Search Results

Assessing Metadata Utilization: An Analysis of MARC Content Designation Use
This paper discusses metadata utilization. This paper reports results of an analysis of a large sample of MARC 21 bibliographic records.
Hunting and Gathering on the Information Savanna
In this book, the authors offer three different arenas of nontrivial information seeking for our consideration: "Submarine Chasing" explores the thoughts of a highly decorated Cold War submarine hunter. "Bounty Hunting" involves a long and convoluted search for a reported bond skipper. "Engineering Design" presents a content analysis of the few works in epistemological foundations of engineering design activity. These stories, told at great length and in considerable detail, are framed within a foundational model that links the simple act of document seeking to the broader issue of making one's way through life in the physical world. In each case, the authors ramble, mull, and stumble upon ideas without the least prior constraint, developing some threads quite fully and leaving others to tease us, but never ever throwing us to the lions.
Interim Report for the Z-Interop Project The Z39.50 Interoperability Testbed
This report discusses the Z39.50 interoperability testbed and serves as an interim report for the Z-Interop Project as of December 31, 2003.
Status Report to The Institute of Museum and Library Services January 1 through June 30, 2003
This document provides a status report on the Z39.50 Interoperability Testbed Project (Z-Interop) covering the period of January 1, 2003 through June 30, 2003. This document highlights activities and accomplishments to communicate to IMLS progress on this project since the last status report on January 1, 2003.
Status Report to The Institute of Museum and Library Services July 1 through December 31, 2002
This document provides a status report on the Z39.50 Interoperability Testbed Project (Z-Interop) covering the period of July 1, 2002 through December 31, 2002. The previous status report covered a three-month period from April 1, 2002 through June 30, 2002. This document highlights activities and accomplishments to communicate to IMLS progress on this project since the last status report.
Back to Top of Screen