The following text was automatically extracted from the image on this page using optical character recognition software:
2005 Cross Section Analysis and Pump Test Plan, Everest, Kansas 5-]
Version 00, 10/21/05
5 References
Argonne, 2001, Final Phase I Report and Phase II Work Plan: QuickSite Investigation,
Everest, Kansas, prepared for the Commodity Credit Corporation, U.S. Department of
Agriculture, by Argonne National Laboratory, Argonne, Illinois, August (revised March 2003).
Argonne, 2003, Final Phase II Report: QuickSite Investigation, Everest, Kansas, ANL/ER/TR-
03/003, prepared for the Commodity Credit Corporation, U.S. Department of Agriculture, by
Argonne National Laboratory, Argonne, Illinois, September.
Argonne, 2004, Draft Report: Phase III Targeted Investigation, Everest, Kansas, ANL/ER/TR-
04/004, prepared for the Commodity Credit Corporation, U.S. Department of Agriculture, by
Argonne National Laboratory, Argonne, Illinois, September.
Argonne, 2005, Scoping Memo for the Discussion of Potential Remedial Options for the
Groundwater Contamination Site at Everest, Kansas, ANL/ER/AGEM/CHRON-883, prepared
for the Commodity Credit Corporation, U.S. Department of Agriculture, by Argonne National
Laboratory, Argonne, Illinois, September 6.