The purpose of this report is to present the results of a condition survey performed at Carswell Air Force Base (CAFB), Texas, during 16-19 December 1972. The two major areas of interest considered in this survey were the structural condition of the primary airfield pavements and the condition of pavement repairs and the types of maintenance materials that have been used at this airfield.
"This report contains a summary of construction of procedures and field observations made during and after construction of Benbrook Dam, a brief review of the original design data, and comparisons of design predictions with performance data" (p. 1). It is part of a series to compare field experience and performance of existing structures with design predictions.
From purpose and scope: The purpose of this report is to describe and explain the historical, seasonal, and areal variations in the water quality of Lake Arlington between January 29, 1973, and August 20, 1981.
This dialog allows you to filter your current search.
Each of the Serial/Series Titles listed note their name and the number of records that will be limited down to if you choose that option.
This dialog allows you to filter your current search.
Each of the Decades listed note their name and the number of records that will be limited down to if you choose that option.
This dialog allows you to filter your current search.
Each of the Years listed note their name and the number of records that will be limited down to if you choose that option.
This dialog allows you to filter your current search.
Each of the Months listed note their name and the number of records that will be limited down to if you choose that option.