Search Results

Army Drawdown and Restructuring: Background and Issues for Congress
This report discusses the new defense strategy, which was unveiled by senior Department of Defense (DOD) leadership based on a review of potential future security challenges, current defense strategy, and budgetary constraints. This strategy will rebalance the Army's global posture and presence, emphasizing where potential problems are likely to arise, such as the Asia-Pacific region and the Middle East.
Army Drawdown and Restructuring: Background and Issues for Congress
This report discusses the new defense strategy, which was unveiled by senior Department of Defense (DOD) leadership based on a review of potential future security challenges, current defense strategy, and budgetary constraints. This strategy will rebalance the Army's global posture and presence, emphasizing where potential problems are likely to arise, such as the Asia-Pacific region and the Middle East.
Army Drawdown and Restructuring: Background and Issues for Congress
This is a report about Army Drwdown and Restructuring, specifically background and issues for congress.
Army Drawdown and Restructuring: Background and Issues for Congress
On January 26, 2012, senior DOD leadership unveiled a new defense strategy based on a review of potential future security challenges, current defense strategy, and budgetary constraints. This new strategy envisions a smaller, leaner Army that is agile, flexible, rapidly deployable, and technologically advanced. This strategy will rebalance the Army's global posture and presence, emphasizing where potential problems are likely to arise, such as the Asia-Pacific region and the Middle East. Potential issues for Congress include the strategic risk posed by a smaller and restructured Army; the "health" of the Army given the impending downsizing; where the force will be based; the role of the National Guard and Reserves; and should the enrollment at the service academies (West Point) be reduced to pre-9/11 levels. This report will be updated as circumstances warrant.
Army Drawdown and Restructuring: Background and Issues for Congress
This report discusses the new defense strategy, which was unveiled by senior Department of Defense (DOD) leadership based on a review of potential future security challenges, current defense strategy, and budgetary constraints. This strategy will rebalance the Army's global posture and presence, emphasizing where potential problems are likely to arise, such as the Asia-Pacific region and the Middle East.
Army Future Combat System (FCS) "Spin- Outs" and Ground Combat Vehicle (GCV): Background and Issues for Congress
This report discusses the Future Combat System (FCS), which was a multiyear, multibillion dollar program at the heart of the Army's transformation efforts.
Army Futures Command
This report discusses the Army Futures Command, a proposed central command focused on Army modernization efforts.
Army Futures Command (AFC)
This report summarizes the issue of development of major combat systems for the Army and the proposed solution: Army Futures Command. The report ends with possible issues for Congress to consider.
Army Officer Shortages: Background and Issues for Congress
This report assesses the extent of the Army officer shortfall, examines perceived causes, reviews recent retention initiatives, identifies other possible retention incentives, and concludes with a review of possible options for Congress. This report is focused on the Army’s “line” or basic branch officers.
The Army;s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report discusses the Army's Armored Multi-Purpose Vehicle (AMPV) program and outlines its basic functions, procurement plans, and funding requests for FY2019.
Army Transformation and Modernization: Overview and Issues for Congress
This report briefly describes the modernization program for the U.S. military forces and discusses issues of feasibility, viability, and affordability of potential interest to Congress.
Army Transformation and Modernization: Overview and Issues for Congress
The U.S. Army has begun an ambitious program intended to transform itself into a strategically responsive force dominant in all types of ground operations. As planned, its Objective Force will eventually meld all ongoing initiatives into a force based on a high-tech Future Combat System. This short report briefly describes the program and discusses issues of feasibility, viability, and affordability of potential interest to Congress.
Army Transformation and Modernization: Overview and Issues for Congress
The U.S. Army has begun an ambitious program intended to transform itself into a strategically responsive force dominant in all types of ground operations. As planned, its Objective Force will eventually meld all ongoing initiatives into a force based on a high-tech Future Combat System. This short report briefly describes the program and discusses issues of feasibility, viability, and affordability of potential interest to Congress.
