The geopressured zone, assuming the presence of natural gas and high water productivity, may be used to produce economical electric power only if the water is at least 375 F or a means of conversion more efficient than flashing is found. The design and costing of a double-flash 25-megawatt plant using water at 325 F gave a capital cost of $678/kwh, a fuel cost of 63?/M Btu and a unit power cost of 46 mills/kwh. The conversion efficiency of the plant, including hydraulic turbine energy from the well head overpressure, was 10.3%. This low efficiency accounts for the high unit ... continued below

Creation Information

Underhill, Gary K.; Carlson, Ronald A.; Clendinning, William A.; Erdos, Jozsef; Gault, John; Hall, James W. et al. January 1, 1976.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

The geopressured zone, assuming the presence of natural gas and high water productivity, may be used to produce economical electric power only if the water is at least 375 F or a means of conversion more efficient than flashing is found. The design and costing of a double-flash 25-megawatt plant using water at 325 F gave a capital cost of $678/kwh, a fuel cost of 63?/M Btu and a unit power cost of 46 mills/kwh. The conversion efficiency of the plant, including hydraulic turbine energy from the well head overpressure, was 10.3%. This low efficiency accounts for the high unit power cost. A one-well, 1.5-megawatt test facility will require a total capital cost of $6,661,000. Expansion of this site to a four-well, 10-megawatt pilot plant will require an additional capital expenditure of $27,843,000. The total capital cost for an independent 10-megawatt pilot plant was estimated at $31,777,000. It should be noted that the economics calculated in this report is based on industrial power plant experience. Maintenance, operating costs, and rate of return for industrial investment, as used in the calculations, do not reflect utility plant practices. The cost of power producing may compare more favorably with that of utility plants. Future power costs are projected to at least equal the costs expressed here.

Source

  • 2. geopressured energy conference, Austin, TX, USA, 23 Feb 1976

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Report No.: CONF-760222--P4-App. B
  • Grant Number: E(40-1)-4900
  • Office of Scientific & Technical Information Report Number: 886580
  • Archival Resource Key: ark:/67531/metadc873636

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • January 1, 1976

Added to The UNT Digital Library

  • Sept. 21, 2016, 2:29 a.m.

Description Last Updated

  • Jan. 18, 2018, 4:39 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 1

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Underhill, Gary K.; Carlson, Ronald A.; Clendinning, William A.; Erdos, Jozsef; Gault, John; Hall, James W. et al. Dow Chemical USA Report - Appendix B, article, January 1, 1976; Austin, Texas. (digital.library.unt.edu/ark:/67531/metadc873636/: accessed June 23, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.