /Michigan
June 1, 1970
Primary view of 200 kW, 800 MHz transmitter system for lower hybrid heating
Deitz, A.
January 1, 1975
Primary view of THE 200 MHZ NUCLEAR MAGNETIC RESONANCE ANALYSIS AND THE SELECTIVEDEUTERODEPROTONATION OF BENZO [a]PYRENE AND 6-METHYLBENZ0[a]PYRENE.PROBA BLE ACTIVE INTERMEDIATES IN CANCER INDUCTION
Cavalieri, E. & Calvin, M.
August 1, 1970
Primary view of A 218 neutron group master cross section library for criticality safety studies
Ford, W.E. III; Westfall, R.M. & Webster, C.C.
January 1, 1975
Primary view of 300 kWt core conceptual model thermal/hydraulic characteristics
Moody, E.
July 27, 1971
Primary view of 325-B FACILITY
unknown creator
February 1, 1971