Instrumentation Needs for Integral Primary System Reactors (IPSRs) - Task 1 Final Report Page: 2 of 137
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
LEGAL NOTICE
This report was prepared by Westinghouse Electric Company LLC.
Neither Westinghouse Electric Company LLC, nor any person acting on
its behalf:
A. Makes any warranty or representation, express or implied
including the warranties of fitness for a particular purpose or
merchantability, with respect to the accuracy, completeness, or
usefulness of the information contained in this report, or that the
use of any information, apparatus, method, or process disclosed in
this report may not infringe privately owned rights; or
B. Assumes any liabilities with respect to the use of, or for damages
resulting from the use of, any information, apparatus, method, or
process disclosed in this report.
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Storrick, Gary D.; Petrovic, Bojan; Oriani, Luca; Conway, Lawrence E. & Conti, Diego. Instrumentation Needs for Integral Primary System Reactors (IPSRs) - Task 1 Final Report, report, September 30, 2005; United States. (https://digital.library.unt.edu/ark:/67531/metadc902248/m1/2/: accessed April 25, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.