Annual Technical Progress Report of Radioisotope Power System Materials Production and Technology Program Tasks for October 1, 2004, Through September 30, 2005 Page: 41 of 43
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Min-K Testing and Characterization
Test Matrix: Preliminary Compression Tests
(Hour-Glass Specimen Geometries)41
Specimen Geometry Specimen Density 6y E Cperm
(Dimensions in mm) ID (lbs./in3) (psi) (psi) (%)
2219
1 0.0121 96 2131 1.93
1984
1880
3 0.0123 96 1857 1.41
1853
- a:2259
5 0.0123 118 2348 1.46
2013
3527
(2" Configuration a) 10 0.0130 91 3370 0.82
3342
2253
13 0.0126 105 2191 0.77
1885
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Annual Technical Progress Report of Radioisotope Power System Materials Production and Technology Program Tasks for October 1, 2004, Through September 30, 2005, report, September 30, 2005; Oak Ridge, Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc895975/m1/41/: accessed March 29, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.