Asbestos-cement (Transite) pipe was installed at the Raft River Geothermal Area in the fall of 1975 and has been used extensively since. The pipe is used to transfer water from the well sites to the testing areas, reserve pits, and reinjection wells. The pipeline was designed to transport approximately 300 F water at 150 psi over a period of time for the present testing program and later, for the 5 MW(e) Raft River Pilot Plant. Numerous line failures have occurred since the original lines were installed. Due to the various causes of the line failures and the extensive downtime which ... continued below

Creation Information

Walrath, L.F. January 1, 1980.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Asbestos-cement (Transite) pipe was installed at the Raft River Geothermal Area in the fall of 1975 and has been used extensively since. The pipe is used to transfer water from the well sites to the testing areas, reserve pits, and reinjection wells. The pipeline was designed to transport approximately 300 F water at 150 psi over a period of time for the present testing program and later, for the 5 MW(e) Raft River Pilot Plant. Numerous line failures have occurred since the original lines were installed. Due to the various causes of the line failures and the extensive downtime which has occurred because of them, further examination of Transite pipe is necessary to determine its future use as completion of the 5 MW(e) pilot plant approaches. The Conversion Technology and Engineering Branch has completed a preliminary study of the effects of S&I system transients on Transite pipe (re: OJD-7-79). Recommendations are proposed to conduct further studies and tests; however, no funding is presently available due to limitations in the budget for the 5 MW(e) pilot plant project. The Mechanical Design Branch is continuing design analysis in an effort to gather information to determine maximum warmup rates for the S&I system.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: PG-G-79-020
  • Report No.: EGG/ITR-80-01
  • Grant Number: None
  • DOI: 10.2172/896030 | External Link
  • Office of Scientific & Technical Information Report Number: 896030
  • Archival Resource Key: ark:/67531/metadc886528

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • January 1, 1980

Added to The UNT Digital Library

  • Sept. 22, 2016, 2:13 a.m.

Description Last Updated

  • Feb. 16, 2017, 6:18 p.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Walrath, L.F. Internal Technical Report, Summary of Raft River Supply and Injection System Operational History, report, January 1, 1980; Idaho Falls, Idaho. (digital.library.unt.edu/ark:/67531/metadc886528/: accessed September 22, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.