Search Results

open access

Research Continuation of Badger-Hickman Centrifugal Distallation Testing on Unit 4

Description: From Summary: "The work covered by this report includes a variety of subjects designed, generally, to test the utility of a centrifugal phase barrier as the boiler-condenser unit of a vapor recompression still for producing water from sea water."
Date: March 1957
Creator: Badger Manufacturing Company
Partner: UNT Libraries Government Documents Department
open access

Research on and Development of Badger-Hickman Centrifugal Distillation Techniques and Equipments

Description: From Summary: "Based upon the results of the investigations on both the No. 3 and No. 4 stills, engineering designs for a 25,000 g.p.d. unit were developed. Sketches of this design and a description of the process are presented in this report."
Date: December 1956
Creator: Badger Manufacturing Company
Partner: UNT Libraries Government Documents Department
open access

Design, Construction, Field Testing, and Cost Analysis of An Experimental Electrodialysis Demineralizer for Brackish Waters

Description: Rpeort describing the electrodialysis process as a possible practical means for demineralizing saline waters. The tests described in the report are used to determine the effects of operating the process under field conditions, to provide estimates of the cost of demineralizing brackish waters on a large scale, and as a means of planning further needed research in this field.
Date: December 1956
Creator: Dankese, J. P.; Kirkham, T. A.; Maheras, G.; Mintz, M. S.; Powell, J. H.; Rosenberg, N. W. et al.
Partner: UNT Libraries Government Documents Department
open access

Investigation of the Availability of Geothermal Energy for the Demineralization of Saline Water

Description: From Introduction: "The purpose of this investigation was to examine the question of the availability of geothermal energy and in particular the availability of geothermal energy from the Black Hills of South Dakota.
Date: July 1959
Creator: Research and Development Association. School of Mines.
Partner: UNT Libraries Government Documents Department
open access

Operation of Pilot Plant LTV Evaporator at Wrightsville Beach, North Carolina

Description: From Introduction: "The primary objective in the development of the W. L. Badger Long Tube Vertical Multiple Effect Evaporator for saline water conversion is to minimize the ultimate cost of producing potable water. To accomplish the primary objective, it is necessary to (1) prevent formation of scale on heating surfaces, and (2) minimize corrosion to permit use of inexpensive materials of construction. The work done leading to this report was guided in the direction of accomplishing the two se… more
Date: December 1959
Creator: W. L. Badger and Associates, Inc.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen