Downhole Vibration Monitoring & Control System

PDF Version Also Available for Download.

Description

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field ... continued below

Creation Information

Cobern, Martin E. March 31, 2007.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in a drilling laboratory. Phase II concluded on January 31, 2006, and the Phase II final report was issued. Work on Phase III of the project began during the first quarter, 2006. Efforts the current quarter have continued to focus on the manufacture of the prototype and precommercial parts, field test planning and commercialization. The continued extreme lead times quoted by oilfield machine shops for collar components significantly delayed the deployment of the prototype and precommercial units. All parts have now been received for two units, and all but one for the third. Mechanical assembly of the first two systems is complete and the electronics installation and laboratory testing will be finished in April. We have entered into a Memorandum of Understanding with a major US oilfield equipment supplier, which calls for their assisting with our field tests, in cash and in kind. We are close to signing a definitive agreement which includes the purchase of the three precommercial units. We had also signed a CRADA with the Rocky Mountain Oilfield Test Center (RMOTC), and scheduled a test at their site, The RMOTC drilling schedule continues to slip, and the test cannot begin until the first week of May. Based on these factors, we have requested a no-cost extension to July 31, 2007.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: None
  • Grant Number: FC26-02NT41664
  • DOI: 10.2172/903219 | External Link
  • Office of Scientific & Technical Information Report Number: 903219
  • Archival Resource Key: ark:/67531/metadc879826

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • March 31, 2007

Added to The UNT Digital Library

  • Sept. 22, 2016, 2:13 a.m.

Description Last Updated

  • Dec. 7, 2016, 10:56 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 1

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Cobern, Martin E. Downhole Vibration Monitoring & Control System, report, March 31, 2007; United States. (digital.library.unt.edu/ark:/67531/metadc879826/: accessed October 24, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.