UNT Libraries Government Documents Department - 6,445 Matching Results

Search Results

Primary view of 1/2 Creep Fracture in Ceramic Polycrystals I. Creep Cavitation Effects in Polycrystalline Alumina
Porter, J. R.; Blumenthal, W. & Evans, A. G.
September 1980
Primary view of 1/2 Sintering of Mullite-Containing Materials: I. Effect of Composition
Sacks, Michael D. & Pask, Joseph A.
December 1, 1981
Primary view of 2.0 K CEBAF Cryogenics
Arenius, Dana; Chronis, William; Kashy, David; Keesee, Marie & Rode, Claus
October 1, 1988
Primary view of 3-D computer simulations of EM field sin the APS vacuum chamber. Part 2: Time-domain analysis
Chou, W.
January 20, 1989
Primary view of 3 mm Anisotropy Measurement: On the Quadrupole Component in theCosmic Background Radiation
Lubin, Philip M.; Epstein, Gerald L. & Smoot, George F.
November 1, 1982
Primary view of 6 GeV light source project cost estimating procedure
unknown creator
October 23, 1985
Primary view of 6 GeV synchrotron x-ray source: Conceptual design report. Supplement A - characteristics of the insertion devices for the 6 GeV synchrotron source
unknown creator
March 1, 1986
Primary view of 7-GeV Advanced Photon Source : Conceptual Design Report
Argonne National Laboratory
April 1987
Primary view of 15 Mile Road/Edison Corridor Sewer Tunnel Failure Study, Detroit Area, Michigan
Albert, Dick
January 1981
Primary view of 17 wells: lithologic logs and temperature depth data
unknown creator
January 1, 1980
Primary view of 30 MJ superconducting magnetic energy storage stabilizing coil. Final report for construction
unknown creator
March 1, 1983
Primary view of 35 Years of Electron Scattering
Walecka, J.
October 1, 1986
Primary view of 90-Ton Triple Cylinder Jack Design
Jaques, Al
September 26, 1988
Primary view of 120 Degree Phase Advance\ Cell Lattice
Ruggiero, A. G.
December 6, 1983
Primary view of 209-E Upgrades
Merrill, B. J. & DeMyer, J. J.
February 4, 1985
Primary view of 350 MW(t) design fuel cycle selection. Revision 1
Lane, R. K.; Lefler, W. & Shirley, G.
January 1986
Primary view of A 360 YEAR TEMPERATURE AND PRECIPITATION RECORD FOR THE PASCO BASIN DERIVED FROM TREE-RING DATA
Cropper, J. P.; Fritts, H. C. & Foley, M. G.
August 1, 1986
Primary view of The 1980-1982 Geothermal Resource Assessment Program in Washington
Korosec, Michael A.; Phillips, William M. & Schuster, J.Eric
August 1, 1983
Primary view of The 1980 Annual Report
United States. Advisory Commission on Intergovernmental Relations.
May 1981
Primary view of 1981 annual industrial summary of fire and other property damage experience
unknown creator
February 1, 1982
Primary view of The 1981 Report
United States. Advisory Commission on Intergovernmental Relations.
May 1981
Primary view of 1982 THERMAL SHALLOW RESERVOIR TESTING
Mogen, P.; Pittinger, L. & Magers, M.
January 22, 1985
Primary view of The 1983 Temperature Gradient and Heat Flow Drilling Project for the State of Washington
Korosec, Michael A.
November 1, 1983
Primary view of 1985 Annual Site Environmental Report for Argonne National Laboratory
Golchert, N. W.; Duffy, T. L. & Sedlet, J.
March 1986