PEP-II, the SLAC, LBNL, LLNL B-Factory was designed and optimized to run at the Upsilon 4S resonance (10.580 GeV with an 8.973 GeV e- beam and a 3.119 GeV e+ beam). The interaction region (IR) used permanent magnet dipoles to bring the beams into a head-on collision. The first focusing element for both beams was also a permanent magnet. The IR geometry, masking, beam orbits and beam pipe apertures were designed for 4S running. Even though PEP-II was optimized for the 4S, we successfully changed the center-of-mass energy (E{sub cm}) down to the Upsilon 2S resonance and completed an E{sub ... continued below

Physical Description

3 pages

Creation Information

Sullivan, M; Bertsche, K.; Novokhatski, A.; Seeman, J.; Wienands, U. & /SLAC May 20, 2009.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

PEP-II, the SLAC, LBNL, LLNL B-Factory was designed and optimized to run at the Upsilon 4S resonance (10.580 GeV with an 8.973 GeV e- beam and a 3.119 GeV e+ beam). The interaction region (IR) used permanent magnet dipoles to bring the beams into a head-on collision. The first focusing element for both beams was also a permanent magnet. The IR geometry, masking, beam orbits and beam pipe apertures were designed for 4S running. Even though PEP-II was optimized for the 4S, we successfully changed the center-of-mass energy (E{sub cm}) down to the Upsilon 2S resonance and completed an E{sub cm} scan from the 4S resonance up to 11.2 GeV. The luminosity throughout most of these changes remained near 1 x 10{sup 34} cm{sup -2}s{sup -1}. The E{sub cm} was changed by moving the energy of the high-energy beam (HEB). The beam energy differed by more than 20% which produced significantly different running conditions for the RF system. The energy loss per turn changed 2.5 times over this range. We describe how the beam energy was changed and discuss some of the consequences for the beam orbit in the interaction region. We also describe some of the RF issues that arose and how we solved them as the high-current HEB energy changed.

Physical Description

3 pages

Source

  • Contributed to Particle Accelerator Conference (PAC 09), Vancouver, BC, Canada, 4-8 May 2009

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Report No.: SLAC-PUB-13635
  • Grant Number: AC02-76SF00515
  • Office of Scientific & Technical Information Report Number: 952969
  • Archival Resource Key: ark:/67531/metadc933010

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • May 20, 2009

Added to The UNT Digital Library

  • Nov. 13, 2016, 7:26 p.m.

Description Last Updated

  • Dec. 15, 2016, 3:22 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Sullivan, M; Bertsche, K.; Novokhatski, A.; Seeman, J.; Wienands, U. & /SLAC. Changing the PEP-II Center-of-Mass Energy Down to 10 GeV and up to 11 GeV, article, May 20, 2009; United States. (digital.library.unt.edu/ark:/67531/metadc933010/: accessed December 18, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.