Monitoring and Evaluation of Smolt Migration in the Columbia River Basin, Volume IV : Evaluation of the 1998 Predictions of the Run-timing of Wild Migrant Yearling and Subyearling Chinook and Steelhead, and Hatchery Salmon in the Snake River Basin Using Program RealTime.

PDF Version Also Available for Download.

Description

Program RealTime provided tracking and forecasting of the 1998 inseason outmigration via the internet for stocks of wild PIT-tagged spring/summer chinook. These stocks were from eight release sites above Lower Granite dam, including Bear Valley Creek, Catherine Creek, Elk Creek, Lake Creek, Imnaha River, Minam River, South Fork Salmon River, and Secesh River. Forecasts were also provided for a stock of hatchery-reared PIT-tagged summer-run sockeye from Redfish Lake and for the runs-at-large of Snake River wild yearling and subyearling chinook salmon, and steelhead. The 1998 Program RealTime performance was comparable to its performance in previous years for the whole-season evaluations ... continued below

Physical Description

88 pages

Creation Information

Burgess, Caitlin January 1, 1997.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Program RealTime provided tracking and forecasting of the 1998 inseason outmigration via the internet for stocks of wild PIT-tagged spring/summer chinook. These stocks were from eight release sites above Lower Granite dam, including Bear Valley Creek, Catherine Creek, Elk Creek, Lake Creek, Imnaha River, Minam River, South Fork Salmon River, and Secesh River. Forecasts were also provided for a stock of hatchery-reared PIT-tagged summer-run sockeye from Redfish Lake and for the runs-at-large of Snake River wild yearling and subyearling chinook salmon, and steelhead. The 1998 Program RealTime performance was comparable to its performance in previous years for the whole-season evaluations for every stock tracked. Relative to 1997, performance improved for the yearling chinook run-at-large, and for predictions for last-half of the season for every other stock. Performance compared poorly with 1997 predictions for the first half of the runs of PIT-tagged yearling spring/summer chinook stocks and the run-at-large of fall subyearling chinook, and was slightly worse for the first half of the Redfish Lake sockeye run and the steelhead run-at-large. Poor first-half performance was likely due to the unusually large (and in some cases short) outmigrations in 1998. Utilization in 1998 of a different method of adjusting smolt counts at Lower Granite Dam compared to previous years produced slightly better first-half performance than pre-1998 adjustments would have, but slightly worse last-half performance, for all the PIT-tagged stocks, prompting a return to the pre-1998 adjustment formula for the 1999 outmigration. An Army Corp of Engineers (ACOE) experiment during April and May of 1998 involving the installation of two new components to existing structures at Lower Granite Dam did not appear to affect RealTime performance. A comparison of run-timing predictions based on FPC passage indices and Battelle hydroacoustic counts showed the two independent data sources produced very similar results, for the wild steelhead and yearling chinook runs-at-large. Due to the less than desirable first half performance in 1998, a refinement in the calibration process for Program RealTime will be conducted in the future.

Physical Description

88 pages

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: DOE/BP-91572-7
  • Grant Number: Not available
  • DOI: 10.2172/922249 | External Link
  • Office of Scientific & Technical Information Report Number: 922249
  • Archival Resource Key: ark:/67531/metadc894837

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • January 1, 1997

Added to The UNT Digital Library

  • Sept. 27, 2016, 1:39 a.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Burgess, Caitlin. Monitoring and Evaluation of Smolt Migration in the Columbia River Basin, Volume IV : Evaluation of the 1998 Predictions of the Run-timing of Wild Migrant Yearling and Subyearling Chinook and Steelhead, and Hatchery Salmon in the Snake River Basin Using Program RealTime., report, January 1, 1997; United States. (digital.library.unt.edu/ark:/67531/metadc894837/: accessed August 20, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.