Quality Assurance Tests: Release 1 Summary Test Results, June 2009
Description:
This report contains summaries of the results of two tests given as part of the IOGENE project. The IOGENE project involves genealogists in the design process of the redesigned Portal interface. The first test in this report was conducted from April 6 through April 9, 2009. The second test in this report was conducted from June 1 - June 4, 2009.
Date:
June 2009
Creator:
Murray, Kathleen R.
Item Type:
Refine your search to only
Report