An initial feasibility study of options to treat the uranium plume at the 300-FF-5 Operable Unit considered hydraulic containment, slurry wall containment, and groundwater extraction as potential remedial action technologies. None were selected for interim action, and reduction of contamination levels by natural processes was considered a viable alternative while source removal actions continued. Subsequent planning for a Phase III feasibility study focused on methods that would reduce the concentration of uranium in the aquifer, including multiple methods to immobilize uranium using chemical-based technologies. Based on an initial technology screening, the polyphosphate technology was identified as the best candidate to ... continued below

Physical Description

PDFN

Creation Information

Vermeul, Vince R.; Fruchter, Jonathan S.; Wellman, Dawn M.; Williams, Bruce A. & Williams, Mark D. December 1, 2006.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

An initial feasibility study of options to treat the uranium plume at the 300-FF-5 Operable Unit considered hydraulic containment, slurry wall containment, and groundwater extraction as potential remedial action technologies. None were selected for interim action, and reduction of contamination levels by natural processes was considered a viable alternative while source removal actions continued. Subsequent planning for a Phase III feasibility study focused on methods that would reduce the concentration of uranium in the aquifer, including multiple methods to immobilize uranium using chemical-based technologies. Based on an initial technology screening, the polyphosphate technology was identified as the best candidate to treat the for further evaluation and selected for treatability testing. The overall objective of the polyphosphate treatability test is to evaluate the efficacy of using polyphosphate injections to treat uranium contaminated groundwater in situ. The objective of the work elements included in this site characterization plan is to collect site-specific characterization data that will be needed to design and implement a field-scale demonstration of the technology.

Physical Description

PDFN

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: PNNL-16008
  • Grant Number: AC05-76RL01830
  • DOI: 10.2172/896905 | External Link
  • Office of Scientific & Technical Information Report Number: 896905
  • Archival Resource Key: ark:/67531/metadc879630

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • December 1, 2006

Added to The UNT Digital Library

  • Sept. 22, 2016, 2:13 a.m.

Description Last Updated

  • Dec. 7, 2016, 9:19 p.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Vermeul, Vince R.; Fruchter, Jonathan S.; Wellman, Dawn M.; Williams, Bruce A. & Williams, Mark D. Site Characterization Plan: Uranium Stabilization through Polyphosphate Injection, report, December 1, 2006; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc879630/: accessed August 23, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.