Implementation of the MPC and A Operations Monitoring (MOM) System at IRT-T FSRE Nuclear Power Institute (NPI) Page: 4 of 7
This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
PPS Lab
Main Entrance (SNM Portal) 2.1
CAS
Generator Room
Main Entrance Gate 2.4
g Emergency Exit #1
Emergency Exit #2
Emergency Exit #3 4 -.
(3,d FRoor)
Cargo Transfer Area 4.4
PRIMARY
Data Collection/Review Station
Cat-5
g1111. -rREACTOR BUILDING
SNM St
11 S
GEMINI-N GEMINI-N 1.2
#2 #1 13
14 S
Reactor
GEMINI-N 3.1C
#4
4 GEMINI-N 3.2T
0 #3
3.4 C
0i SECONDARY
0 Review Station
Ethernet
Switch 0000000
4- - Cat-5 0000000
Chief Engineer
IRT-T Reactor~ 30km from IRT-T
NPI
TERTIARY
Review Station
m
Director of Institue
Figure 1: Schematic of the MOM System at IRT-T FSRE "NPI"
MPC&A SYSTEM MONITORING STRATEGY AT IRT-T FSRE "NPI"
System 1
As indicated in Figure 1, three of the cameras in System 1 (cameras 1.1 - 1.3) are located in or
nearby the fresh fuel storage vault. The fourth camera (camera 1.4) is located in the stairway in
the immediate proximity of the vault. Cameras 1.1 through 1.4 verify that two-person access is
being adhered to. Camera 1.2 remotely triggers camera 3.4. Cameras 1.1 and 1.2 also verify
that the two-person rule inside the fresh fuel vault is being followed. In addition, cameras 1.1
and 1.2 are used to monitor activity associated with physical inventory taking (PIT) and daily
administrative checks (DACs). Cameras 1.3 and 1.4 are also used to monitor material
movement in the storage entry and stairway. Camera 1.3 remotely triggers camera 1.4.rage
storage Vault #1
torage Vault #2
torage Vault Entrance
tairs outside SNM Vault Area
Area
ontrol Room
op of Reactor
pent Fuel Hatch
ontrol Room-to-Reactor Hall
Upcoming Pages
Here’s what’s next.
Search Inside
This article can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Article.
Sitdikov, Igor; Zenkov, Andrey; Tsibulnikov, Yuri; Duncan, Cristen; Brownell, Lorilee; Pratt, William T. et al. Implementation of the MPC and A Operations Monitoring (MOM) System at IRT-T FSRE Nuclear Power Institute (NPI), article, July 13, 2008; United States. (https://digital.library.unt.edu/ark:/67531/metadc902689/m1/4/: accessed March 29, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.