Internal Technical Report, Software Requirements and Design Guide for the 5MW(e) Raft River Pilot Plant

PDF Version Also Available for Download.

Description

The 5MW(e) electrical generating plant is a demonstrational unit intended to provide engineering data basic to improvement of geothermal-electric technology. It is anticipated that the plant will operate on a production basis after initial testing, and that periodic re-testing will be done to measure the effects of fouling in heat exchanges and aging generally. The initial tests will confirm engineering estimates of performance, and will identify optimum feasible operatinq conditions and maximum power generating capacity. They will also identify any anomalous plant behavior not foreseen. Several tests will lead to quantification of constant and variable terms used in thermodynamic relationships ... continued below

Creation Information

Metcalf, D.D. & Cole, M.S. May 15, 1980.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The 5MW(e) electrical generating plant is a demonstrational unit intended to provide engineering data basic to improvement of geothermal-electric technology. It is anticipated that the plant will operate on a production basis after initial testing, and that periodic re-testing will be done to measure the effects of fouling in heat exchanges and aging generally. The initial tests will confirm engineering estimates of performance, and will identify optimum feasible operatinq conditions and maximum power generating capacity. They will also identify any anomalous plant behavior not foreseen. Several tests will lead to quantification of constant and variable terms used in thermodynamic relationships descriptive of plant and subsystem behavior. Because the product of the testing will be confirmatory engineering data heretofore unavailable, the plant has been carefully instrumented, with either explicit or implicit instrumentation redundancy for most parameters to be measured. The 5MW(e) data system collects the data directly from the instrumentation. Enhancements such as on-line analytical routines may be added later, but initially, data capture shall be the sole activity of the data system. The 5MW(e) plant converts the energy of geothermally heated water to electrical energy conforming to 60 Hz commercial power standards. The plant capacity is sufficiently large to be useful in a demonstrational sense, but is limited to a capacity conservative of the geothermal energy resource, which hasn't been fully explored. The 5MW(e) plant will continue on a regular production basis after completion of the testing. Additional production units may be added at a later time.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: IS-M-80-100
  • Report No.: EGG/ITR-80-03
  • Grant Number: None
  • DOI: 10.2172/896033 | External Link
  • Office of Scientific & Technical Information Report Number: 896033
  • Archival Resource Key: ark:/67531/metadc884786

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 15, 1980

Added to The UNT Digital Library

  • Sept. 22, 2016, 2:13 a.m.

Description Last Updated

  • Feb. 16, 2017, 6:18 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 1

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Metcalf, D.D. & Cole, M.S. Internal Technical Report, Software Requirements and Design Guide for the 5MW(e) Raft River Pilot Plant, report, May 15, 1980; Idaho Falls, Idaho. (digital.library.unt.edu/ark:/67531/metadc884786/: accessed September 19, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.