Results of Dose Control and Measurement Plans Appliedfor SPEAR3 Commissioning Year (FY04)

PDF Version Also Available for Download.

Description

Dose control and measurement plans for the SPEAR3 Booster and storage ring have taken place during the SPEAR3 commissioning. The initial commissioning period (SPEAR3 start-up) covered the time period from the beginning of November 2003 to the early part of March 2004. The period from the beginning of March to the beginning of August 2004 has been mostly dedicated to the scientific program. The initial commissioning period was characterized with frequent injection and significantly higher losses. In comparison, the scientific program period was characterized with more stable beam operation with limited number of injections per day and lower beam losses. ... continued below

Physical Description

19 pages

Creation Information

Khater, Hesham; Liu, James; Prinz, Alyssa; Allan, Jim; Rokni, Sayed & /SLAC February 12, 2007.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

Dose control and measurement plans for the SPEAR3 Booster and storage ring have taken place during the SPEAR3 commissioning. The initial commissioning period (SPEAR3 start-up) covered the time period from the beginning of November 2003 to the early part of March 2004. The period from the beginning of March to the beginning of August 2004 has been mostly dedicated to the scientific program. The initial commissioning period was characterized with frequent injection and significantly higher losses. In comparison, the scientific program period was characterized with more stable beam operation with limited number of injections per day and lower beam losses. Three types of dose measurements, passive, active and special measurements, were implemented around the SPEAR3 Booster and storage ring. Based on the expected radiation hazards, several dose control measures were adopted at several stages of the commissioning. In the early stages of commissioning, areas within 4.5 m from the walls of the Booster and storage ring were designated as Radiation Areas (RA). Areas outside RA were classified as Radiologically Controlled Area (RCA). Access to these areas required less training than the radiation areas. A monthly review of the accelerator operation conditions and radiation measurement results were used to determine the changes needed for the RA classification status and associated dose control measures.

Physical Description

19 pages

Source

  • Journal Name: Radiation Measurements

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Report No.: SLAC-PUB-12309
  • Grant Number: AC02-76SF00515
  • Office of Scientific & Technical Information Report Number: 899562
  • Archival Resource Key: ark:/67531/metadc880124

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • February 12, 2007

Added to The UNT Digital Library

  • Sept. 22, 2016, 2:13 a.m.

Description Last Updated

  • Dec. 9, 2016, 6:59 p.m.

Usage Statistics

When was this article last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Khater, Hesham; Liu, James; Prinz, Alyssa; Allan, Jim; Rokni, Sayed & /SLAC. Results of Dose Control and Measurement Plans Appliedfor SPEAR3 Commissioning Year (FY04), article, February 12, 2007; [Menlo Park, California]. (digital.library.unt.edu/ark:/67531/metadc880124/: accessed July 15, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.