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report discusses the Army's Armored Multi-Purpose Vehicle (AMPV) program and outlines its basic functions, procurement plans, and funding requests for FY2019.
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV), which is the Army's proposed replacement to the Vietnam-era M-113 personnel carriers.
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report discuses the development, procurement, and funding of the Army's new Multi-Purpose Vehicles (AMPV) intended to replace Vietnam War-era M-113 personnel carriers. The FY2018 budget request for the AMPV requests $647.4 million for the production of 107 vehicles. A potential issue for Congress is whether the Administration's proposal to increase the size of the Army will translate into a requirement for additional AMPVs.
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV), which is the Army's proposed replacement to the Vietnam-era M-113 personnel carriers.
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV), which is the Army's proposed replacement to the Vietnam-era M-113 personnel carriers.
The Army's Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress
This report provides background information on the Armored Multi-Purpose Vehicle (AMPV) and it discusses the Army's proposed replacement to the Vietnam-era M-113 personnel carriers, which are still in service in a variety of support capacities in Armored Brigade Combat Teams (ABCTs).
The Army's Future Combat System (FCS): Background and Issues for Congress
This report describes the Future Combat System (FCS) program, which was to be the Army's major research, development, and acquisition program consisting of 14 manned and unmanned systems linked by an extensive communications and information network. This report describes the proposed restructuring of the FCS program, announced by Secretary of Defense Gates in April 2009, which includes modernizing outdated equipment and re-evaluating vehicle design strategy. This report will be superseded by a report on the Army's BCT (Brigade Combat Team) Modernization Strategy when sufficient details are available.
The Army’s Future Combat System (FCS): Background and Issues for Congress
This report contains background and issues for congress on the army's Future Combat System (FCS). It further discusses about FCS Program timeline and FCS Program Budget Issues.
The Army’s Future Combat System (FCS): Background and Issues for Congress
This content contains the background and issues for congress on the army's Future Combat System (FCS).
The Army's Future Combat System (FCS): Background and Issues for Congress
This report describes the Future Combat System (FCS) program, which was to be the Army's major research, development, and acquisition program consisting of 14 manned and unmanned systems linked by an extensive communications and information network. This report describes the proposed restructuring of the FCS program, which includes modernizing outdated equipment and re-evaluating vehicle design strategy. This report will be superseded by a report on the Army's BCT (Brigade Combat Team) Modernization Strategy when sufficient details are available.
The Army's Future Combat System (FCS): Background and Issues for Congress
This report describes the Future Combat System (FCS) program, which was to be the Army's major research, development, and acquisition program consisting of 14 manned and unmanned systems linked by an extensive communications and information network.
The Army's Future Combat System (FCS): Background and Issues for Congress
This report describes the Future Combat System (FCS) program, which was to be the Army's major research, development, and acquisition program consisting of 14 manned and unmanned systems linked by an extensive communications and information network. This report describes the proposed restructuring of the FCS program, announced by Secretary of Defense Gates in April 2009, which includes modernizing outdated equipment and re-evaluating vehicle design strategy.
The Army's Future Combat System (FCS): Background and Issues for Congress
This report describes the Future Combat System (FCS) program, which was to be the Army's major research, development, and acquisition program consisting of 14 manned and unmanned systems linked by an extensive communications and information network.
The Army's Future Combat System (FCS): Background and Issues for Congress
The Future Combat System (FCS) is the U.S. Army’s multiyear, multibillion dollar program at the heart of the Army’s transformation efforts. The FCS program exists in a dynamic national security environment which could significantly influence the program’s outcome. The FCS is experiencing a number of program development issues - with some technologies advancing quicker than anticipated, others progressing along predicted lines, while still others not meeting the Army’s expectations. Congress, in its authorization, appropriation, and oversight roles may wish to review the FCS program in terms of its capabilities and program costs.
