Milestone Report No. 3 is a progress report. Rogers Engineering Co., Inc. has investigated what sites are best suited for consolidation of power generating units 1 through 12 for processing the noncondensable gases through the Stretford Process for H{sub 2}S abatement below 10% of the mass flow. The consolidation arrangement for the power generating units are Units 1 through 6 which produces 187 MWe power. Units 7-8 and 11 producing 212 MWe and Units 9-10 and 12 which also produces 212 MWe power. Site survey and selection for the Stretford units provided for a primary and alternative site for each ... continued below

Creation Information

Creator: Unknown. June 29, 1979.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 16 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Milestone Report No. 3 is a progress report. Rogers Engineering Co., Inc. has investigated what sites are best suited for consolidation of power generating units 1 through 12 for processing the noncondensable gases through the Stretford Process for H{sub 2}S abatement below 10% of the mass flow. The consolidation arrangement for the power generating units are Units 1 through 6 which produces 187 MWe power. Units 7-8 and 11 producing 212 MWe and Units 9-10 and 12 which also produces 212 MWe power. Site survey and selection for the Stretford units provided for a primary and alternative site for each consolidation. Each of these three groups of plants is associated with its Stretford Process Plant. The gas blowers located at each power plant to push the noncondensable gases through the stainless steel pipe network to the Stretford Process have been sized. When combining the new auxiliary load requirements of these blowers and the Stretford units it was determined that additional auxiliary transformer capacity is necessary. We are investigating additional alternatives with respect to the Stretford Process application. This data will be submitted in the Final Report, See Section 6.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: None
  • Grant Number: None
  • DOI: 10.2172/883324 | External Link
  • Office of Scientific & Technical Information Report Number: 883324
  • Archival Resource Key: ark:/67531/metadc874071

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 29, 1979

Added to The UNT Digital Library

  • Sept. 21, 2016, 2:29 a.m.

Description Last Updated

  • Dec. 6, 2016, 3:39 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 16

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

PGandE Geysers Retrofit Project, Milestone Report No. 3 (Stretford Processes Units 1-12), report, June 29, 1979; United States. (digital.library.unt.edu/ark:/67531/metadc874071/: accessed October 22, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.