General technical requirements (GTR) for inventory monitoring systems (IMS) for the trilateral initiative

PDF Version Also Available for Download.

Description

Pursuant to the Trilateral Initiative, the three parties (The Russian Federation, the United States, and the International Atomic Energy Agency) have been engaged in discussions concerning the structure of reliable monitoring systems for storage facilities having large inventories. The intent of these monitoring systems is to provide the capability for the IAEA to maintain continuity of knowledge in a sufficiently reliable manner that should there be equipment failure, loss of continuity of knowledge would be restricted to a small population of the inventory, and thus reinventory of the stored items would be minimized These facility-specific monitoring systems, referred to as ... continued below

Physical Description

7 p.

Creation Information

Pshakin, Gennady M.; Kuleshov, I. (Igor); Shea, T.; Puckett, J. M. (John M.); Zhukov, I.; Mangan, Dennis L. et al. January 1, 2002.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

Pursuant to the Trilateral Initiative, the three parties (The Russian Federation, the United States, and the International Atomic Energy Agency) have been engaged in discussions concerning the structure of reliable monitoring systems for storage facilities having large inventories. The intent of these monitoring systems is to provide the capability for the IAEA to maintain continuity of knowledge in a sufficiently reliable manner that should there be equipment failure, loss of continuity of knowledge would be restricted to a small population of the inventory, and thus reinventory of the stored items would be minimized These facility-specific monitoring systems, referred to as Inventory Monitoring Systems (IMS) are to provide the principal means for the M A to assure that the containers of fissile material remain accounted under the Verification Agreements which are to be concluded between the IAEA and the Russian Federation and the lAEA and the United States for the verification of weapon-origin and other fissile material specified by each State as released from its defense programs. A technical experts working group for inventory monitoring systems has been meeting since Feb- of 2000 to formulate General Technical Requirements (GTR) for Inventory Monitoring Systems for the Trilateral Initiative. Although provisional agreement has been reached by the three parties concerning the GTR, it is considered a living document that can be updated as warranted by the three parties. This paper provides a summary of the GTR as it currently exists.

Physical Description

7 p.

Source

  • Submitted to: 42nd Annual INMM Meeting, Indian Wells, CA, July 15-19, 2001

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Report No.: LA-UR-02-0149
  • Report No.: LA-UR-02-149
  • Grant Number: none
  • Office of Scientific & Technical Information Report Number: 975938
  • Archival Resource Key: ark:/67531/metadc927949

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • January 1, 2002

Added to The UNT Digital Library

  • Nov. 13, 2016, 7:26 p.m.

Description Last Updated

  • Dec. 9, 2016, 11:37 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 4

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Pshakin, Gennady M.; Kuleshov, I. (Igor); Shea, T.; Puckett, J. M. (John M.); Zhukov, I.; Mangan, Dennis L. et al. General technical requirements (GTR) for inventory monitoring systems (IMS) for the trilateral initiative, article, January 1, 2002; United States. (digital.library.unt.edu/ark:/67531/metadc927949/: accessed December 13, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.