The lithium lens in the antiproton source target vault is protected by an interlock system, which is located in relay racks R5 and R6 near the southwest corner of the Target Hall (building APO). The interlock system consists of crates of commercial signal conditioner and alarm modules built by Acromag, Inc and interlock Master Modules built by Fermilab: Twenty analog signals from the lens/transformer, power supply, and cooling water system are buffered with signal conditioners (amplifiers), which are located in creates R5C and R5E. The signals and conditioner assignments are listed in Table 1. Interconnection details are shown in Figure ... continued below

Creation Information

Krider, J. December 18, 1985.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The lithium lens in the antiproton source target vault is protected by an interlock system, which is located in relay racks R5 and R6 near the southwest corner of the Target Hall (building APO). The interlock system consists of crates of commercial signal conditioner and alarm modules built by Acromag, Inc and interlock Master Modules built by Fermilab: Twenty analog signals from the lens/transformer, power supply, and cooling water system are buffered with signal conditioners (amplifiers), which are located in creates R5C and R5E. The signals and conditioner assignments are listed in Table 1. Interconnection details are shown in Figure 1. Thermocouple signals come into the conditioners directly from the vault or water system via 12-pair multiconductor thermocouple extension cables. All other signals pass through a master connection panel on the east end of rack R6. Water flow signals are AC voltages which must be converted by electronics in crate D2B to DC voltages before entering their signal conditioners. Each conditioner drives two parallel outputs. One output goes to a Multiplexed Analog to Digital Converter (MADC 25), which is located in R5D. This voltage output is read by the accelerator control network (ACNET) and can be displayed at any control console on parameter page P46. The other voltage output is connected to an alarm module. Thirteen analog signals are processed by alarm modules, which are located in crates R6B and R6C. Alarm connection details are shown in Figure 2. Each alarm module contains two DPDT relays, one for an upper limit and one for a lower limit. The relays are latching, so that once an input has passed outside a limit, that limit relay remains in the tripped condition until an operator issues a reset pulse. The reset may be generated locally with a pushbutton on the appropriate interlock master module or remotely from controls parameter page P46 via ACNET. Alarm settings are summarized in engineering units in Table 1, and actual comparitor voltage settings are listed in Figure 2. Each alarm crate contains 10 module slots and is wired as shown in Figure 3, except for the water conductivity slot, which is wired to a separate interlock chain output. Normally open contacts are used for interlock chains, while normally closed contacts provide status bits. The interlock chain outputs are connected to Interlock Master Modules located in D5C. Status bits are read into ACNET through a multiplexer in R4A, and can be displayed on parameter page S40. Any alarm slot may be bypassed by inserting a 'dummy' printed circuit card in place of a module. Each interlock master module sums 5 inputs and provides 3 reed relay contact closure outputs. A circuit schematic is shown in Figure 4. Input 1 requires +5 volts, and directly energizes an interlock chain relay. Input 2 and 3 require TTL logic levels, and inputs 4 and 5 require and external contact closure. Internal switches select which inputs are active Interlock master interconnections are shown in Figure 5. The lens uses two masters, one for water conductivity and the other for all interlocked conditions. The Conductivity Master controls the lens water purging system and also energizes one input of the General Master. The General Master provides the external interlock for the pulsed power supply. If lithium comes into contact with the cooling water, the conductivity master will trip. Output 2 of the Master shuts off the water circulating pump and initiates purging hardware, which isolates the lens from the water supply and allows inert gas to force remaining water from the lens into a reservoir located in the vault. Output 1 of the Master, which is connected to input 4 of the lens General Master, causes the General Master to trip and disable the pulsed power supply. All other lens alarm conditions (except conductivity) enter input 1 and 2 of the Lens General Master. An alarm condition from these inputs will disable the pulsed power supply, but the water system will remain on. Each interlock master has a manual Emergency Stop pushbutton (red) on its front panel. The pushbutton has alternating action, one push enabling the interlock master, the next push opening the interlock chain. all interlock masters are connected to an audible trip alarm module located in R5E-6.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: FERMILAB-PBAR-NOTE-443
  • Grant Number: AC02-07CH11359
  • DOI: 10.2172/948901 | External Link
  • Office of Scientific & Technical Information Report Number: 948901
  • Archival Resource Key: ark:/67531/metadc926838

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • December 18, 1985

Added to The UNT Digital Library

  • Nov. 13, 2016, 7:26 p.m.

Description Last Updated

  • Dec. 6, 2016, 12:32 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 4

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Krider, J. Lithium Lens Interlocks, report, December 18, 1985; Batavia, Illinois. (digital.library.unt.edu/ark:/67531/metadc926838/: accessed July 16, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.