Search Results

ABWR: PL-2 Design Report
From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1960
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1962
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile, low-power, nuclear power plant for Military field operation.
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1964
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1964
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Full Power and Limited Endurance Test of the ML-1 Nuclear Power Plant (ANSOP 16625A)
Report presenting "[t]he results of performance analyses of the ML-1 nuclear power plant based on the test data obtained during ANSOP 16625A" (p. v).
In-Pile Test of Prototype ML-1 Fuel Elements
Report documenting the testing of prototype fuel elements used in a mobile nuclear power plant. Includes descriptions and evaluations of the test.
Special Power Excursion Reactor Test III Pressurizer Vessel Failure
Report documenting results of a study of the cause of failure at the SPERT III reactor facility.
STEP Project Quarterly Technical Report: January-June 1964
Report regarding the Safety Test Engineering Program (STEP), the transient and destructive testing of the aerospace SNAP 10A/2 reactor, and the evaluation of the results of these tests.
Topic: a Fortran Program for Calculating Transport of Particles in Cylinders
Report discussing the use of TOPIC Sn computer code in the attempt to find a solution to the Boltzmann transport equation.
Back to Top of Screen