CRC DEPLETION CALCULATIONS FOR THE RODDED ASSEMBLIES IN BATCHES 1, 2, 3, AND 1X OF CRYSTAL RIVER UNIT 3 Page: 2 of 590
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Design Analysis Revision Record
CRWMSIM&O
Page: 2
Of: 146
2. DESIGN ANALYSIS TITLE
CRC Depletion Calculations for the Rodded Assemblies in Batches 1, 2, 3, and 1X of Crystal River Unit 3
3. DOCUMENT IDENTIFIER (Including Rev. No.)
BBA000000-01717-0200-00040 REV 00
4. Revision No. 5. Description of RevisionInitial Issuance Copy
GAP-3D (Elf mOm 01531961 0487 Rn 12I141991
Complete only applicable items.
00
UAP-3.9 (Effetiv 011031861
0467 Mwe 121141951
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Wright, Kenneth D. CRC DEPLETION CALCULATIONS FOR THE RODDED ASSEMBLIES IN BATCHES 1, 2, 3, AND 1X OF CRYSTAL RIVER UNIT 3, report, September 3, 1997; United States. (https://digital.library.unt.edu/ark:/67531/metadc877996/m1/2/: accessed April 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.