Technical Report Archive & Image Library (TRAIL) - 12,715 Matching Results

This system will be undergoing maintenance April 18th between 9:00AM and 12:00PM CDT.

Search Results

Primary view of 0-2 kv Flash Tube Supplies
Miller, D. M.
March 15, 1962
Primary view of 1. K+ Charge Exchange - Search For K+ Charge Exchange
Birge, Robert W.; Courant, Hans J.; Lanou, Robert E., Jr. & Whitehead, Marian N.
July 29, 1959
Primary view of 3 Plant Radiation Study Interim Report #5- Part II Data on Gamma Shielding of Special Plutonium Samples
Moulthrop, H. A.
October 22, 1959
Primary view of 5.6 Mass Spectrographs
Evald, H. & Marschall, H.
unknown creation date
Primary view of 6.70 EV Resonance in U²³⁸
Levin, Jules S.
November 9, 1953
Primary view of The 6-Foot-4-Inch Wind Tunnel at the Washington Navy Yard
Desmond, G. L. & McCrary, J. A.
August 1935
Primary view of 6 kv Capacitor Charging Supply
Miller, D. M.
March 15, 1962
Primary view of An 8-Matrix Theory of the Vertex p - NN Based on the Strip Approximation
Sarkissian, M. Der
May 1964
Primary view of 9-ANGIE : a Two-Dimensional, Multigroup, Neutron-Diffusion-Theory Reactor Code for the IBM 709 or 7090
Stone, Stuart P.
October 28, 1960
Primary view of 9-Zoom : A One-Dimensional, Multigroup, Neutron Diffusion Theory Reactor Code for the IBM 709
Stone, S. P.; Collins, E. T. & Lenihan, S. R.
August 25, 1959
Primary view of 9-Zoom : A One-Dimensional, Multigroup, Neutron Diffusion Theory Reactor Code for the IBM 709 [Supplement]
Stone, S. P.
July 12, 1960
Primary view of 15 Mile Road/Edison Corridor Sewer Tunnel Failure Study, Detroit Area, Michigan
Albert, Dick; Hoff, George C.; Lorence, Brian; Mitchell, Gerald B.; Mlakar, Paul F.; Murphy, William L. et al.
January 1981
Primary view of 20-ton HE Cratering Experiments in Desert Alluvium: Final Report, May 1962
Vortman, Luke J. & MacDougall, H. R.
March 1960
Primary view of "25" Critically Consultation with J. W. Morfitt : April 3, 1950
Merrill, E. T. & Sege, G.
April 3, 1950
Primary view of A 37,500 KW Power Reactor with Competitive Possibilities
Thompson, W. I. & Cohen, Karl
February 26, 1954
Primary view of 80" Bubble Chamber Expansion System Preliminary Operating Procedures
Goodzeit, C. L.
January 7, 1964
Primary view of 80" Bubble Chamber Expansion System Summary of Piston Motion Studies
Goodzeit, C. L.
January 7, 1964
Primary view of 80" Chamber - Low Energy Beams
Rau, R. R.
January 3, 1964
Primary view of #85-Classical Model of a Light Source
Born, Max, 1882-1970
unknown creation date
Primary view of 100-N Decontamination Facility Design Guide.
Bainard, W. D.
March 8, 1960
Primary view of 100-Ton Test : Measurement of the Velocity of Sound
Barschall, H. H. & Martin, G.
June 15, 1945
Primary view of 327 Basin Aluminum Corrosion Test
Mallett, G. R.
February 9, 1956
Primary view of 568 Report
Pollard, Ernest C. (Ernest Charles), 1906-1997
1960
Primary view of 709 Program for Reduction of Exponential Pile Data
Matsumoto, D. D.
August 20, 1959
Back to Top of Screen