UNT Libraries Government Documents Department - 13,536 Matching Results

Search Results

Primary view of 1. Summary of Runs, s56, 57, 73, 74, 78, 79, 80, 87, 88, 89 in Which Slurries Circulated at 300 C in 100-a Loops Caked or Accumulated on Pipe Walls. 2. Summary of Runs T-52 Through T-75 in Which a Bypass Line Was Used in Parallel With Main Circulating Loop
Kitzes, A.S.; Gallaher, R.B.; McLaughlin, C.A. & Wichner, R.P.
November 16, 1956
Primary view of 4-Channel Line Driver: Modified
Titterton, E. W.
1950?
Primary view of THE (5-PHENYL-2-OXAZOLYL)PYRIDINES AS FLUORESCENT pH INDICATORS. AN APPLICATION TO CHEMICAL RADIATION DOSIMETRY
Ott, D.G.
August 1, 1958
Primary view of 7 questions to ask when you buy or sell shelled corn by grade.
United States. Extension Service.
February 1952
Primary view of An 8-foot axisymmetrical fixed nozzle for subsonic Mach numbers up to 0.99 and for a supersonic Mach number of 1.2
Ritchie, Virgil S.; Wright, Ray H. & Tulin, Marshall P.
February 23, 1950
Primary view of 10-MEGAWATT AQUEOUS HOMOGENEOUS CIRCULATING SOLUTION REACTOR FOR PRODUCING ELECTRICAL POWER IN REMOTE LOCATIONS
Montgomery, D.W.; Dodson, W.J.; Kaiser, F.F.; Luckow, W.K. & Pashos, T.J.
August 1, 1953
Primary view of 10 MWe Sodium Deuterium Reactor Design Report
Davis, Peter J.
1959
Primary view of 11,400 KW Nuclear Power Plant Employing an Organic Moderated Reactor: Preliminary Description
Wheelock, C. W.
1957
Primary view of 15 MW Gas-Cooled Closed-Cycle Reactor Power System Study: Final Report, Volumes 1-2
unknown creator
April 1, 1957
Primary view of 20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission
Gilbert Associates, Inc.
July 7, 1957
Primary view of 20-MW D$sub 2$O-MODERATED EXPERIMENTAL BOILING WATER REACTOR DESIGN STUDIES
Iskenderian, H.P.
February 1, 1957
Primary view of 25 PROCESS ASSISTANCE FOR PERIOD OF MARCH 21, 1955 TO APRIL 1, 1955
Culler, F.L.
April 11, 1955
Primary view of 25 PROCESS ASSISTANCE. For Period of May 2, 1955 to May 13, 1955
Culler, F L
May 23, 1955
Primary view of 30 Rv. Power Supply
U.S. Atomic Energy Commission
1950?
Primary view of 50-CHANNEL PULSE-HEIGHT ANALYZER ACCELERATOR TYPE. MAINTENANCE MANUAL
Heller, R.E.
December 15, 1953
Primary view of AN 80 MEGAWATT AQUEOUS HOMOGENEOUS BURNER REACTOR. Reactor Design and Feasibility Problem
Chapman, R.H.; Collins, H.L.; Dollard, W.J.; Fieno, D.; Hernandez- Fragoso, J.; Miller, J.W. et al.
August 1, 1957
Primary view of 100 Areas technical activities report - physics, July 1951
unknown creator
August 3, 1951
Primary view of 100-K water plant facilities data for G.E. scoping
Patterson, R.K.
August 8, 1952
Primary view of 100-Mw Nuclear Power Plant Utilizing a Sodium Cooled, Graphite Moderated Reactor
unknown creator
February 28, 1958
Primary view of 234-5 Building RM line equipment tests, Task III mixer
Collins, P. E.
April 10, 1952
Primary view of 234-5 Development Group - summary report, use of {open_quotes}AT{close_quotes} solution without evaporation
Lyon, W.L. & Facer, J.F.
September 1, 1950
Primary view of 234-5 Development summary report: Recovery of plutonium from skulls
Lyon, W.L. & Facer, J.F.
October 12, 1950
Primary view of 450-Mev/c K$sup -$ AND /anti p/ BEAMS AT THE NORTHWEST TARGET AREA OF THE BEVATRON SEPARATED BY THE COAXIAL VELOCITY SPECTROMETER
Horwitz, N.; Murray, J.J.; Ross, R.R. & Tripp, R.D.
June 1, 1958
Primary view of 600 MW FUSED SALT HOMOGENEOUS REACTOR POWER PLANT. Reactor Design and Feasibility Study
Davies, R.W.; Feener, D.H.; Frederick, W.A.; Goller, K.R.; Granet, I.; Schneider, G.R. et al.
August 1, 1956