Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.

Physical Description

xii, 83, [10] p. : ill. ; 28 cm.

Creation Information

Aerojet-General Corporation February 15, 1964.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 121 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

  • Added Title: ARMY GAS-COOLED REACTOR SYSTEMS PROGRAM. Quarterly Progress Report, October 1-December 31, 1963
  • Main Title: Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963
  • Serial Title: Army Gas-Cooled Reactor Systems Program Progress Report
  • Added Title: U.S. Atomic Energy Commission Idaho Operations Office Report IDO-28621

Description

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.

Physical Description

xii, 83, [10] p. : ill. ; 28 cm.

Notes

Partial abstract (p. v): The ML-1 power plant did not operate during the report period; low power reactor physics and shielding experiments were conducted with the ML-1 reactor. Evaluation of moderate corrosion observed on aluminum parts exposed to the ML-1 shield solution indicated no loss of performance capability. Preliminary tests showed that the corrosion probably was caused by heavy metal ions or chlorides in the solution, Massive corrosion observed on the ML-1 fuel element lower spiders was attributed to sub-standard material; failure of some spiders was attributed to a combination of corrosion and sub-standard fabrication. Evaluation indicated that the upper spiders will perform satisfactorily for the design lifetime. Modification, repair, and reassembly of the CSN-1A t-c set was completed. Operation demonstrated bearing stability, but showed that the turbine effective flow area was too large. A bypass flow path in the turbine was being corrected. The TCS-670 t-c set will be stored indefinitely. Since a commercial alternator will be used for the ML-1A, further development of the brushless alternator was postponed indefinitely. Evaluation revealed that the ML-1 improved precooler design was not compatible with ML-1A requirements. Operation of the IB-17R-2 and -3 test elements in the GETR continued without incident. Preliminary design of the ML-1A power plant was initiated. Design of modifications to the GCRE facility to adapt it to testing the ML-1 reactor skid was initiated. (auth)

Other Information: Orig. Receipt Date: 31-DEC-64

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Relationships

  • Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963, ark:/67531/metadc67295/

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

Related Items

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963 (Report)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.

Relationship to this item: (Is Version Of)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963, ark:/67531/metadc67295/

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • February 15, 1964

Coverage Date

Added to The UNT Digital Library

  • Sept. 16, 2016, 12:32 a.m.

Description Last Updated

  • Nov. 22, 2016, 9:04 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 121

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Aerojet-General Corporation. Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963, report, February 15, 1964; San Ramon, California. (https://digital.library.unt.edu/ark:/67531/metadc872378/: accessed April 22, 2025), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen