This report documents the LLNL TSF upgrade ASC L2 milestone 2351: Terascale Simulation Facility upgrade, due Sept. 30, 2007. The full text of the milestone is included in Attachment 1. The stated goal of the milestone was: 'Complete a 3-MW expansion of electrical power for computing systems in the east computer room of the Terascale Simulation Facility (TSF) and complete the final connection of all air handlers that were delivered as part of the TSF line item'. In this report we detail the upgrade and cover the results of the process to accept the system by testing, adjusting, balancing and ... continued below

Physical Description

PDF-file: 10 pages; size: 55 Kbytes

Creation Information

Bailey, A M October 2, 2007.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This report documents the LLNL TSF upgrade ASC L2 milestone 2351: Terascale Simulation Facility upgrade, due Sept. 30, 2007. The full text of the milestone is included in Attachment 1. The stated goal of the milestone was: 'Complete a 3-MW expansion of electrical power for computing systems in the east computer room of the Terascale Simulation Facility (TSF) and complete the final connection of all air handlers that were delivered as part of the TSF line item'. In this report we detail the upgrade and cover the results of the process to accept the system by testing, adjusting, balancing and finally start-up of the system in accordance with the detailed project commissioning plan to be developed by the system engineers during the design phase of the project. The quarterly reports for the upgrade and the text of the project commissioning plan are included at the end of this document as Attachments 2 and 3.

Physical Description

PDF-file: 10 pages; size: 55 Kbytes

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: UCRL-TR-235238
  • Grant Number: W-7405-ENG-48
  • DOI: 10.2172/922309 | External Link
  • Office of Scientific & Technical Information Report Number: 922309
  • Archival Resource Key: ark:/67531/metadc895983

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • October 2, 2007

Added to The UNT Digital Library

  • Sept. 27, 2016, 1:39 a.m.

Description Last Updated

  • Dec. 5, 2016, 11:03 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 10

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Bailey, A M. Level-2 Milestone 2351: Terascale Simulation Facility Upgrade, report, October 2, 2007; Livermore, California. (digital.library.unt.edu/ark:/67531/metadc895983/: accessed July 16, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.