The Army's Future Combat System (FCS): Background and Issues for Congress
The Future Combat System (FCS) is the U.S. Army’s multiyear, multibillion dollar program at the heart of the Army’s transformation efforts. The FCS program exists in a dynamic national security environment which could significantly influence the program’s outcome. The FCS is experiencing a number of program development issues - with some technologies advancing quicker than anticipated, others progressing along predicted lines, while still others not meeting the Army’s expectations. Congress, in its authorization, appropriation, and oversight roles may wish to review the FCS program in terms of its capabilities and program costs.
The Army's Ground Combat Vehicle (GCV) and Early Infantry Brigade Combat Team (E-IBCT) Programs: Background and Issues for Congress
Report that looks at budget requests for the Army's Future Combat System (FCS) program, Ground Combat Vehicle (GCV) program, and brigade combat teams (BCTs). It ends with a discussion of potential issues for Congress.
The Army’s Ground Combat Vehicle (GCV) and Early Infantry Brigade Combat Team (E-IBCT) Programs: Background and Issues for Congress
No Description Available.
The Army's Ground Combat Vehicle (GCV) and Early Infantry Brigade Combat Team (E-IBCT) Programs: Background and Issues for Congress
This report looks at budget requests for the Army's Future Combat System (FCS) program, Ground Combat Vehicle (GCV) program, and brigade combat teams (BCTs). It ends with a discussion of potential issues for Congress.
The Army's Ground Combat Vehicle (GCV) and Early Infantry Brigade Combat Team (E-IBCT) Programs: Background and Issues for Congress
This report looks at budget requests for the Army's Future Combat System (FCS) program, Ground Combat Vehicle (GCV) program, and brigade combat teams (BCTs). It ends with a discussion of potential issues for Congress.
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
This report looks at the history and current need for a Ground Combat Vehicle (GCV) program. Potential issues for Congress include the role of the GCV and the need for the program in a downsized Army that will likely have fewer heavy brigade combat teams (HBCTs).
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
Report that looks at the history and current need for a Ground Combat Vehicle (GCV) program. Potential issues for Congress include the role and need for the GCV in a downsized Army that will likely have fewer heavy brigade combat teams (HBCTs).
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
This report looks at the history and current need for a Ground Combat Vehicle (GCV) program. Potential issues for Congress include the role and need for the GCV in a downsized Army that will likely have fewer heavy brigade combat teams (HBCTs).
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
This report examines the history and current need for a Ground Combat Vehicle (GCV) program. Potential issues for Congress include the role and need for the GCV in a downsized Army that will likely have fewer heavy brigade combat teams (HBCTs).
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
This report looks at the history and current need for a Ground Combat Vehicle (GCV) program. The report discusses potential issues for Congress include the role and need for the GCV in a downsized Army that will likely have fewer heavy brigade combat teams (HBCTs).
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
This report looks at the history and current need for a Ground Combat Vehicle (GCV) program, potential issues for Congress that include the role and need for the GCV in a downsized Army that will likely have fewer heavy brigade combat teams (HBCTs).
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
This report looks at the history and current need for a Ground Combat Vehicle (GCV) program. Potential issues for Congress include the role and need for the GCV in a downsized Army that will likely have fewer heavy brigade combat teams (HBCTs).
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
This report looks at the history and current need for a Ground Combat Vehicle (GCV) program. Potential issues for Congress include the role and need for the GCV in a downsized Army that will likely have fewer heavy brigade combat teams (HBCTs).
The Army's M-1 Abrams, M-2/M-3 Bradley, and M-1126 Stryker: Background and Issues for Congress
This report discusses various issues surrounding the M-1 Abrams Tank, the M-2/M-3 Bradley Fighting Vehicle (BFV), and the M-1126 Stryker Combat Vehicle, centerpieces of the Army's Armored Brigade Combat Teams (ABCTs) and Stryker Brigade Combat Teams (SBCTs).
Back to Top of Screen