Preliminary Design Report for the Yakima/Klickitat Production Project; Executive Summary.

PDF Version Also Available for Download.

Description

A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Agreement on a refined statement of project goals. Completion of a technical analysis of water supplies. Completion of an experimental design plan. Development of a harvest management plan. Assessment of potential genetic risks. Project coordination with all other affected parties. ... continued below

Physical Description

22 pages

Creation Information

United States. Bonneville Power Administration. March 1, 1990.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Agreement on a refined statement of project goals. Completion of a technical analysis of water supplies. Completion of an experimental design plan. Development of a harvest management plan. Assessment of potential genetic risks. Project coordination with all other affected parties. Submission of a preliminary design report to the Council. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

Physical Description

22 pages

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: DOE/BP-00245-1
  • Grant Number: None
  • DOI: 10.2172/920099 | External Link
  • Office of Scientific & Technical Information Report Number: 920099
  • Archival Resource Key: ark:/67531/metadc901175

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • March 1, 1990

Added to The UNT Digital Library

  • Sept. 27, 2016, 1:39 a.m.

Description Last Updated

  • Nov. 30, 2016, 5:12 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

United States. Bonneville Power Administration. Preliminary Design Report for the Yakima/Klickitat Production Project; Executive Summary., report, March 1, 1990; Portland, Oregon. (digital.library.unt.edu/ark:/67531/metadc901175/: accessed August 20, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.